Sandoyartunnilin (transl. Sandoy Tunnel) is an undersea road tunnel in the Faroe Islands. It connects the main island of Streymoy with Sandoy to the south...
7 KB (636 words) - 09:17, 1 November 2024
coupling (cross subsidization) between the two tunnels is necessary since Sandoyartunnilin is not expected to generate sufficient ridership to recover its own...
23 KB (2,351 words) - 15:47, 24 September 2024
kilometres has an estimated cost of 219 million DKK. On Sandoy, the Sandoyartunnilin opened in December 2023 and connects Sandoy to Streymoy. This tunnel...
14 KB (1,319 words) - 18:26, 26 August 2024
connecting Eysturoy and Streymoy, which was completed in 2020, and Sandoyartunnilin, a tunnel connecting Streymoy and Sandoy, will be completed by 2023...
15 KB (1,558 words) - 08:56, 22 May 2024
parliament agreed on how and when to build the Eysturoyartunnilin and the Sandoyartunnilin. The drillings started in 2016 regarding the Eysturoyartunnilin, which...
8 KB (373 words) - 12:58, 27 February 2024
Tórshavn. In 2023, the Faroes' longest single length tunnel opened, Sandoyartunnilin, linking Sandoy to the greater Faroese road network on Streymoy. The...
151 KB (16,029 words) - 19:07, 30 October 2024
Orkney Islands, Sanday in the Inner Hebrides and Sandøy in Norway. The Sandoyartunnilin connects between the centre of the island and Gamlarætt on Streymoy...
7 KB (529 words) - 10:40, 2 April 2024
Archived from the original on 2014-03-16. Retrieved 2016-02-01. "Sandoyartunnilin". Faroese Government. Retrieved 21 December 2023. "Toven tunnel holing...
129 KB (3,443 words) - 21:12, 29 October 2024
island to mainland in Stockholm coastal region 2.9 km 65 m 1959–1964 Sandoyartunnilin Sandoy, Faroe Islands Connecting Sandoy to the main island Eysturoy...
22 KB (1,280 words) - 01:55, 7 October 2024
the local inhabitants. Sandur can be reached from Tórshavn via the Sandoyartunnilin in circa 30 minutes. A direct Strandfaraskip Landsins bus service connects...
12 KB (817 words) - 19:05, 22 October 2024
Eysturoy. One undersea tunnel is currently under construction: the Sandoyartunnilin connecting Streymoy to Sandoy (due to open in 2023). Streymoy is connected...
9 KB (816 words) - 22:28, 22 October 2024
Suðuroy Dual lane, lit. Replaces the Old Hvalbiartunnilin from 1963. Sandoyartunnilin 2023 10,785 35,384 Traðardalur and Gamlarætt Streymoy and Sandoy The...
20 KB (531 words) - 00:51, 7 September 2024
undersea roundabout in the middle of the network. A fourth tunnel, the Sandoyartunnilin, is still under construction. Opening on 26 January 1990, the Dresdner...
9 KB (992 words) - 16:30, 9 June 2024
connected to the capital Tórshavn and the rest of the country via the Sandoyartunnilin. The footpath between Hvalba and Trongisvágur is a popular hiking route...
5 KB (440 words) - 09:25, 1 November 2024
Lognberg, agreed on making two subsea tunnels: Eysturoyartunnilin and Sandoyartunnilin, both are planned to open in 2021 if everything works out as the politicians...
4 KB (249 words) - 09:52, 9 December 2023
Seoul–Yangyang Expressway 10.965 km (Seoul bound) / 10.962 km (Yangyang bound) Sandoyartunnilin Faroe Islands 10.900 km (6.8 mi) 2023 1 Toven Tunnel Norway 10.655 km...
59 KB (2,214 words) - 12:59, 6 October 2024
Belt Fixed Link Øresund Bridge Eysturoyartunnilin Norðoyatunnilin Sandoyartunnilin Vágatunnilin Warnow Tunnel Herrentunnel LKW-Maut A nationwide toll...
35 KB (2,821 words) - 00:51, 20 September 2024
for delay, in a time window between 6:00 am and midnight. Since the Sandoyartunnilin opened in December 2023, Smyril could possibly reroute and use Sandur...
18 KB (1,875 words) - 09:42, 14 April 2024
road tunnels Vágatunnilin, Norðoyatunnilin, Eysturoyartunnilin and Sandoyartunnilin have tolls (but no physical toll booths are present and the toll must...
37 KB (5,080 words) - 10:35, 27 October 2024
dialectical boundary and isogloss in the Faroese language. In 2023, the Sandoyartunnilin opened between Gamlarætt and central Sandoy, replacing the ferries...
3 KB (334 words) - 18:37, 21 December 2023
occasionally via Hestur. This service ceased to operate after the Sandoyartunnilin opened for general traffic. The first part of the place name comes...
8 KB (431 words) - 15:22, 22 October 2024
new indoor sports hall, which was ready to use in November 2012. The Sandoyartunnilin under construction from Gamlarætt on Streymoy emerges at Traðardalur...
5 KB (382 words) - 04:46, 16 September 2023
road tunnels Vágatunnilin, Norðoyatunnilin, Eysturoyartunnilin and Sandoyartunnilin have tolls (but no physical toll booths are present and the toll must...
48 KB (6,242 words) - 16:08, 4 August 2024
web}}: CS1 maint: archived copy as title (link) -72,6 "Eysturoyar- and Sandoyartunnilin". "Vegalongd, Landsverk". "Amended finance law 2003-2". "Avgjørt: Bygdin...
6 KB (579 words) - 01:13, 21 October 2024
junction towards Kirkjubøur, some 1.3 kilometres (0.81 mi) uphill. The Sandoyartunnilin opened in 2023 and it goes from Gamlarætt towards Sandoy.. The tunnel...
5 KB (679 words) - 08:35, 18 July 2024