• Thumbnail for Hegyeshalom
    Hegyeshalom (Hungarian: [ˈhɛɟɛʃhɒlom]; German: Straß-Sommerein) is a village of roughly 3750 inhabitants in Győr-Moson-Sopron County, Hungary, on the...
    7 KB (578 words) - 05:02, 23 July 2024
  • Thumbnail for Hegyeshalom railway station
    Hegyeshalom (Hungarian: Hegyeshalom vasútállomás) is a railway station in Hegyeshalom, Győr-Moson-Sopron County, Hungary. Opened on 24 December 1855,...
    4 KB (198 words) - 05:47, 5 July 2023
  • Thumbnail for Budapest–Hegyeshalom railway line
    The Budapest–Hegyeshalom railway line is a major east–west railway line in Hungary. It runs 185.1 kilometres (115.0 mi) from Budapest Keleti station,...
    5 KB (255 words) - 14:19, 7 May 2024
  • Thumbnail for M1 motorway (Hungary)
    of the motorway opened in the 1970s, reaching the Austrian border at Hegyeshalom in 1996. It follows the route of the old Route 1 one-lane highway. Budapest...
    16 KB (376 words) - 20:19, 28 May 2024
  • Thumbnail for Győr–Moson–Sopron County
    important cultural centre on its own right. The county also contains Hegyeshalom, Hungary's busiest international land border crossing point. In 1990...
    20 KB (793 words) - 21:05, 6 July 2024
  • Thumbnail for Eastern Railway (Austria)
    border. The line is electrified at 15 kV  16.7 Hz AC between Vienna and Hegyeshalom. As of the December 2022 timetable change,[update] the S60 of the Vienna...
    4 KB (294 words) - 07:01, 11 May 2024
  • Thumbnail for Raaberbahn
    between Hegyeshalom - Rajka - Rusovce (Oroszvár)- Bratislava (Pozsony). The company maintains the following railway lines: Line 1 Hegyeshalom–Rajka Line...
    9 KB (1,118 words) - 07:30, 21 November 2023
  • Thumbnail for Wien Hauptbahnhof
    Centrale Terminus Terminus Břeclav towards Gdynia Główna Hegyeshalom towards Budapest Keleti Hegyeshalom towards Cluj Napoca InterCity Bratislava-Petrzalka...
    25 KB (2,052 words) - 13:34, 2 July 2024
  • Thumbnail for Austrian Federal Railways
    Republic Eastern Railway from Vienna Hauptbahnhof (under construction) to Hegyeshalom, Hungary and Budapest Keleti railway station Emperor Franz Joseph Railway...
    22 KB (1,963 words) - 11:59, 25 July 2024
  • Thumbnail for Budapest Keleti station
    "Budapest-Keleti" (in Hungarian). MÁV Group. Retrieved 28 June 2023. "1 Budapest — Hegyeshalom — Rajka" (PDF) (in Hungarian). MÁV Group. 1 July 2023. Retrieved 28 June...
    11 KB (644 words) - 12:05, 16 July 2024
  • Thumbnail for Kelenföld
    (southwestern side) – Fehérvári út – Hegyeshalom railway line – Danube – Kondorosi út – Solt utca – Kelenvölgyi határsor – Hegyeshalom railway line – underground...
    3 KB (278 words) - 04:14, 15 January 2024
  • Thumbnail for 25 kV AC railway electrification
    Budapest–Dunakeszi–Alag. The first fully electrified line was Budapest–Győr–Hegyeshalom (part of the Budapest–Vienna line). Although Kandó's solution showed...
    23 KB (2,651 words) - 20:41, 10 June 2024
  • Thumbnail for Burgenland
    consequences. At the same time, the border crossing at Nickelsdorf (Austria) / Hegyeshalom (Hungary) was opened by the Hungarian border patrol and this enabled...
    38 KB (4,378 words) - 13:10, 17 July 2024
  • Neustadt railway Sopron - Baumgarten Fertőszentmiklós - Pamhagen (1897) Hegyeshalom - Nickelsdorf (1855) Polish rail border crossings Czech rail border crossings...
