• Thumbnail for Dagenham wind turbines
    The Dagenham wind turbines are two 85-metre (279 ft) high Enercon E-66 and one E-82 wind turbines located on the Dagenham estate of the Ford Motor Company...
    5 KB (397 words) - 23:37, 29 March 2023
  • Thumbnail for Dagenham
    It is the location of the Dagenham wind turbines. Some 4,000 people now work at the Ford plant. The movie Made in Dagenham (2010) is a dramatisation of...
    39 KB (4,339 words) - 19:57, 30 August 2024
  • Thumbnail for Ford Dagenham
    location of the Dagenham wind turbines since 2004.[citation needed] Ford announced in October 2012 that the stamping plant activities at Dagenham would cease...
    16 KB (1,893 words) - 17:17, 23 May 2023
  • Thumbnail for Wind power in the United Kingdom
    wind turbines with a total installed capacity of 30 gigawatts (GW): 16 GW onshore and 15 GW offshore, the sixth largest capacity of any country. Wind...
    114 KB (11,217 words) - 08:09, 30 August 2024
  • Thumbnail for Hornchurch Marshes
    regeneration that includes Beam Reach and part of Beam Park. Two of the Dagenham wind turbines are located there and the Centre for Engineering and Manufacturing...
    9 KB (1,046 words) - 08:18, 20 April 2024
  • Thumbnail for List of onshore wind farms in England
    some onshore wind farms (more than 1 turbine) in England. This information is gathered from multiple Internet sources, primarily the UK Wind Energy Database...
    46 KB (641 words) - 15:51, 6 December 2023
  • Thumbnail for EDF Energy
    EDF Energy (section Wind)
    operates 37 wind farms including the 59 turbine onshore wind farm at Dorenell in Scotland, and are developing two offshore wind projects at Codling Wind Park...
    25 KB (2,592 words) - 07:18, 26 June 2024
  • Thumbnail for Greenwich Power Station
    between 1969 and 1972. The steam turbines were replaced by Rolls-Royce gas turbine generators connected to Power Turbines from former Stal-Laval, Finspång...
    12 KB (1,268 words) - 08:58, 21 June 2024
  • Thumbnail for Clacton-on-Sea
    who installed a 50 ft (15 m) helter-skelter as a new focal point. A 48-turbine wind farm is located 4.3 miles (7 km) south-east of the Clacton coast. It...
    43 KB (4,887 words) - 19:16, 29 August 2024
  • Thumbnail for Barking Power Station
    Barking Power Station (category Former buildings and structures in the London Borough of Barking and Dagenham)
    power stations at various sites within the London Borough of Barking and Dagenham in east London. The original power station site, of the coal-fired A, B...
    18 KB (1,224 words) - 18:41, 9 May 2024
  • Thumbnail for Croydon power stations
    two gas turbines were each powered by four Bristol-Siddeley Olympus jet engines. These provided a high pressure gas blast which drove the turbines attached...
    36 KB (3,106 words) - 18:04, 26 August 2024
  • reciprocating machines and 1 × 3,000 kW, 2 × 4,000 kW and 2 × 10,000 kW steam turbines, a total generating capacity of 40 MW. The boilers had a maximum capacity...
    14 KB (1,297 words) - 23:11, 30 November 2023
  • Somerset Trecarrell Mill Trelubbas List of onshore wind farms in the United Kingdom List of offshore wind farms in the United Kingdom England portal Energy...
    99 KB (1,116 words) - 18:34, 29 August 2024
  • Thumbnail for Enfield Power Station
    the original on 16 May 2017. Retrieved 23 March 2017. "GT24 and GT26 Gas Turbines". Archived from the original on 28 April 2009. Retrieved 8 December 2019...
    4 KB (314 words) - 10:16, 9 March 2024
  • Thumbnail for V-2 rocket
    Wayback Machine, News Shopper, Orpington, Kent, 2 April 2010. "Barking and Dagenham Post". Jeremy Stocker, "Britain and Ballistic Missile Defence, 1942–2002"...
