• Thumbnail for LVM3
    The Launch Vehicle Mark-3 or LVM3 (previously referred as the Geosynchronous Satellite Launch Vehicle Mark III or GSLV Mk III) is a three-stage medium-lift...
    86 KB (6,282 words) - 06:59, 23 August 2024
  • and LVM3. This family of three launchers was previously being designed for replacing the different core propulsion modules of PSLV, GSLV, and LVM3 respectively...
    15 KB (1,456 words) - 05:06, 16 August 2024
  • Thumbnail for Vikas (rocket engine)
    and also the core stage of LVM3. The propellant loading for Vikas engine in PSLV, GSLV Mark I and II is 40 tons, while in LVM3 is 55 tons. In 1974, Societe...
    9 KB (599 words) - 06:15, 7 May 2024
  • Thumbnail for Indian Human Spaceflight Programme
    plans to launch its crewed orbiter Gaganyaan atop a Launch Vehicle Mark 3 (LVM3). About 16 minutes after lift-off, the rocket will inject the orbital vehicle...
    62 KB (5,831 words) - 07:18, 14 August 2024
  • Thumbnail for Gaganyaan
    descending from a height of 635 km. A module prototype was launched onboard LVM3 in 2014. At 126 kilometers above the ground, it broke apart, descending 80...
    110 KB (10,341 words) - 21:02, 20 August 2024
  • Thumbnail for Bharatiya Antariksha Station
    December 2023, the first module is expected to be launched in 2028 on an LVM3 launch vehicle, with the remaining modules to be launched by 2035 on the...
    22 KB (1,926 words) - 07:02, 23 August 2024
  • Thumbnail for Satish Dhawan Space Centre
    Polar Satellite Launch Vehicle, Geosynchronous Satellite Launch Vehicle, LVM3 and is intended for India's first crewed space mission. The first launch...
    42 KB (4,113 words) - 04:32, 16 August 2024
  • on 28 October 2014. The proposed launch vehicle for this campaign is the LVM3, which flew for the first time on 5 June 2017, and might be powerful enough...
    18 KB (1,454 words) - 14:04, 22 August 2024
  • Thumbnail for CE-20
    Organisation (ISRO). It has been developed to power the upper stage of the LVM3. It is the first Indian cryogenic engine to feature a gas-generator cycle...
    27 KB (2,322 words) - 19:54, 26 March 2024
  • Gaganyaan project. The first crewed flight is planned for 2024 on a home-grown LVM3 rocket. Before Gaganyaan mission announcement in August 2018, human spaceflight...
    29 KB (2,697 words) - 11:41, 8 August 2024
  • Thumbnail for Gaganyaan-4
    2023, it is expected to be launched by 2025. The Launch Vehicle Mark-3 or LVM3 (previously referred as the Geosynchronous Satellite Launch Vehicle Mark...
    8 KB (1,512 words) - 06:02, 21 August 2024
  • Thumbnail for Chandrayaan-3
    July 2019, ISRO launched Chandrayaan-2 on board a Launch Vehicle Mark-3 (LVM3) launch vehicle consisting of an orbiter, a lander and a rover. The lander...
    90 KB (7,266 words) - 08:25, 23 August 2024
  • Thumbnail for ISRO
    sixth country to have full launch capabilities. A new heavier-lift launcher LVM3 was introduced in 2014 for heavier satellites and future human space missions...
    237 KB (18,203 words) - 04:36, 23 August 2024
  • Thumbnail for SCE-200
    developed to power Indian Space Research Organisation's (ISRO) existing LVM3 and upcoming heavy and super heavy-lift launch vehicles. It is being developed...
    20 KB (1,656 words) - 12:43, 18 August 2024
  • Thumbnail for Eutelsat OneWeb
    resumed in quarter four of 2022 using the SpaceX Falcon 9 and the Indian LVM3 rockets. The satellites in the OneWeb constellation are approximately 150 kg...
