• Thumbnail for M551 Sheridan replacement process
    Army competition in the 1990s to design a light tank to replace the M551 Sheridan and TOW-equipped HMMWVs. It was the ultimate incarnation of several...
    17 KB (2,351 words) - 20:55, 16 October 2024
  • Thumbnail for M551 Sheridan
    The M551 "Sheridan" AR/AAV (Armored Reconnaissance/Airborne Assault Vehicle) was a light tank developed by the United States and named after General Philip...
    62 KB (7,255 words) - 07:34, 31 March 2025
  • Thumbnail for High Survivability Test Vehicle (Lightweight)
    in the turret basket below the external gun system. M551 Sheridan M551 Sheridan replacement process M8 Armored Gun System Foss, Christopher F., ed. (1985)...
    9 KB (906 words) - 00:57, 26 January 2025
  • Thumbnail for Tanks of the United States
    in 1973 in the U.S. Marine Corps. The design of the M551 Sheridan was initiated when the replacement for the M41, the T92 Light Tank, was canceled. The...
    107 KB (14,815 words) - 00:17, 2 March 2025
  • Thumbnail for Mobile Protected Firepower
    the intended replacement for the M551 Sheridan, which the Army canceled due to budget considerations in 1996. The last user of M551 Sheridans, the 3/73rd...
    23 KB (2,258 words) - 03:43, 3 February 2025
  • Thumbnail for M22 Locust
    23. Zaloga, M551 Sheridan, p. 5. Fletcher, p. 72 Flint, pp. 24–25. Flint, p. 26. Zaloga, M551 Sheridan, pp. 7–8. Zaloga, M551 Sheridan, pp. 8–10. Flint...
    35 KB (4,753 words) - 16:28, 10 April 2025
  • Thumbnail for Assault gun
    the M50 and M56 from service within the US military was the M551 Sheridan. The Sheridan's gun was a low-velocity weapon suitable in the assault role,...
    19 KB (2,116 words) - 18:17, 24 January 2025
  • Thumbnail for M41 Walker Bulldog
    ceased production of the M41A1 in late 1954. It was replaced by the M551 Sheridan during the 1960s when the gun could not longer penetrate fielded medium...
    70 KB (7,500 words) - 03:41, 9 April 2025
  • Thumbnail for M8 armored gun system
    Buford, is an American light tank that was intended to replace the M551 Sheridan and TOW missile-armed Humvees in the 82nd Airborne Division and 2nd...
    133 KB (13,656 words) - 13:38, 1 April 2025
  • Thumbnail for T-10 tank
    be deployed widely during this period, and would become an effective replacement for the heavy tanks' long-range firepower. The Soviets made use of them...
    17 KB (1,983 words) - 15:55, 11 April 2025
  • Greece then was interested in buying M1 Abrams tanks from US stocks as replacements for its M60s. However, the deal was cancelled because Greece lacked adequate...
    61 KB (7,194 words) - 15:17, 1 April 2025
  • Thumbnail for M48 Patton
    also used by Armored Cavalry Squadrons in Vietnam until replaced by M551 Sheridan Armored Reconnaissance Airborne Assault Vehicles (ARAAV) in the Divisional...
    122 KB (14,060 words) - 02:10, 10 April 2025
  • Thumbnail for M60 tank
    as the Type B standard. The Type C turret was essentially a larger M551 Sheridan-style turret. A mock-up of this turret was built, but the design was...
    175 KB (21,376 words) - 16:33, 10 April 2025
  • Thumbnail for Tank destroyer
    deployment of the M56 Scorpion and M50 Ontos. The concept later led to the M551 Sheridan light tank of the mid-1960s. British tanks in the early years of the...
    39 KB (5,500 words) - 16:04, 27 March 2025
  • Thumbnail for M1 Abrams
    NBC-protected turret with the other two crewmembers. Like the M60A2 MBT and M551 Sheridan light tank then under development, the MBT-70 was armed with a 152 mm...
    223 KB (23,595 words) - 21:05, 12 April 2025
  • Thumbnail for Stridsvagn 103
    Materiel Administration's Ordnance Department put out a contract to find a replacement. Two working groups were formed to consider different approaches. "Alternative...
    36 KB (4,525 words) - 22:15, 25 February 2025
  • Thumbnail for MBT-80
    both countries had agreed on the specifications of the joint tank, the replacement timetables diverged to such a degree that collaboration was not practicable...
    26 KB (3,387 words) - 16:34, 26 February 2025
  • Thumbnail for K1 tank
    large-scale repair (renovation) in 2024. The main improvement point is the replacement of the new armored upgrading of the protection, installation of the positive...
    83 KB (8,946 words) - 17:57, 11 April 2025
  • Thumbnail for Leopard 1
    ending a selection and trial process against the US M60 series that started in 1971, when the army decided it needed a replacement for its British Centurions...
    120 KB (12,721 words) - 20:04, 11 April 2025
  • Thumbnail for T-80
    must be imported, increasing maintenance costs as the cost of ordering replacement parts kept rising steadily. Although the turbine engine is lighter with...
    69 KB (7,885 words) - 19:11, 7 April 2025
  • Thumbnail for M113 armoured personnel carriers in Australian service
    M113A1 FSV began in 1967, and continued for almost three years. Two M551 Sheridan light tanks were also trialled in Australia during early 1968 to determine...
    86 KB (10,226 words) - 23:51, 19 November 2024
  • Thumbnail for T-64
    rounds, against 1,250 for the T-64B. They were modernised in 1981 by the replacement of the gun by a 2A46M1, the stabiliser by a 2E42, and the mounting of...
    82 KB (10,148 words) - 00:45, 8 April 2025
  • Thumbnail for M3 Lee
    variant. The first 28 M4A1s built were British contract tanks as Grant replacements but the remainder of the order was subsumed into Lend-Lease. The prototype...
    56 KB (7,216 words) - 20:24, 23 March 2025
  • outfitted with the Ch'ŏnma. It is clear that the Ch'ŏnma is a general replacement for previously employed tanks, including the T-34, T-62 and Type 59 medium...
    21 KB (2,425 words) - 02:49, 29 March 2025
  • Thumbnail for Leopard 2
    batch of 125 followed from 1999 to 2002. The third stage was the planned replacement of the Leopard 2 turret by a new turret fitted with a 140 mm (5.5 in)...
    311 KB (28,989 words) - 12:50, 10 April 2025
  • Thumbnail for TR-85
    reactive armour, the add-on composite armour is designed this way for easy replacement after combat damage. The tank also has side skirts as a protection against...
    35 KB (4,067 words) - 21:05, 12 April 2025
  • Thumbnail for T-54/T-55 operators and variants
    basket, extensive external stowage, modernized driver's station including replacement of tillers by a steering wheel, new final drives, new all-internal fuel...
    194 KB (22,756 words) - 20:59, 6 March 2025
  • of the American Main Battle Tank." ISBN 0-89141-230-1. Hunnicutt, R. P. Sheridan: A History of the American Light Tank. Volume 2; 1995, Presidio Press....
    136 KB (18,608 words) - 15:27, 7 April 2025
  • Thumbnail for M4 Sherman
    aspect of the design process was the standardization of parts, allowing for streamlined production and the efficient supply of replacement components. Additionally...
    144 KB (18,142 words) - 21:20, 2 April 2025
  • Thumbnail for M3 Stuart
    short film The Tanks Are Coming features the M3 and its manufacturing process. The 1945 Mexican film comedy "Un día con el diablo" (A Day with the devil)...
    67 KB (7,474 words) - 17:08, 11 April 2025