The Budapest–Hegyeshalom railway line is a major east–west railway line in Hungary. It runs 185.1 kilometres (115.0 mi) from Budapest Keleti station,...
5 KB (255 words) - 14:19, 7 May 2024
main line between Vienna and Budapest (Line 1 Budapest–Hegyeshalom railway and the Ostbahn) and also Line 16 Hegyeshalom–Szombathely railway and Line 132...
4 KB (198 words) - 05:47, 5 July 2023
2016-11-09. Retrieved 2014-12-02. "Budapest-Keleti" (in Hungarian). MÁV Group. Retrieved 28 June 2023. "1 Budapest — Hegyeshalom — Rajka" (PDF) (in Hungarian)...
11 KB (644 words) - 10:03, 12 February 2024
death march of thousands of Hungarian Jews from Budapest to Hegyeshalom in order to construct a defensive line in Reichsgau Niederdonau. In addition to many...
7 KB (570 words) - 17:01, 9 May 2024
for the run to the Hungarian border. The line is electrified at 15 kV 16.7 Hz AC between Vienna and Hegyeshalom. As of the December 2022 timetable change...
4 KB (294 words) - 07:01, 11 May 2024
main line between Vienna and Budapest (Line 1 Budapest–Hegyeshalom railway), Line 12 Tatabánya–Oroszlány railway and Line 13 Tatabánya–Pápa railway. The...
3 KB (160 words) - 04:42, 24 June 2023
Kelenföld railway station (Hungarian: Kelenföldi vasútállomás or incorrectly Kelenföldi pályaudvar, and until 2007 officially Budapest-Kelenföld) is among...
8 KB (405 words) - 19:15, 6 March 2024
Budapest–Hegyeshalom railway line west of the Tatabánya railway station. In Környe, 7.6 kilometres (4.7 mi) from Tatabánya, the Környe–Oroszlány railway line veers...
4 KB (215 words) - 14:19, 7 May 2024
electrified line for testing was Budapest–Dunakeszi–Alag. The first fully electrified line was Budapest–Győr–Hegyeshalom (part of the Budapest–Vienna line). Although...
23 KB (2,651 words) - 20:41, 10 June 2024
ÖBB (redirect from Austrian Federal Railway)
Praterstern railway station to Břeclav, Czech Republic Eastern Railway from Vienna Hauptbahnhof (under construction) to Hegyeshalom, Hungary and Budapest Keleti...
22 KB (1,957 words) - 17:26, 8 June 2024
main line between Vienna and Budapest (Line 1 Budapest–Hegyeshalom railway) and Line 8 Győr–Sopron railway, Line 10 Győr–Celldömölk railway and Line 11...
5 KB (291 words) - 05:46, 5 July 2023
December 1855. It is located on the main line between Vienna and Budapest (Line 1 Budapest–Hegyeshalom railway). Train services are operated by MÁV START...
3 KB (158 words) - 05:54, 5 July 2023
February 2016. "Budapest és környékének vasúti hálózata" (PDF) (in Hungarian). 2023. Retrieved 30 June 2023. "1 Budapest — Hegyeshalom — Rajka" (PDF) (in...
11 KB (419 words) - 04:14, 16 July 2023
railway line runs north–south between Győr and Celldömölk. The northern end of the terminates in a connection with the Budapest–Hegyeshalom railway line...
5 KB (210 words) - 00:23, 25 October 2023
Raaberbahn (category Railway companies of Hungary)
between Hegyeshalom - Rajka - Rusovce (Oroszvár)- Bratislava (Pozsony). The company maintains the following railway lines: Line 1 Hegyeshalom–Rajka Line 8...
9 KB (1,118 words) - 07:30, 21 November 2023
mid-4th century between CFR Line 912 and BDZ Line 7 Replacing 1891 Franz Joseph Bridge (most Františka Jozefa - originally a railway bridge), demolished and...
14 KB (567 words) - 10:17, 11 June 2024
railway station (Metro Line M4): 773 and 774 Local Bus (to Biatorbágy railway station): KanyarGO The railway 1 (Budapest–Hegyeshalom–Rajka) also crosses...
7 KB (565 words) - 08:09, 21 June 2024
Kelenföld (category Neighbourhoods of Budapest)
side) – Fehérvári út – Hegyeshalom railway line – Danube – Kondorosi út – Solt utca – Kelenvölgyi határsor – Hegyeshalom railway line – underground passage...
3 KB (278 words) - 04:14, 15 January 2024
station and a connecting 100 kV power line of 150–200 km were built and the Budapest-Hegyeshalom railway line was electrified. This raised the interest...
7 KB (836 words) - 19:54, 27 August 2022
European Train Control System (redirect from Line Inside Unit)
in 2006. The Budapest–Hegyeshalom Level 1 was launched in 2008, and it was extended to Rajka (GYSEV) in 2015. The Békéscsaba-Lőkösháza line was equipped...
149 KB (16,456 words) - 04:26, 19 June 2024
Wien Hauptbahnhof (redirect from Wien Hauptbahnhof railway station)
Graz - Maribor - Zagreb - Split InterRegio Night (Romanian Railways) Vienna - Győr - Budapest - Lokoshaza - Arad - Sighişoara - Braşov - Bucharest Regiojet...
25 KB (2,052 words) - 10:19, 17 June 2024
speed limit in the country remains at 160 km/h on the Budapest–Hegyeshalom (Austrian border) line. Furthermore, in January 2022, the Hungarian Government...
188 KB (15,879 words) - 22:11, 20 June 2024
to 1935, the route from Budapest to Hegyeshalom was electrified at 16 kV, 50 Hz. The first electric locomotives on the line were of the MÁV V40 class...
4 KB (403 words) - 07:23, 2 August 2023
the 190 km long Budapest-Hegyeshalom main line with a new "Kandó system". The system was fed from a three-phase 110 kV transmission line from the Bánhida...
26 KB (3,187 words) - 17:55, 9 April 2024
the Hungarian State Railways between Budapest and Komárom. This proved successful and the electrification was extended to Hegyeshalom in 1934. In Europe...
59 KB (7,046 words) - 02:58, 9 June 2024
International Railway Journal. Michał Szymajda (17 January 2020). "Szybka linia kolejowa "Y" przez CPK ma być gotowa do 2030 roku" [High-speed 'Y' railway line through...
104 KB (1,373 words) - 05:55, 24 June 2024
Slovakia join. M15 motorway (E65/E75), Highway 150, and the Budapest–Hegyeshalom–Rajka railway line all cross the village. The Hungarian-Slovak border crossing...
7 KB (451 words) - 14:28, 10 February 2023
Rail transport in Romania (redirect from Railways in Romania)
Curtici. Multiple daily passenger frequencies to Budapest and beyond (only to Győr, Mosonmagyaróvár, Hegyeshalom, and Vienna for the moment)[citation needed]...
14 KB (1,554 words) - 11:41, 15 June 2024
Lehár (train) (category Railway services introduced in 1979)
Budapest Déli to Budapest Keleti. By 2004, an upgrade of the Hegyeshalom to Budapest line had reduced the train's whole trip to less than three hours each...
8 KB (723 words) - 05:49, 18 November 2022
near Budapest and 56,421 vehicles/day near Győr. The construction of the motorway began 1964, it took more than thirty years to reach Hegyeshalom and the...
59 KB (3,758 words) - 20:05, 28 May 2024