• Thumbnail for Siemens Mireo
    The Siemens Mireo is a family of electric multiple units (EMU) designed by Siemens Mobility. It is designed to be a successor to the "Mainline" variant...
    8 KB (700 words) - 16:45, 19 September 2024
  • Thumbnail for Battery electric multiple unit
    from April 2024 on electrified and unelectrified track, the 120 seat Siemens Mireo Plus B battery-powered/overhead power line trains. On only battery operation...
    41 KB (4,472 words) - 02:28, 23 September 2024
  • Siemens Mobility is a division of Siemens. With its global headquarters in Munich, Siemens Mobility has four core business units: Mobility Management,...
    22 KB (1,200 words) - 18:47, 19 August 2024
  • operated by new Siemens Mireo rolling stock. A corresponding contract for 57 three-part sets was signed between DB Regio AG and Siemens in August 2017...
    52 KB (4,568 words) - 14:00, 24 August 2024
  • and in 6 minutes (i.e. at 8C) for the 23 Ah cell. In April 2024, four Siemens Mireo Plus B battery-electric trains were placed into service, powered by...
    21 KB (2,056 words) - 22:12, 22 August 2024
  • Thumbnail for List of Deutsche Bahn AG locomotives and railbuses
    450 GT8-100C/2S Stadtbahn Karlsruhe Retired 462 Siemens Desiro HC Regional services 463 Siemens Mireo S-Bahn Services: Rhine-Neckar, S-Bahn Mitteldeutschland...
    27 KB (151 words) - 23:48, 19 August 2024
  • Finsterwalde (Niederlausitz) – Calau (Nl) – Cottbus 215 Every 2 hours Siemens Mireo DB Regio Nordost RE 11 Leipzig Hbf – Taucha – Eilenburg – Torgau – Beilrode –...
    59 KB (104 words) - 14:14, 18 September 2024
  • Thumbnail for Niederbarnimer Eisenbahn
    battery-electric multiple units (Siemens Mireo+B), while the Heidekrautbahn service will use hydrogen trains (Siemens Mireo+H). Since September 2023, NEB...
    15 KB (1,517 words) - 06:23, 19 August 2024
  • Andernach – Koblenz – Bingen – Mainz Hbf 470 trans regio 1–2 × 460 Siemens Mireo RB 29 Lower Westerwald Railway Dieselnetz Eifel-Westerwald-Sieg Limburg...
    35 KB (260 words) - 13:24, 24 August 2024
  • of 2009 to 2022. Since the timetable change in December 2022, Siemens Mireo and Siemens Desiro HC multiple units have been used for the services operated...
    17 KB (1,746 words) - 14:03, 2 April 2024
  • Donauwörth–Treuchtlingen Munich–Augsburg 920, 910, 980 Arverio Bayern Siemens Mireo (463) Siemens Desiro HC (462) RB 80 Some trains in the peak Mainfrankenbahn...
    78 KB (413 words) - 13:51, 31 July 2024
  • Thumbnail for Stuttgart-Bad Cannstatt–Nördlingen railway
    operations on 9 June 2019, Stadler FLIRT multiple units have been used. Siemens Mireo electric multiple units are operated by Go-Ahead Bayern between Aalen...
    24 KB (2,916 words) - 06:18, 19 August 2024
  • Falkenberg – Doberlug-Kirchhain – Cottbus – Guben – Frankfurt (Oder) 120 Siemens Mireo (class BR 463) DB Regio Nordost RE 11 Leipzig – Eilenburg – Torgau –...
    18 KB (56 words) - 12:48, 21 August 2024
  • Thumbnail for Treuchtlingen–Würzburg railway
    transport for twelve years. The line is now operated with three-carriage Siemens Mireo electric multiple units. The line is of great importance for freight...
    12 KB (865 words) - 17:47, 13 August 2024
  • operate". Two other hydrogen trains have been reported as of 2023: Mireo Plus H by Siemens in Germany (under development) and an urban train by the Railway...
    67 KB (6,652 words) - 00:47, 25 September 2024