The RABe 501, nicknamed Giruno, is a high-speed electric multiple unit train built by Stadler Rail of Switzerland for the Swiss Federal Railways (SBB)....
19 KB (1,490 words) - 20:29, 29 December 2024
cooling. This was a temporary measure until newer non-tilting trains SBB RABe 501 (Giruno) trains became available. All forty-four RABDe 500 trains are...
14 KB (1,225 words) - 18:52, 31 December 2024
New Pendolino (redirect from SBB-CFF-FFS RABe 503)
generation was launched in 2006 with ETR 600 for Trenitalia and ETR 610 / RABe 503 for Cisalpino, a railway company that operated trains between Switzerland...
24 KB (2,330 words) - 14:22, 6 September 2024
speeds on capacity.[citation needed] The fastest Swiss train is the SBB RABe 501, nicknamed Giruno (Romansh for Buzzard). It is operated by the Swiss...
8 KB (683 words) - 21:06, 1 November 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
7 KB (581 words) - 18:46, 18 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
136 KB (13,932 words) - 00:43, 4 January 2025
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
22 KB (1,810 words) - 09:22, 4 December 2024
using the Mannheim–Stuttgart and Karlsruhe–Basel high-speed lines. Swiss SBB high-speed services using the New Pendolino from Frankfurt to Milan on the...
11 KB (1,055 words) - 22:34, 15 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
78 KB (6,908 words) - 15:02, 21 December 2024
and seven ETR 610) and SBB (four ETR 470 and seven ETR 610). The low reliability of the timetable and of the ETR 470 has led SBB and Trenitalia to always...
48 KB (5,297 words) - 22:53, 20 October 2024
Rollmaterial [rolling stock]. BTS Bahn Technik – Seminar 2003 (in German). Bern: SBB. pp. 51–52. "L'aluminium monte dans le TGV". Les Echos (in French). 1 April...
17 KB (1,778 words) - 10:15, 18 November 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
22 KB (1,724 words) - 22:38, 19 December 2024
double-deck push-pull train in Switzerland and is run by Swiss Federal Railways (SBB-CFF-FFS) as part of its InterCity service. Top speed is 200 km/h. The train...
9 KB (861 words) - 14:27, 30 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
14 KB (1,202 words) - 16:44, 31 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
21 KB (2,074 words) - 12:32, 4 January 2025
in 1993. Fifty dual-voltage trainsets were built in 1992–1994, numbered 501-550. A further 40 triple-voltage trainsets, numbered 4501-4540, were built...
8 KB (728 words) - 17:50, 24 November 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
31 KB (2,777 words) - 21:55, 31 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
11 KB (774 words) - 11:55, 1 January 2025
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
18 KB (1,525 words) - 22:59, 4 November 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
20 KB (1,893 words) - 23:02, 24 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
15 KB (1,730 words) - 17:35, 8 June 2024
with parts falling onto the track. Four bogies out of 24 derailed. Out of 501 passengers, seven were bruised and others treated for shock. 14 November...
60 KB (6,437 words) - 10:52, 4 January 2025
the dissolution of Cisalpino they were split between SBB (4 sets) and Trenitalia (5 sets). SBB planned to retire its 4 sets in 2014 at the latest. Because...
13 KB (1,263 words) - 14:29, 19 September 2024
the trip. On a 12 November 2003 system commissioning test run, it achieved 501 kilometres per hour (311 mph), its designed top cruising speed. The Shanghai...
162 KB (16,011 words) - 03:51, 5 January 2025
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
9 KB (629 words) - 22:07, 20 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
25 KB (2,079 words) - 23:21, 16 November 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
7 KB (502 words) - 08:18, 4 October 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
232 KB (21,441 words) - 16:26, 2 January 2025
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
13 KB (1,030 words) - 15:31, 8 December 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
160 KB (14,842 words) - 16:52, 2 January 2025