A flexible barge is a non-rigid barge usually made of fabric. This[which?] test ended on April 29 when the fabric of one of the two bags under tow developed...
14 KB (1,495 words) - 08:08, 21 October 2024
A dracone barge is a large flexible watertight tube intended to carry a liquid cargo while towed mostly-submerged behind a ship. One large current example...
6 KB (828 words) - 06:31, 13 February 2024
Metal–organic framework Atmospheric water generator Dewvaporation Flexible barge Peak water Pumpable ice technology Soil desalination model Soil salinity...
117 KB (12,496 words) - 18:47, 31 October 2024
(disambiguation) Sprag clutch, a one-way freewheel clutch Spragg Bag, a flexible barge This page lists people with the surname Spragg. If an internal link...
827 bytes (145 words) - 01:29, 22 June 2024
Crane vessel (redirect from Crane barge)
A crane vessel, crane ship, crane barge, or floating crane is a ship with a crane specialized in lifting heavy loads, typically exceeding 1,500 t (1,476...
53 KB (3,802 words) - 03:39, 20 June 2024
operating flexibility and safety, with lower crew costs than a tug and barges hauling the same amount of cargo. Thames sailing barge "Schooner Barge". New...
2 KB (255 words) - 12:32, 8 October 2024
Tupolev Tu-85 (redirect from Tu-85 Barge)
Туполев Ту-85; USAF/DoD reporting name: "Type 31", NATO reporting name: Barge) was a Soviet prototype strategic bomber based on the Tu-4, an unlicensed...
8 KB (976 words) - 01:49, 1 November 2024
Very large floating structure (redirect from Launch vehicle landing barge)
span is 18 m (60 ft) and must not only land within the 52 m (170 ft)-wide barge deck, but must also deal with ocean swells and GPS errors. SpaceX CEO Elon...
17 KB (1,783 words) - 16:49, 18 October 2024
Hovercraft (redirect from Hover barge)
design included the modern features of a lift engine blowing air into a flexible envelope for lift. Kaario's efforts were followed closely in the Soviet...
71 KB (8,438 words) - 22:33, 23 October 2024
for the offshore production of oil or gas. The rig consists of narrow, flexible (compliant) towers and a piled foundation supporting a conventional deck...
4 KB (410 words) - 08:12, 20 September 2024
Canal (redirect from Barge canal)
their own, the last small U.S. barge canals saw a steady decline in cargo ton-miles alongside many railways, the flexibility and steep slope climbing capability...
61 KB (7,935 words) - 17:21, 19 October 2024
Operation Hardtack I (section Barge tests)
construction costs and time and increasing test-scheduling flexibility. In HARDTACK the 26 barge events used only five detonation areas. FIR predicted fallout...
95 KB (10,170 words) - 00:47, 9 October 2024
Linkspan (redirect from Barge slip)
the chassis may touch the ground between the axles Car float – Unpowered barge with railroad tracks mounted on its deck Dover–Dunkerque train ferry – Train...
14 KB (2,145 words) - 04:48, 27 March 2024
and knowledge articles as and when required. Real-time call monitoring/barging system can be used by quality assessment team to provide important guidelines...
5 KB (634 words) - 14:35, 18 April 2024
Cable layer (redirect from Cable-laying barge)
while the repeater was being laid. American ships, for a time, tried using flexible repeaters which passed through the sheave. However, by the 1960s they were...
41 KB (4,813 words) - 16:17, 3 November 2024
pre-commissioning of 52 km of oil production and water injection flow lines, 12 flexible jumpers, 20 km of gas export pipelines, 80 km of umbilicals, and of the...
23 KB (2,131 words) - 15:49, 23 July 2024
Top Loading Arm or a Bottom Loading Arm. Transfer to or from a ship or barge requires a marine loading arm. General feature of Top and Bottom loading...
6 KB (931 words) - 12:33, 17 May 2021
onto the semi-submersible heavy-lift barge Malin Augustea CD01. On 30 August 2024, Cardiff was taken on the barge down the Clyde and up Loch Long to the...
10 KB (565 words) - 16:35, 27 September 2024
The Perdido's hull or spar was constructed by Technip in Pori, Finland. A barge shipped the 22,000 tonne spar 13,200 kilometres (8,200 miles) from the Baltic...
7 KB (783 words) - 11:38, 11 September 2024
a thin, flexible vinyl sheet with a molded-in spiral stylus groove, and is designed to be playable on a normal phonograph turntable. Flexible records...
19 KB (2,104 words) - 13:51, 21 April 2024
(prav/natanko/ravno) tista barka ('that/precise/exact barge') for 'the barge' and neka/ena barka ('some/a barge') for 'a barge'. Definiteness of a noun phrase can also...
55 KB (5,548 words) - 23:59, 31 October 2024
vessels for long-distance movements, with inland movements undertaken by barge, rail or truck. Conventionally the container is unloaded from the ship at...
2 KB (199 words) - 11:20, 8 November 2023
time of its sinking, it was the world's largest dynamically positioned flexible fall pipe rock dumping vessel. The ship was repaired during 2004 and 2005...
7 KB (725 words) - 03:50, 25 July 2024
process, by being rolled onto the Malin Augstea semi-submersible launch barge CD01, then towed down river to the Firth of Clyde and up Loch Long to the...
14 KB (892 words) - 20:38, 16 September 2024
in energy matters led to his invention and development of Dracone flexible barges for transporting oil, fresh water, or other liquids. (The name Dracone...
7 KB (624 words) - 05:41, 25 July 2024
patrolling with PT-44 at Kamimbo Bay, sighted an enemy barge. As the PT-boats opened fire on the barge, Searles saw a surfaced submarine. He quickly fired...
30 KB (3,893 words) - 05:10, 8 June 2024
vessels and their states of decay. Explanatory labels have been provided. One barge has been scheduled as an ancient monument and several are included in the...
46 KB (2,727 words) - 10:30, 4 November 2024
project would not be a conventional ship, but rather a series of linked barges. The Freedom Ship project envisioned an integrated city 1,800 metres (5...
5 KB (465 words) - 18:32, 23 March 2024
resulting in the acquisition of Houston-based Ceanic Corporation, Danish NKT Flexibles and ETPM of France. In 2000, the company changed its name to Stolt Offshore...
6 KB (494 words) - 09:30, 2 November 2024