The Level Crossing Removal Project (LXRP) is an infrastructure upgrade program by the Government of Victoria, Australia, to remove and grade-separate 110...
196 KB (10,534 words) - 02:02, 22 November 2024
Level Crossing Removal Project is a project by the Government of Western Australia to elevate part of the Armadale line, thereby removing six level crossings...
44 KB (3,649 words) - 11:11, 9 November 2024
government. This project was incorporated into the newly formed Level Crossing Removal Project in 2015. During 2015, construction began on the project with piling...
25 KB (1,888 words) - 07:46, 22 October 2024
ground level station closed and demolished in May 2022 and the current elevated station provided in September 2022 by the Level Crossing Removal Project. The...
25 KB (1,555 words) - 11:08, 22 November 2024
ground level, with some underground and elevated sections. There were more than 170 level crossings before the Level Crossing Removal Project commenced...
175 KB (14,049 words) - 00:30, 11 November 2024
ground level station closed and demolished in May 2022 and the current elevated station provided in September 2022 by the Level Crossing Removal Project. The...
22 KB (1,247 words) - 11:03, 22 November 2024
current name to "Glen Huntly" on 13 April 2023 as part of the Level Crossing Removal Project. Glen Huntly is a below ground host station, consisting of three...
20 KB (1,371 words) - 07:36, 22 October 2024
in 2018, a new elevated station was rebuilt as part of the Level Crossing Removal Project. Clayton station is currently served by the Pakenham and Cranbourne...
34 KB (2,196 words) - 07:39, 22 October 2024
as an elevated station, as part of the Victoria Park-Canning Level Crossing Removal Project. The new station will straddle Oats Street and feature an expanded...
36 KB (2,791 words) - 15:12, 29 August 2024
Victoria Park station to Armadale for the Victoria Park-Canning Level Crossing Removal Project and Byford extension. The Armadale line originated from suburban...
33 KB (2,259 words) - 09:31, 5 November 2024
Level Crossing Removal Project Take a birds-eye view of Hoppers Crossing Archived 6 May 2022 at the Wayback Machine - Level Crossing Removal Project "Werribee...
14 KB (813 words) - 22:24, 16 August 2024
Werribee line (section Level crossing removals)
consistent for the Altona Loop. The Level Crossing Removal Project has announced the removal of all remaining level crossings on the Werribee line, to be completed...
71 KB (4,609 words) - 05:09, 20 October 2024
Metro Tunnel (redirect from Metro Rail Capacity Project)
upgrades, the introduction of High Capacity Metro Trains, and the removal of all level crossings across the Pakenham, Cranbourne and Sunbury lines, it will allow...
158 KB (13,392 words) - 14:13, 21 November 2024
Pakenham line (section Level crossing removals)
of new rolling stock, the removal of all level crossings, and works associated with the Metro Tunnel project. These projects have improved the quality...
80 KB (4,803 words) - 12:40, 22 November 2024
decommissioned, with level crossings and railway infrastructure at these crossings removed. The Level Crossing Removal Project has removed, and is planning...
31 KB (2,811 words) - 04:42, 19 November 2024
It was delivered by Rail Projects Victoria (RPV) until April 2024, and then by the Level Crossing Removal Project. The project is guided by the 2016 Regional...
21 KB (1,554 words) - 12:17, 28 September 2024
development. The level crossing was a part of the first 50 crossings to be grade separated under the original scope of the Level Crossing Removal Project, which...
13 KB (777 words) - 06:58, 8 October 2024
announced that four level crossings will be removed in Melton and Truganina by the Level Crossing Removal Project. As part of these removals, Melton Station...
16 KB (950 words) - 09:27, 22 October 2024
station could be rebuilt as part of the Victoria Park-Canning Level Crossing Removal Project. The station opened in 1954 as Higham. The additional station...
8 KB (478 words) - 06:09, 12 October 2024
2021, as part of railway redevelopment works, including the Level Crossing Removal Project. A crossover is located at the up end of the station, which...
18 KB (989 words) - 08:47, 23 October 2024
closed on 17 February 2023, due to the works associated with the Level Crossing Removal Project. Mont Albert station opened on 11 August 1890 and, like the...
13 KB (665 words) - 06:18, 2 November 2024
Lilydale line (section Level Crossing Removals)
accessibility to the public. The Level Crossing Removal Project has removed all seven of the remaining level crossings on the Lilydale line, with works...
57 KB (3,050 words) - 02:47, 6 October 2024
closed on 20 November 2023 as part of the Victoria Park-Canning Level Crossing Removal Project. The original Cannington station was located between Station...
13 KB (829 words) - 06:08, 12 October 2024
Machine - Level Crossing Removal Project Getting on with the job in Glenroy Archived 4 July 2019 at the Wayback Machine - Level Crossing Removal Project New...
14 KB (796 words) - 12:40, 1 October 2024
Level Crossing Removal Project announced that the Camms Road level crossing would be grade-separated. On 25 June 2021, designs for the level crossing...
24 KB (1,418 words) - 07:38, 20 September 2024
premium station. In 2015, the Level Crossing Removal Project announced it was planning the grade separation of the crossing at Maroondah Highway. In 2019...
26 KB (1,584 words) - 11:08, 5 October 2024
April 2023. More level crossing removals on the way Archived 28 January 2021 at the Wayback Machine - Level Crossing Removal Project Gap Road, Sunbury...
19 KB (1,173 words) - 10:54, 27 September 2024
closed on 17 February 2023, due to the works associated with the Level Crossing Removal Project. Initially, two trains ran to Lilydale each day and five only...
16 KB (1,035 words) - 06:13, 2 November 2024
same time as a rebuild of Pakenham station, as part of the Level Crossing Removal Project. Until mid-2023, the state government referred to the station...
9 KB (469 words) - 11:36, 12 October 2024
closed on 20 November 2023 as part of the Victoria Park-Canning Level Crossing Removal Project, as it was located too close to the nearby Leach Highway bridge...
8 KB (577 words) - 19:48, 1 September 2024