• station. Kakkad Power House Upper Moozhiyar Dam Upper Moozhiyar Spillway Dam Veluthoda Forebay (Kakkad) Dam Moolamattom hydro power station "Kakkad Hydroelectric...
    4 KB (273 words) - 06:12, 25 August 2023
  • Thumbnail for Veluthodu Dam
    Veluthodu Dam (redirect from Kakkad Dam)
    Veluthodu dam (Malayalam: വെളുത്തോട് അണക്കെട്ട് ) is a part of Kakkad Hydro Electric Project and is located in Seethathode panchayath of Ranni Taluk in Pathanamthitta...
    10 KB (584 words) - 16:07, 23 June 2024
  • Thumbnail for Moozhiyar Dam
    262 MU. The machine was commissioned on 16 September 1999. Kakkad Hydro electric Project is the second stage development of Pamba river basin. The installed...
    5 KB (389 words) - 15:56, 23 June 2024
  • of Seethathodu is Sabarimala, a Hindu hill pilgrim centre. Kakkad Hydro Electric Project Power Plant, India is located at Seethathode,(capacity of 50...
    8 KB (769 words) - 16:20, 15 September 2024
  • Board (KSEB). In addition to the Ullunkal project, EDCL has the Karikkayam Hydroelectric Project in the Kakkad River downstream of the Allunkal dam, with...
    6 KB (487 words) - 13:08, 7 July 2023
  • Thumbnail for Ranni-Perinad Weir
    type and is a part of Ranni – Perinad Small Hydro Electric Project, a run off the river scheme in Kakkad river in Pamba basin. It envisages the development...
    8 KB (349 words) - 16:12, 23 June 2024
  • distance of 58 km (36 mi). It's located on the banks of Pamba River and Kakkad River. Perunad is located on the main road to Sabarimala, the Mannarakkulanji-Chalakkayam...
    16 KB (1,819 words) - 11:20, 13 May 2024
  • Thumbnail for Kerala State Electricity Board
    Pallivasal project in 1940, the Kannan Devan Hills Produce Company closed down its plant. Supply from the Pallivasal hydro-electric project in Travancore...
    17 KB (1,824 words) - 05:27, 21 September 2024