north-east of Kaiserslautern. Winnweiler is the seat of the Verbandsgemeinde ("collective municipality") Winnweiler. Winnweiler station is on the Alsenz Valley...
5 KB (581 words) - 10:20, 11 March 2023
Winnweiler station is the station of the town of Winnweiler in the German state of Rhineland-Palatinate. Deutsche Bahn classifies it as a category 6 station...
12 KB (1,006 words) - 20:58, 2 May 2023
min RE 17 Koblenz – Boppard – Bingen – Bad Kreuznach – Rockenhausen – Winnweiler – Kaiserslautern RB 26 Koblenz – Boppard – Oberwesel – Bingen – Ingelheim...
19 KB (1,688 words) - 13:57, 21 March 2024
Hochspeyer station (redirect from Bahnhof Hochspeyer)
1870, with the opening of the Alsenz Valley Railway (Alsenztalbahn) to Winnweiler; half a year later this line was extended to Bad Münster. The importance...
28 KB (2,701 words) - 03:45, 11 April 2022
Bad Kreuznach station (redirect from Bahnhof Bad Kreuznach)
Retrieved 27 May 2012. "Richtung Zukunft - Modernisierungsarbeiten am Bahnhof Bad Kreuznach" (in German). Zwechverband ZSPNV Rheinland-Pfalz Süd. Archived...
8 KB (457 words) - 20:54, 17 May 2024
towards Merzig (Saar) RB 70 Preceding station Vlexx Following station Winnweiler towards Koblenz Hbf RE 17 Terminus Preceding station Rhine-Neckar S-Bahn...
11 KB (510 words) - 14:50, 8 July 2024
to enable rail operations. The Hochspeyer–Winnweiler section was opened on 29 October 1870. The Winnweiler–Münster section followed on 16 May 1871. With...
21 KB (1,978 words) - 03:30, 23 June 2023
on 29 October 1870 with the opening of the section from Hochspeyer to Winnweiler. On 16 May of the following year it was opened over its whole length....
11 KB (1,072 words) - 20:55, 2 May 2023
Hochspeyer–Bad Münster) and was opened on 16 May 1871 with the section from Winnweiler to Bad Münster. In 1903, the station became the starting point of a narrow...
8 KB (789 words) - 20:58, 2 May 2023
Mühlgasse). The 112-kilometre-long Palatine Ridgeway (hiking trail) leads from Winnweiler by way of Rockenhausen to Wolfstein. The Sport- und Freizeit-Center Königsland...
59 KB (7,334 words) - 08:48, 30 March 2022