Doppelmayr/Garaventa Group is an international manufacturer of ropeways and people movers for ski areas, urban transport, amusement parks, and material...
13 KB (1,046 words) - 19:29, 12 April 2024
Doppelmayr USA, Inc is an aerial lift manufacturer based in Salt Lake City, Utah, and a subsidiary of the worldwide Doppelmayr Garaventa Group. The United...
12 KB (1,189 words) - 19:16, 25 February 2024
Doppelmayr or Doppelmayer may refer to: Doppelmayr Garaventa Group Doppelmayr USA, a subsidiary of the above Johann Gabriel Doppelmayr (1677–1750), German...
391 bytes (68 words) - 20:32, 14 March 2023
Detachable chairlift (section Doppelmayr)
heated seats when five Doppelmayr detachable chairlifts offer skiers the added luxury of a warm seat on the uphill trip. Doppelmayr (North America) built...
18 KB (2,500 words) - 14:57, 27 July 2024
Johann Gabriel Doppelmayr (27 September 1677 – 1 December 1750) was a German mathematician, astronomer, and cartographer. (His surname is also spelled...
5 KB (534 words) - 22:28, 27 June 2024
Doppelmayr in 2001 Liftbyggarna – Sweden, founded in 1952, acquired by Doppelmayr Garaventa Group in 2013 Carvatech – Austria, acquired by Doppelmayr...
28 KB (2,348 words) - 11:11, 6 February 2024
(APM): Planner's Guide. DCC Doppelmayr Cable Car GmbH. p. 83. DCC Doppelmayr Cable Car (2008). References. DCC Doppelmayr Cable Car GmbH. p. 3. Richard...
7 KB (704 words) - 04:14, 6 July 2023
high-speed detachable chairs and 5 fixed-grip lifts made by Lift Engineering, Doppelmayr and Poma. Two T-bars service the Horstman Glacier and the Whistler alpine...
78 KB (8,940 words) - 05:32, 6 August 2024
manufacturer, Hölzl, which later merged with Doppelmayr Italia. Today, the design is therefore patented by Doppelmayr Garaventa Group. At the top of each track...
16 KB (1,183 words) - 21:44, 21 July 2024
plan, Doppelmayr built North America's first ever high speed eight pack in the form of the Ramcharger 8, which replaced an existing Doppelmayr high speed...
19 KB (1,637 words) - 23:57, 12 August 2024
gondola was built by the Doppelmayr Garaventa Group in 2007 and 2008 at a cost of CDN$51 million. The Gondola is the first Doppelmayr "3S" tri-cable lift in...
21 KB (2,691 words) - 17:51, 29 May 2024
in 2021, Ba Na Hills added their sixth cable car to the park, made by Doppelmayr and managed by Sun World, Sun Group. Zohar, Erica Wertheim. "Ba Na Hills...
3 KB (313 words) - 07:21, 25 July 2024
led by the Austrian company Doppelmayr Cable Car. It was the fifth Cable Liner shuttle system installed by the Doppelmayr Garaventa Group. The whole 870-metre-long...
8 KB (618 words) - 14:07, 9 September 2023
1980–81 ski season. The resort had six chairlifts, all constructed by Doppelmayr: three triple and three double chairlifts. In 1983, Larkspur Bowl was...
14 KB (1,299 words) - 21:52, 29 July 2024
gondola in Vail Village was replaced with a double chairlift. In 1985, Doppelmayr constructed four high-speed quads on the Front Side, making Vail the second...
44 KB (4,368 words) - 08:38, 24 April 2024
by the Austrian company, Doppelmayr, in 1996, Doppelmayr obtained the knowledge for 3S gondola lift construction. Doppelmayr constructed their first system...
7 KB (782 words) - 20:36, 17 July 2024
15-Person Tram Allen Peak Tram (Doppelmayr, 1998) 2 Gondolas Strawberry Express (Doppelmayr, 1998) Needles Express (Doppelmayr, 1998) 3 high speed six packs...
16 KB (1,519 words) - 14:39, 25 July 2024
2014–15 season. In 2015, the merger of PCMR with Canyons was undertaken by Doppelmayr USA as part of a project that built two new lifts and relocated a third...
24 KB (2,027 words) - 14:39, 25 July 2024
Cable Liner (category Doppelmayr/Garaventa Group)
Cable Liner is a range of automated people mover products designed by Doppelmayr Cable Car for use at airports, in city centers, intermodal passenger transport...
12 KB (1,192 words) - 05:52, 12 May 2024
Montmorency Falls Park, Canada, by the French and Canadian subsidiaries of Doppelmayr. In 2002, Poma installed a reversible funitel in Val Thorens, France....
9 KB (955 words) - 04:00, 1 October 2023
gondola terminals. In 1990, Keystone entered the detachable industry as Doppelmayr constructed two high speed quads to replace aging lifts on Dercum Mountain...
17 KB (1,828 words) - 09:13, 8 August 2024
Speed Quad Doppelmayr 2013 Gadzoom 6,457 ft 1,823 ft High Speed Quad Garaventa CTEC 1997 Little Cloud 3,204 ft 1,302 ft High Speed Quad Doppelmayr 2012 Mid...
21 KB (2,009 words) - 04:00, 7 June 2024
later, on November 15, 2002, a CA$55-million contract was signed with DCC Doppelmayr Cable Car GmbH of Wolfurt, Austria, followed by four years of construction...
12 KB (1,015 words) - 07:37, 28 January 2024
Zermatt - Sunnegga Berg". Funimag. Retrieved 2 June 2014. "Doppelmayr, 2014 report". Doppelmayr. Retrieved 13 January 2015. 46°01′11″N 7°45′40″E / 46.01982°N...
3 KB (140 words) - 03:30, 24 December 2023
with lattice boom: The world's tallest crawler crane". August 2013. "Doppelmayr – Garaventa And Sun Group Build Another High-capacity Island Link". Snowindustrynews...
75 KB (4,094 words) - 10:17, 11 August 2024
Loen Skylift is owned and run by Loen SkyliftAS, where Hotel Alexandra, Doppelmayr Garaventa Group and Stryn Municipality are the largest shareholders. The...
6 KB (404 words) - 05:22, 27 July 2023
the Dakota lift. The resort's third high speed quad came in 1994, when Doppelmayr USA constructed the Timberline Express to replace the I and J double chairlifts...
20 KB (1,402 words) - 20:52, 8 June 2024
feet (3,185 m) above sea level. Construction on the new, 100-passenger Doppelmayr CTEC tram began the day after the Resort closed for the 2006-2007 ski...
11 KB (969 words) - 15:27, 14 May 2024
Spillway lift. That work was completed and the Skyline lift, a $3 million Doppelmayr carpet-loading fixed-grip quad chair, opened during the 2011-12 season...
35 KB (4,258 words) - 21:53, 3 May 2024
at Taksim Square and Kabataş, Istanbul. The funicular was built by the Doppelmayr Garaventa Group and opened on June 29, 2006, the funicular is operated...
7 KB (198 words) - 07:20, 10 August 2024