    6 KB (625 words) - 13:44, 26 July 2024
  • Thumbnail for Bratislava-Petržalka railway station
    (ŽSR) Operated by Železnice Slovenskej republiky Line(s) Parndorf–Bratislava Bratislava–Hegyeshalom [de] History Opened 1897 (1897) Rebuilt 1998 (1998)...
    3 KB (178 words) - 12:41, 4 November 2023
  • Thumbnail for MÁV Class 411
    Budapest, operational 411,264 - Hatvan RR. station, plinthed 411,358 - Hegyeshalom station, plinthed The 411,144 was originally intended to be preserved...
    7 KB (630 words) - 05:21, 7 May 2024
  • Thumbnail for Parndorf–Bratislava railway line
    Leitha before entering Slovakia. It runs parallel to the Bratislava–Hegyeshalom railway line [de] before terminating at Bratislava-Petržalka. The line...
    5 KB (259 words) - 06:48, 11 May 2024
  • Thumbnail for Highways in Hungary
    of the motorway began 1964, it took more than thirty years to reach Hegyeshalom and the Austrian border. Its significance has increased since the change...
    59 KB (3,758 words) - 20:05, 28 May 2024
  • Thumbnail for Győr railway station
    located on the main line between Vienna and Budapest (Line 1 Budapest–Hegyeshalom railway) and Line 8 Győr–Sopron railway, Line 10 Győr–Celldömölk railway...
    5 KB (291 words) - 05:46, 5 July 2023
  • Thumbnail for Herceghalom rail crash
    1916 at 00:24 in the station of Herceghalom, Hungary, on the Budapest–Hegyeshalom line as a side collision of an express train running into a shunting...
    5 KB (354 words) - 21:58, 2 March 2023
  • Thumbnail for High-speed rail in Europe
    allowed speed limit in the country remains at 160 km/h on the Budapest–Hegyeshalom (Austrian border) line. Furthermore, in January 2022, the Hungarian Government...
    189 KB (15,878 words) - 12:48, 20 July 2024
  • Thumbnail for Electric locomotive
    Komárom. This proved successful and the electrification was extended to Hegyeshalom in 1934. In Europe, electrification projects initially focused on mountainous...
    59 KB (7,046 words) - 19:15, 25 July 2024
  • Thumbnail for Ost Autobahn
    Mönchhof to the border town of Nickelsdorf. Crossing the border into Hegyeshalom, the road becomes the Hungarian M1 motorway which then continues on to...
    4 KB (243 words) - 04:20, 6 October 2022
  • Thumbnail for Order of Vitéz
    Jews at the Obuda brick factory and sent them on a death march towards Hegyeshalom near the Western border to build a line of defense, and indicated in...
    23 KB (2,448 words) - 01:36, 23 July 2024
  • as reprisal for the death of two Hungarian soldiers in an explosion. Hegyeshalom death march Crimes against humanity; crime of genocide After the war...
    127 KB (8,917 words) - 12:25, 23 July 2024
  • Class 450 locomotive 450002 in Hegyeshalom in November 2010...
    4 KB (345 words) - 07:21, 14 July 2024
  • Thumbnail for Mosonmagyaróvár railway station
    located on the main line between Vienna and Budapest (Line 1 Budapest–Hegyeshalom railway). Train services are operated by MÁV START. As of the June 2023...
    3 KB (158 words) - 05:54, 5 July 2023
  • Thumbnail for European Train Control System
    line was equipped with Level 1 as a pilot project in 2006. The Budapest–Hegyeshalom Level 1 was launched in 2008, and it was extended to Rajka (GYSEV) in...
    149 KB (16,456 words) - 04:26, 19 June 2024
  • Thumbnail for List of railway lines in Hungary
    This is a list of railway lines in Hungary. 1 Budapest–Hegyeshalom (185 km) 1 Bratislava–Hegyeshalom [de] (33 km) - operated by GySEV 2 Budapest–Esztergom...
    13 KB (999 words) - 00:01, 31 October 2023
  • Thumbnail for Kelenföld railway station
    46444; 19.02028 Owned by Hungarian State Railways (MÁV) Line(s) Budapest–Hegyeshalom Budapest–Székesfehérvár [hu] Budapest–Pusztaszabolcs [hu] Platforms 16...
    8 KB (405 words) - 19:15, 6 March 2024