• Thumbnail for Afşin
    Afşin is a municipality and district of Kahramanmaraş Province, Turkey. Its area is 1,502 km2, and its population is 80,044 (2022). It is the location...
    4 KB (231 words) - 15:06, 14 August 2024
  • Thumbnail for Afşin-Elbistan power stations
    The Afşin-Elbistan power stations are two coal-fired power stations in Turkey, in Afşin District in Kahramanmaraş Province. Both Afşin-Elbistan A, built...
    46 KB (4,877 words) - 15:30, 10 October 2024
  • Thumbnail for Elbistan
    The Elbistan coalfield supplies lignite to the nearby Afşin-Elbistan power stations in Afşin. It is said that air pollution in Turkey from the nearby...
    16 KB (1,238 words) - 21:44, 22 October 2024
  • Kangal power station is a 457 MW coal-fired power station in Turkey in Sivas, mostly built in the late 20th century, which burns lignite mined locally...
    2 KB (195 words) - 10:28, 22 August 2023
  • would be built,: 11  although Çelikler Holding still want to add units to Afşin Elbistan A. The national plan forecasts coal generation decreasing but capacity...
    87 KB (7,366 words) - 14:55, 30 September 2024
  • are listed on the Turkish version of this article. 18 Mart Çan Afşin-Elbistan A Afşin-Elbistan B Afyon Sugar Aksa Akrilik Albayrak Atlas Enerji İskenderun...
    53 KB (1,854 words) - 13:16, 22 August 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    1 KB (57 words) - 00:14, 4 November 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    6 KB (506 words) - 19:32, 12 October 2023
  • Thumbnail for Turkish dialects
    Alucra, Suşehri 3.6.4. Kangal, Divriği, Gürün, Malatya, Hekimhan, Arapkir 3.7.1. Akçadağ, Darende, Doğanşehir 3.7.2. Afşin, Elbistan, Göksun, Andırın...
    18 KB (1,945 words) - 14:09, 30 January 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    1 KB (78 words) - 08:58, 4 November 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    4 KB (321 words) - 08:05, 1 November 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (160 words) - 18:56, 3 November 2024
  • Thumbnail for Çatalağzı power station
    Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    6 KB (553 words) - 11:22, 28 March 2024
  • Thumbnail for Kızıldere Geothermal Power Plant
    Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    15 KB (1,319 words) - 14:58, 31 October 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    7 KB (523 words) - 06:33, 1 November 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    1,002 bytes (59 words) - 09:10, 4 November 2024
  • Thumbnail for Hamitabat power station
    Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    3 KB (215 words) - 14:30, 3 November 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (122 words) - 21:35, 23 February 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (181 words) - 11:28, 16 November 2022
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    3 KB (206 words) - 07:29, 13 March 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (146 words) - 14:41, 26 October 2023
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    1 KB (73 words) - 03:35, 4 November 2024
  • Thumbnail for Districts of Turkey
    Gemerek: 22,845 Gölova: 3,664 Gürün: 18,771 Hafik: 9,819 İmranlı: 7,668 Kangal: 21,272 Koyulhisar: 12,936 Sivas: 381,325 Suşehri: 25,159 Şarkışla: 38,408...
    42 KB (2,619 words) - 21:57, 29 July 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (131 words) - 17:50, 4 May 2022
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (179 words) - 14:56, 23 September 2023
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    4 KB (264 words) - 00:02, 4 March 2023
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    5 KB (428 words) - 22:48, 2 March 2024
  • Thumbnail for List of largest cities and towns in Turkey
    211 Konya 165 Silvan 60,731 64,136 47,105 42,736 38,367 Diyarbakır 166 Afşin 28,524 35,834 38,625 38,409 38,193 Kahramanmaraş 167 Burhaniye 21,805 31...
    98 KB (437 words) - 02:01, 13 September 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    4 KB (389 words) - 17:27, 23 May 2024
  • Coal-fired Afşin-Elbistan C – 1800 MW proposed Afşin-Elbistan B – 1440 MW ZETES-3 – 1400 MW Afşin-Elbistan A – 1355 MW Cenal – 1320 MW Emba Hunutlu – 1320...
    2 KB (133 words) - 14:45, 26 October 2023