Total element long-run incremental cost (TELRIC) is a calculation method that the United States Federal Communications Commission (FCC) requires incumbent...
2 KB (276 words) - 03:03, 24 April 2023
and has required the states to use a methodology called total element long-run incremental cost (TELRIC). Leased line Local loop unbundling Product bundling...
4 KB (493 words) - 01:26, 29 July 2024
Progress Indicator Opportunity cost Pollution credit Total cost Total cost of ownership True cost accounting Whole-life cost See Green economics. Schaltegger...
13 KB (1,761 words) - 15:51, 18 July 2024
loyalty. Incremental sales – sales driven by marketing and promotional activities. This component can be further decomposed into incremental drivers of...
34 KB (4,714 words) - 21:09, 17 October 2024
amortized cost is an upper bound on the actual cost. Usually, many short-running operations accumulate such credit in small increments, while rare long-running...
9 KB (1,174 words) - 23:19, 21 July 2024
Priority queue (section K-element operations)
performing a batch insert, merging two or more queues into one, incrementing priority of any element, etc. Stacks and queues can be implemented as particular...
32 KB (4,891 words) - 21:19, 13 October 2024
engineering. Incremental information sharing helps minimize the chance that concurrent product realization will lead to surprises. "Incremental" meaning that...
19 KB (2,350 words) - 19:15, 3 September 2023
Quicksort (section Partial and incremental quicksort)
index the middle element, at the cost of more complex arithmetic. Similar issues arise in some other methods of selecting the pivot element. With a partitioning...
71 KB (9,936 words) - 17:41, 23 August 2024
that it is both simpler to implement and faster than incremental garbage collection. Incremental and concurrent garbage collectors are designed to reduce...
37 KB (5,282 words) - 06:31, 29 October 2024
selection algorithm, most commonly quickselect, that selects the kth smallest element of an initially unsorted array. Median of medians finds an approximate...
18 KB (2,554 words) - 21:15, 16 April 2024
This data structure is used by the Boost Graph Library to implement its Incremental Connected Components functionality. It is also a key component in implementing...
33 KB (4,645 words) - 20:24, 30 October 2024
Predatory pricing (redirect from Selling below cost)
dominant firm does not cover its average avoidable costs or long-run average incremental costs, this implies the dominant firm is operating at a loss...
70 KB (8,274 words) - 00:18, 29 October 2024
construction completed in 2016, followed by years of exhaustive testing, at a total cost of US$10 billion. The mass of the James Webb Space Telescope (JWST) is...
213 KB (19,836 words) - 17:48, 6 November 2024
as long as the total number of insertions or deletions exceeds the number of elements at the time of last construction, the amortized expected cost of...
13 KB (1,596 words) - 11:04, 16 May 2023
increasing the overall length of the Model 1911 carbine, moving the rear sight element closer to the eye, and cutting in half the amount of time for the firing...
30 KB (3,478 words) - 15:30, 13 August 2024
requirements. Incremental Prototyping: Incremental prototyping is a software development approach that combines the principles of prototyping and incremental development...
39 KB (4,681 words) - 17:55, 1 November 2024
and page in a typical typewriter of the period, the Selectric had an "element" (frequently called a "typeball", or less formally, a "golf ball") that...
68 KB (8,828 words) - 00:13, 6 September 2024
IBM System z9 (section Support Element & HMC)
Support Element. All preceding zSeries mainframes used a modified version of OS/2 with custom software to provide the interface. System z9's HMC no longer uses...
15 KB (1,811 words) - 05:46, 8 December 2022
of three, with 15 per set for a total of 45 missiles. Initial deployment of the Griffin was set for 2015, with a longer-ranged version to enter service...
138 KB (12,753 words) - 03:10, 19 October 2024
Retrieved 4 August 2016. Peng, D., & Dabek, F. (2010, October). Large-scale Incremental Processing Using Distributed Transactions and Notifications. In OSDI...
46 KB (5,492 words) - 19:57, 2 November 2024
Interest (redirect from Cost of money)
the annual revenue which will be yielded by an extra increment of capital as a proportion of its cost. So the interest rate r in equilibrium will be equal...
71 KB (10,075 words) - 12:36, 16 October 2024
memory by a factor of 8, to a total of 32,768 words. This expansion was thought sufficient because, with core memory then costing about 50 cents a word, a...
57 KB (7,011 words) - 20:19, 25 October 2024
SIMD ADD: element 0 of first group added to element 0 of second group x[1]+x[5] - Second SIMD ADD: element 1 of first group added to element 1 of second...
61 KB (8,656 words) - 11:28, 5 November 2024
Tranches are a production/funding distinction, and do not imply an incremental increase in capability with each tranche. Tranche 3 are based on late...
217 KB (20,930 words) - 11:01, 3 November 2024
Space-based solar power (redirect from Space Solar Power Incremental Demonstrations and Research Project)
in space array diameter of 2.5x increases the array element count by 6.25x, which increases total power transmitted by this factor. In addition for a...
109 KB (12,551 words) - 16:19, 16 October 2024
Economic policy of the Donald Trump administration (section Ending cost-sharing reduction (CSR) payments)
individual tax cut elements expire as scheduled after 2025. This was incremental to the existing $20 trillion national debt at the time. Debt held by...
256 KB (28,825 words) - 17:05, 6 November 2024
how the information is presented to the user but only deals with which element of a shape of a product has which GD&T characteristic. A system supporting...
29 KB (2,678 words) - 19:13, 12 July 2024
$45M to meet demand for low-cost PCs and IoT, TechCrunch / Natasha Lomas@riptari(twitter), 21 September 2021, While, in total, the Pi Foundation also said...
219 KB (18,469 words) - 14:33, 29 October 2024
assessment and stated the SLS Program's change in cost estimates for the Booster and Engines element offices were not a removal of costs but rather a reallocation...
185 KB (14,982 words) - 07:23, 5 November 2024
Bus rapid transit (section Cost)
system is today over 18.5 miles long. The OC Transpo BRT system in Ottawa, Canada, was introduced in 1983. The first element of its BRT system was dedicated...
83 KB (8,613 words) - 14:34, 29 October 2024