    98 KB (11,319 words) - 20:39, 31 July 2024
  • Thumbnail for Lots Road Power Station
    On 21 October 2002, Transport Minister John Spellar switched off the turbines, ending 97 years of electricity generation. Since 2002, all power for the...
    12 KB (1,239 words) - 19:10, 19 May 2024
  • Thumbnail for 5G
    A real time digital twin of the real object such as a turbine engine, aircraft, wind turbines, offshore platform and pipelines. 5G networks helps in...
    156 KB (14,325 words) - 15:06, 25 August 2024
  • Thumbnail for River Thames
    storm surges. Below the barrier, the river passes Woolwich, Thamesmead, Dagenham, Erith, Purfleet, Dartford, West Thurrock, Northfleet, Tilbury and Gravesend...
    135 KB (14,883 words) - 13:47, 22 August 2024
  • Thumbnail for Great British Railway Journeys
    Portillo travels to the port city of Kingston upon Hull and sees wind turbine blades being made at a site on the Alexandra Dock. He then makes the...
    201 KB (1,446 words) - 16:05, 25 August 2024
  • 408-flat skyscraper at Elephant and Castle in Southwark, that incorporates wind turbines into its structure, is completed. 30 July: The Barclays Cycle Hire scheme...
    73 KB (8,724 words) - 19:00, 26 August 2024
  • Thumbnail for Battersea Power Station
    essential to a thermal power station, is used to condense steam from the steam turbines before it is returned to the boiler. Water cycled through the power station's...
    72 KB (7,075 words) - 19:49, 16 August 2024
  • Kent Electric Company in 1919. The site was opposite the Ford plant at Dagenham. Construction was initially undertaken by the Construction Department of...
    9 KB (764 words) - 13:07, 19 August 2024
  • Thumbnail for London Climate Change Agency
    photovoltaic cells at City Hall, the UK's first combined photovoltaic and wind turbine system at the Palestra building, Blackfriars Road energy portal Energy...
    5 KB (408 words) - 09:19, 26 June 2022
  • Thumbnail for List of tallest buildings and structures in London
    shopping centre's redevelopment approved as 1,000 jobs promised". Barking and Dagenham Post. Archived from the original on 22 January 2017. Retrieved 18 January...
    226 KB (11,945 words) - 16:55, 26 August 2024
  • Thumbnail for Bulls Bridge Power Station
    operation of the gas turbines and the rest of the plant was closely monitored. Key operating parameters of the station's gas turbine engines were as follows...
    5 KB (446 words) - 12:57, 22 July 2024
  • years later. The station was further upgraded in 1912 when the original turbines were replaced. Along with Lots Road Power Station and Greenwich power station...
    3 KB (258 words) - 01:59, 17 September 2022
  • Thumbnail for Taylors Lane Power Station
    (Taylors Lane) comprised 3 × 1,500 kW, 1 × 3,000 kW and 2 × 6,000 kW steam turbines providing a 3-phase AC supply. In addition there was a single 750 kW reciprocating...
    9 KB (759 words) - 06:31, 13 July 2024
  • Thumbnail for Bankside Power Station
    the building was divided into three sections—the 85 ft (26 m) high main turbine hall in the centre, with the boiler house to the north and the electricity...
    28 KB (3,307 words) - 04:56, 23 July 2024
  • Thumbnail for SELCHP
    electricity. The plant can generate up to 35 MegaWatts of power using a steam turbine in electricity only mode. It can incinerate up to 420,000 tonnes per year...
    6 KB (574 words) - 18:34, 9 May 2024
  • Thumbnail for Deptford Power Station
    by G. W. Partridge as chief engineer. The plant was rebuilt with steam turbines and other improvements, and electricity supply eventually became reliable...
    18 KB (1,471 words) - 06:27, 13 July 2024