The Willowbrook Rail Maintenance Facility is a GO Transit rolling stock maintenance facility located in the Willowbrook Yard in Toronto, Canada. The facility...
8 KB (691 words) - 03:31, 11 August 2024
in Texas Willowbrook (bus manufacturer), a former vehicle body builder in England Willowbrook Rail Maintenance Facility, a GO Transit rail yard and rolling...
1,023 bytes (142 words) - 03:23, 9 January 2023
the Willowbrook Rail Maintenance Facility along GO Transit's Lakeshore West line. Plenary Infrastructure, a consortium, is responsible for maintenance and...
8 KB (640 words) - 22:20, 16 October 2024
Transit’s 979 Bilevel passenger cars. The Willowbrook Rail Maintenance Facility is GO's original rail maintenance facility, covering 18,600 m2 (200,000 sq ft)...
49 KB (4,470 words) - 18:38, 13 November 2024
Canadian National Mimico Yard directly opposite of the Willowbrook Rail Maintenance Facility on the north side; GO Transit's Lakeshore West line separates...
6 KB (580 words) - 04:34, 28 September 2024
GO Transit (redirect from Toronto Commuter Rail)
Willowbrook Rail Maintenance Facility, located west of Mimico station in Toronto and at the newer Whitby Rail Maintenance Facility. The Willowbrook facility...
71 KB (7,038 words) - 20:23, 19 November 2024
another two tracks on the south side, which access the Willowbrook Rail Maintenance Facility. This station and Long Branch are the only two stations...
7 KB (736 words) - 01:53, 29 July 2024
1980s) Willowbrook Rail Maintenance Facility (GO Transit facility, ex-CN Mimico Yard, current Willowbrook Yard) Whitby Rail Maintenance Facility (GO Transit...
71 KB (6,900 words) - 11:39, 22 November 2024
just west of GO's Willowbrook Rail Maintenance Facility. July 30: Metrolinx announced its plan to build, own and operate the air rail link between Union...
70 KB (5,234 words) - 17:43, 6 November 2024
Lakeshore West line (redirect from Lakeshore West (GO Transit rail line))
Station and 30th Street in Etobicoke (just west of GO's Willowbrook Rail Maintenance Facility). On March 27, 2012, GO purchased a second segment immediately...
33 KB (2,233 words) - 22:40, 23 October 2024
Angeles Metro Rail is an urban rail transit system serving Los Angeles County, California, United States, consisting of six lines: four light rail lines (the...
87 KB (5,163 words) - 11:05, 21 November 2024
residents could force the Willowbrook Rail Maintenance Facility to close. As of 2023, those concerns have not materialized, and the facility remains open. Maloney...
11 KB (1,132 words) - 18:20, 23 September 2024
A Line (Los Angeles Metro) (category Light rail in California)
connect with the C Line at the Willowbrook/Rosa Parks station. Just south of Willow Street station, A Line trains exit the rail corridor and begin street running...
53 KB (4,868 words) - 06:47, 20 November 2024
C Line (Los Angeles Metro) (redirect from Metro rail green line)
(I-605). A non-revenue connector at Willowbrook/Rosa Parks station allows trains to transfer to A Line tracks for maintenance and other non-revenue operations...
44 KB (3,252 words) - 01:22, 22 November 2024
History of GO Transit (category Rail transport articles in need of updating)
GO's need to move "deadheaded" trains back to its main Willowbrook Rail Maintenance Facility in the evening and then out to the termini in the early...
22 KB (2,924 words) - 20:40, 29 August 2024
a maintenance facility (Division 14) for Expo light rail vehicles on a site that was a parking lot owned by Santa Monica College. That new facility offers...
141 KB (14,658 words) - 21:25, 24 October 2024
K Line (Los Angeles Metro) (category Airport rail links in the United States)
The K Line is a light rail line in Los Angeles County. It currently consists of two separate noncontiguous segments. The 5.9-mile (9.5 km) northern segment...
46 KB (3,915 words) - 21:13, 9 November 2024
would be a facility for transloading freight from trains to trucks. It would be built on a 120-acre (49 ha) tract owned by the state and use a rail siding...
16 KB (1,834 words) - 03:19, 4 November 2024
Expo Line (SkyTrain) (redirect from Willowbrook station (SkyTrain))
to Fraser Highway and southeast to 168 Street; a further extension to Willowbrook Shopping Centre in Langley Township was also included in the plan. In...
38 KB (3,533 words) - 05:37, 26 October 2024
Canada Line (redirect from Richmond-Airport-Vancouver light rail)
stations. Just before Bridgeport station is the Operations and Maintenance Centre (OMC) facility, which houses Canada Line trains that are not in use. Station...
84 KB (9,455 words) - 17:13, 11 November 2024
SkyTrain (Vancouver) (category Rail transport articles in need of updating)
extension to Willowbrook Shopping Centre in Langley City was also included in the plan. After a period of time where SkyTrain, light rail transit, and...
110 KB (10,623 words) - 06:34, 4 November 2024
service between Oakville and Pickering. GO named its facility Willowbrook, after the nearby Willowbrook Road. Old CNR facilities in Mimico Yard were used...
32 KB (3,572 words) - 16:25, 20 March 2024
High Line (category Rail trails in New York (state))
High Line is a 1.45-mile-long (2.33 km) elevated linear park, greenway, and rail trail created on a former New York Central Railroad spur on the west side...
124 KB (10,958 words) - 18:28, 16 October 2024
Montclair-Boonton Line (category NJ Transit Rail Operations)
The Montclair-Boonton Line is a commuter rail line of New Jersey Transit Rail Operations in the United States. It is part of the Hoboken Division. The...
91 KB (9,188 words) - 23:11, 18 November 2024
village of Matteawan for $25,000. The site was rural, yet accessible by rail and offered good tillable land, pure water and pleasant scenery between the...
11 KB (980 words) - 14:04, 24 January 2024
Kings Park Psychiatric Center (category Articles with multiple maintenance issues)
It operated from 1885 until 1996, when the State of New York closed the facility, releasing its few remaining patients or transferring them to the still-operational...
19 KB (2,458 words) - 20:27, 27 May 2024
are quite suburban and feature large numbers of big-box stores, the Willowbrook Shopping Centre, and the Famous Players Colossus Theatre Complex. Fort...
62 KB (4,609 words) - 13:21, 1 November 2024
as the King George Hub development, which displaced the park and ride facility that had once served the station. King George station was opened in 1994...
12 KB (711 words) - 23:45, 21 August 2024
Two-car trains only operate during train maintenance and testing at the BCRTC Edmonds Maintenance and Storage Facility in Burnaby. In 2013, the oldest 114...
44 KB (3,864 words) - 00:02, 5 September 2024
station with service to Santa Monica and East Los Angeles. In addition, at Willowbrook Station, passengers can transfer to the Metro C Line with service to...
174 KB (16,508 words) - 13:43, 19 November 2024