• Thumbnail for Kavi Sukanta metro station
    Kavi Sukanta is a station of Line 6 of the Kolkata Metro in Kalikapur, a southern neighbourhood of Kolkata, India, serving the areas of Kalikapur, Haltu...
    13 KB (836 words) - 18:24, 14 August 2024
  • Thumbnail for Kavi Subhash metro station
    Kavi Subhash (formerly known as New Garia) is the at-grade southern terminus and interchange metro station of the North-South corridor (Blue Line) and...
    14 KB (474 words) - 18:58, 25 October 2024
  • Thumbnail for Hemanta Mukhopadhyay metro station
    the north, and followed by the Kavi Sukanta metro station at 1 km to the south. Views Of Hemanta Mukhopadhyay Metro Station Ruby Crossing View Construction...
    12 KB (697 words) - 23:33, 21 September 2024
  • Thumbnail for Kolkata Metro Line 6
    currently operates between Kavi Subhash and Hemanta Mukhopadhyay. This line will be one of the most important stretches of Kolkata Metro because it will connect...
    18 KB (926 words) - 07:30, 27 October 2024
  • Thumbnail for Jyotirindra Nandi metro station
    station. The previous station of the station is Satyajit Roy Metro Station at a distance of 1.4 km and the next station is Kavi Sukanta Metro Station...
    13 KB (864 words) - 18:23, 14 August 2024
  • Thumbnail for Kavi Nazrul metro station
    Kavi Nazrul (formerly known as Garia Bazar) is an elevated metro station on the North-South corridor of the Blue Line of Kolkata Metro in Kolkata, West...
    8 KB (260 words) - 08:14, 3 September 2024
  • Thumbnail for List of Kolkata Metro stations
    Map all coordinates in "Category:Kolkata Metro stations" using OpenStreetMap Download coordinates as: KML GPX (all coordinates) GPX (primary coordinates)...
    49 KB (1,482 words) - 05:40, 27 October 2024
  • Thumbnail for Kolkata Metro Line 1
    rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, out...
    35 KB (2,254 words) - 07:27, 27 October 2024
  • Thumbnail for Kolkata Metro
    platforms of Kavi Subhash will be operational. The existing Esplanade metro station was upgraded and a subway was constructed to the new metro station to provide...
    138 KB (10,947 words) - 08:28, 27 October 2024
  • Thumbnail for Kolkata Metro Line 4
    underground towards Barasat metro station. It will have an interchange at the Kolkata Airport with Orange Line. The stations of this corridor are: An amount...
    12 KB (668 words) - 07:33, 27 October 2024
  • Thumbnail for Kolkata Metro Line 2
    underwater metro tunnel, along with the deepest metro ventilation shaft. In the deepest metro shaft, the Howrah metro station is be the deepest metro station in...
    71 KB (5,727 words) - 07:26, 27 October 2024
  • Thumbnail for Howrah metro station
    metro station is a metro station of Kolkata Metro Line 2 in Howrah, India. Built underneath Howrah railway station's new and old complex, the metro station...
    13 KB (671 words) - 23:36, 21 September 2024
  • Thumbnail for List of proposed and under-construction Kolkata metro stations
    From Dakshineswar to Kavi Subhash From Howrah Maidan to Kaikhali via Dharmatala As of 2018, extension of East side of Kolkata Metro Line 2 has been proposed...
    12 KB (218 words) - 05:59, 27 October 2024
  • phase Baranagar to Gandhi Ashram Metro station and 2nd phase remaining portion. List of Kolkata Metro stations Kolkata Metro rolling stock Lists of rapid...
    9 KB (586 words) - 07:35, 27 October 2024
  • Thumbnail for Salt Lake Sector-V metro station
    Lake Sector-V) is the elevated eastern metro station on the East-West corridor of the Green Line of Kolkata Metro close to Nabadiganta Industrial Township...
    7 KB (232 words) - 10:03, 29 September 2024
  • Thumbnail for Sealdah metro station
    Sealdah Metro for sponsorship reasons) is an important underground metro station on the East-West corridor of the Green Line of Kolkata Metro, located...
