East: LGV Est to Strasbourg and Germany. South-east: LGV Sud-Est, LGV Rhône-Alpes and LGV Méditerranée to Marseille, plus LGV Rhin-Rhône and LGV Perpignan–Figueres...
43 KB (4,600 words) - 12:11, 27 October 2024
over the LGV Est to Paris Est. One train pair per day starts or ends in Munich. The line 84 connects Frankfurt with Marseille over the LGV Rhin-Rhône and...
77 KB (3,843 words) - 11:26, 20 October 2024
operate the remaining Paris to Frankfurt. After the inauguration of the LGV Rhin-Rhône in 2011 a daily high-speed TGV service has been introduced between...
191 KB (16,138 words) - 12:35, 17 November 2024
(January 7, 2017). "La vie à 320km/h: le conducteur de la première rame LGV raconte". Sud-Ouest (in French). ISSN 1760-6454. Retrieved July 17, 2022...
82 KB (2,061 words) - 06:44, 15 November 2024
The bridge remains intact, but unused and without any means of access. The LGV Sud Europe Atlantique became fully operational in July 2017, shortening the...
117 KB (10,459 words) - 11:02, 9 November 2024
that moment on, the current Afgedamde Maas was the main branch of the lower Meuse. The former main branch eventually silted up and is today called the...
123 KB (2,758 words) - 08:49, 23 October 2024