    83 KB (7,345 words) - 11:39, 8 July 2024
  • Thumbnail for Cryogenic rocket engine
    are numerous. Boosters include ESA's Ariane 5, JAXA's H-II, ISRO's GSLV, LVM3, United States Delta IV and Space Launch System. The United States, Russia...
    12 KB (644 words) - 16:47, 19 August 2024
  • Thumbnail for Gas-generator cycle
    flown. CE-20—Indian LH2/LOX engine developed in the 2010s for use on the LVM3 launch vehicle. YF-20—Chinese N2O4/UDMH engine developed in the 1990s and...
    5 KB (485 words) - 03:51, 10 July 2024
  • Thumbnail for Chandrayaan-4
    sample delivery. The mission will be launched in two phases onboard two LVM3 rockets. The spacecraft will have five modules packed into two composites...
    12 KB (1,140 words) - 07:47, 23 August 2024
  • Thumbnail for Chandrayaan programme
    Mk-II with Chandrayaan-2 payload, hence a more capable and already flown LVM3 vehicle was chosen. During a landing test in February 2019, the lander suffered...
    97 KB (9,027 words) - 08:26, 23 August 2024
  • Thumbnail for GSAT-19
    communications satellite launched by the Indian Space Research Organisation aboard an LVM3 on 5 June 2017. The satellite will act as a testbed for the modular I-6K...
    10 KB (508 words) - 21:25, 3 July 2024
  • to land on moon South Pole of India.Chandrayaan-3 was launched aboard an LVM3-M4 rocket on 14 July 2023, at 09:05 UTC from Satish Dhawan Space Centre Second...
    7 KB (924 words) - 13:22, 7 July 2024
  • Thumbnail for Vikram Sarabhai Space Centre
    rockets, the Rohini and Menaka launchers, and SLV, ASLV, PSLV, GSLV and LVM3 families of launch vehicles. The space centre is the largest among the ISRO...
    15 KB (1,575 words) - 05:24, 9 August 2024
  • Thumbnail for Andhra Pradesh
    LVM3 M4, Chandrayaan-3 – Launch vehicle lifting off from the second launch pad of SDSC-SHAR, Sriharikota...
    199 KB (17,546 words) - 05:14, 23 August 2024
  • Interplanetary Missions and Reusability". Rocket Lab. Retrieved October 26, 2020. "LVM3". Archived from the original on September 10, 2015. Retrieved December 21...
    78 KB (1,944 words) - 22:41, 17 August 2024
  • Thumbnail for List of Falcon 9 and Falcon Heavy launches
    telecommunications satellite for Dish TV. Originally planned to launch on ISRO's LVM3, but later shifted to Falcon 9 due to mass and scheduling issues. It will...
    438 KB (19,217 words) - 05:49, 23 August 2024
  • ISRO's launch vehicles. Left to right: SLV, ASLV, PSLV, GSLV, LVM3...
    33 KB (2,322 words) - 06:58, 17 August 2024
  • 67 hp) for payload Start of mission Launch date NET 2028 (planned) Rocket LVM3 Launch site SDSC SHAR Contractor ISRO Venus orbiter Venus atmospheric probe...
    25 KB (2,088 words) - 20:22, 14 June 2024
  • Understanding, Ariane 6 of Arianespace and the heavy lift launch vehicle LVM3 of ISRO will answer the demand for launching larger communication or earth...
    11 KB (756 words) - 04:14, 28 June 2024
  • Sreedhara Panicker; N. Narayanamoorthy; S. Ramakrishnan (2010). "GSLV Mk-III (LVM3) Development Challenges and Present Status" (PDF). International Astronautical...
    3 KB (183 words) - 18:32, 23 April 2024
  • Thumbnail for Chandrayaan-2
    Dhawan Space Centre in Andhra Pradesh on 22 July 2019 at 09:13:12 UTC by a LVM3-M1 rocket. The craft reached lunar orbit on 20 August 2019. The Vikram lander...
    148 KB (11,921 words) - 15:56, 24 July 2024