    8 KB (291 words) - 07:13, 18 September 2024
  • Thumbnail for Ritwik Ghatak metro station
    railanalysis3 (13 October 2023). "Kolkata Metro Update: The construction work of Ritwik Ghatak metro station of Kavi Subhash-Biman Bandar corridor going on...
    15 KB (1,052 words) - 04:56, 30 July 2024
  • Thumbnail for East West Metro Tunnel
    by Afcons Infrastructure. The section between Sealdah metro station and Mahakaran metro station was realigned due to the inability of GoWB to provide...
    16 KB (1,701 words) - 12:52, 20 August 2024
  • Thumbnail for Jai Hind metro station
    Jai Hind (also referred to as Biman Bandar) is a metro station of Kolkata Metro. It will serve the city of Kolkata's main airport, the Netaji Subhas Chandra...
    7 KB (497 words) - 17:46, 23 October 2024
  • Thumbnail for Barun Sengupta metro station
    "Kolkata Metro Update: The construction work of Ritwik Ghatak metro station of Kavi Subhash-Biman Bandar corridor going on in full swing". Rail Analysis...
    20 KB (1,326 words) - 04:53, 30 July 2024
  • Thumbnail for Rabindra Sarobar metro station
    followed by the station Mahanayak Uttam Kumar towards Kavi Subhash and is preceded by Kalighat station towards Noapara and Dum Dum. Bus route number 1A, 1B...
    8 KB (330 words) - 08:11, 3 September 2024
  • Thumbnail for VIP Bazar metro station
    construction of the Metro Corridor from Kavi Subhash metro station to VIP Bazar metro station. In January 2012, the construction of the metro station along with...
    15 KB (950 words) - 04:57, 30 July 2024
  • Thumbnail for Beleghata metro station
    Metro: GM Reviews Orange Line's Kavi Subhas to Airport Stretch". Metro Rail News. Retrieved 23 August 2023. "Beleghata-Ruby Section of Kolkata Metro Undergoes...
    27 KB (1,810 words) - 13:58, 23 September 2024
  • Thumbnail for Howrah Maidan metro station
    today Kolkata Metro's Howrah Maidan – Esplanade Metro section, Kavi Subhash – Hemanta Mukhopadhyay Metro section, Taratala – Majerhat Metro section (part...
    9 KB (378 words) - 23:36, 21 September 2024
  • Thumbnail for Jatin Das Park metro station
    Das Park or JD Park is an underground metro station on the North-South corridor of the Blue Line of Kolkata Metro which is located on Shyama Prasad Mukherjee...
    8 KB (296 words) - 08:09, 3 September 2024
  • Thumbnail for Central metro station (Kolkata)
    Central is an underground metro station on the North-South corridor of the Blue Line of Kolkata Metrowhich is located on the crossing of Bepin Behari...
    8 KB (355 words) - 13:25, 19 September 2024
  • Thumbnail for Taratala metro station
    Kavi Subhash-Hemanta Mukhopadhyay under Line 6. Metro arriving at Taratala Metro Station during the 1st run on the opening day Taratala Metro Station...
    14 KB (919 words) - 15:12, 4 October 2024
  • corridor from Mahanayak Uttam Kumar to Kavi Nazrul was completed. Later, as the last extension from Kavi Nazrul to Kavi Subhash was finished, more 3000 series...
    22 KB (1,556 words) - 04:17, 7 October 2024
  • Thumbnail for Mahanayak Uttam Kumar metro station
    as Tollygunge) is an at-grade level metro station on the North-South corridor of the Blue Line of Kolkata Metro which is located in Tollygunge area in...
    9 KB (348 words) - 10:20, 17 September 2024
  • Thumbnail for Kolkata Metro Line 3
    inauguration of line 3 at Joka metro station The day of inauguration of phase 1 List of Kolkata metro stations Kolkata Metro Rolling Stock 2018 Kolkata bridge...
    15 KB (866 words) - 07:29, 27 October 2024