• De Uithof to "Utrecht Science Park" in 2018. On 14 December 2019, the Uithoflijn line 22 of the Utrecht sneltram (light rail) system opened, connecting...
    8 KB (844 words) - 13:21, 29 August 2024
  • January 2021. Retrieved 27 July 2021. "Aannemer Uithoflijn en leverancier trams geselecteerd". Uithoflijn. 1 December 2014. Archived from the original on...
    32 KB (2,071 words) - 13:36, 23 September 2024
  • Thumbnail for Utrechtse sneltram
    The section running southeast of Utrecht CS is dubbed the Uithof line (Uithoflijn), and runs to P+R Science Park in the Uithof district. Tram routes 20...
    47 KB (4,585 words) - 01:40, 13 September 2024
  • Thumbnail for Utrecht Centraal station
    bus and tram terminal as well as the construction of a new tram line (Uithoflijn), a new station square (Stationsplein), a bicycle storage facility and...
    32 KB (2,963 words) - 20:07, 20 September 2024
  • Thumbnail for Utrecht Vaartsche Rijn railway station
    built six meters above street level. On 14 December 2019, line 22 (the Uithoflijn) of the Utrecht sneltram (light rail) system opened from Utrecht Centraal...
    6 KB (294 words) - 22:01, 13 September 2024