The Pebble Bed Modular Reactor (PBMR) is a particular design of pebble bed reactor developed by South African company PBMR (Pty) Ltd from 1994 until 2009...
14 KB (1,386 words) - 18:56, 20 March 2024
The pebble-bed reactor (PBR) is a design for a graphite-moderated, gas-cooled nuclear reactor. It is a type of very-high-temperature reactor (VHTR), one...
34 KB (4,206 words) - 14:04, 3 February 2025
Small modular reactors (SMR) are much smaller than the current nuclear reactors (300 MWe or less) and have compact and scalable designs which propose...
66 KB (5,258 words) - 17:39, 19 January 2025
HTGR reactors use helium coolant. The reactor core can be either a "prismatic block" (reminiscent of a conventional reactor core) or a "pebble-bed" core...
15 KB (1,550 words) - 17:40, 10 December 2024
HTR-PM (category Pebble bed reactors)
球床模块式高温气冷堆核电站) is a Chinese small modular nuclear reactor. It is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor evolved from the HTR-10 prototype...
11 KB (1,141 words) - 19:19, 4 December 2024
design) Pebble bed reactor AVR reactor (1966-1988) THTR-300 (1983-1989) HTR-10 (2003-today) HTR-PM (under construction) Pebble bed modular reactor (design)...
6 KB (775 words) - 09:39, 3 February 2025
professor at RWTH Aachen University and the main developer of the pebble bed reactor design, which was originally invented by Farrington Daniels. Schulten's...
4 KB (308 words) - 04:34, 18 November 2024
South African scientist and engineer best known for his work on Pebble Bed modular reactor research and development. He was CEO of the Australian Nuclear...
8 KB (544 words) - 03:18, 4 October 2024
form of the pebble bed reactor design was invested in by the South African government; one such project was the Pebble bed modular reactor (PBMR). In February...
15 KB (1,449 words) - 08:11, 12 November 2024
HTR-10 (category Pebble bed reactors)
HTR-10 is a 10 MWt prototype high-temperature gas-cooled, pebble-bed reactor at Tsinghua University in China. Construction began in 1995, achieving its...
5 KB (443 words) - 01:38, 20 March 2024
Nuclear Reactor". Fortune. Retrieved 2021-10-12. Conca, James (2017-03-27). "X-Energy Steps Into The Ring With Its Advanced Pebble Bed Modular Nuclear...
43 KB (4,300 words) - 02:15, 1 February 2025
pebble-bed modular high-temperature gas-cooled reactor HTR-PM was connected to the grid in 2021. Economic factors of scale mean that nuclear reactors...
101 KB (11,425 words) - 17:34, 19 January 2025
Thorium-based nuclear power (redirect from Thorium based reactor)
nuclear reactor. In South Africa, Steenkampskraal Thorium's planned 100 MW HTMR-100 NPP reactor is based on a variant of the Pebble bed modular reactor. In...
81 KB (8,298 words) - 12:14, 1 February 2025
reached its full capacity at 10 MWth in 2003 using pebble fuel. A 400 MWth pebble bed modular reactor demonstration plant was designed by PBMR Pty for deployment...
8 KB (1,002 words) - 22:12, 16 November 2024
national electricity supplier, Eskom. The Pebble bed modular reactor (PBMR) was a particular design of pebble-bed reactor under development by South African...
4 KB (446 words) - 18:22, 23 November 2024
International Airport Passenger Rail Agency of South African (PRASA) Pebble Bed Modular Reactor (Pty) Limited (PBMR) Perishable Products Export Control Board...
21 KB (1,723 words) - 17:16, 2 May 2024
Joe Bonometti NASA / Naval Postgraduate School YouTube Pebble Bed Advanced High Temperature Reactor Thorium Remix LFTR in 5 Minutes and other LFTR Documentaries...
80 KB (9,120 words) - 07:26, 22 January 2025
X-energy (redirect from Xe-100 reactor)
nuclear reactor and fuel design engineering company. It is developing a Generation IV high-temperature gas-cooled pebble-bed nuclear reactor design. It...
9 KB (1,031 words) - 21:50, 3 January 2025
THTR-300 (redirect from Thorium High Temperature Reactor)
a prototype high-temperature reactor (HTR) to use the TRISO pebble fuel produced by the AVR, an experimental pebble bed operated by VEW (Vereinigte Elektrizitätswerke...
15 KB (1,685 words) - 13:40, 30 November 2024
all reactors need to be shut down for refueling; for example, pebble bed reactors, RBMK reactors, molten-salt reactors, Magnox, AGR and CANDU reactors allow...
118 KB (12,559 words) - 14:04, 5 February 2025
MPa. The cancelled pebble bed modular reactor was intended to be coupled with a helium CCGT. Future nuclear (Generation IV reactors) may employ CCGT for...
9 KB (737 words) - 03:52, 21 January 2025
The Gas Turbine Modular Helium Reactor (GT-MHR) is a class of nuclear fission power reactor designed that was under development by a group of Russian...
4 KB (453 words) - 22:27, 14 October 2024
President Thabo Mbeki's Pebble bed modular reactor programme and the emergence of "Nuclear-1" (a project to build additional nuclear reactors in South Africa)...
4 KB (352 words) - 22:08, 6 May 2024
Africa's PBMR Pty for the construction of a pilot fuel plant for the pebble bed modular reactor project. Other projects include construction of dry spent fuel...
9 KB (838 words) - 04:14, 7 November 2024
Analysis and Optimization of the Power Conversion System for the Modular Pebble Bed Reactor System" (PDF). Technology Review, March 5, 2012: Graphene Battery...
9 KB (939 words) - 10:36, 14 July 2024
RBMK (redirect from Light water graphite-moderated reactor)
Magnox reactor exists in North Korea at the Yongbyon Nuclear Scientific Research Center. While the gas cooled Magnox, AGR and pebble bed reactors (Such...
94 KB (10,708 words) - 06:20, 4 February 2025
Next Generation Nuclear Plant (category Nuclear power reactor types)
South Africa's pebble bed modular reactor (PBMR), in 2012, INL approved a design similar to Areva's SC-HTGR (formerly "Antares") reactor as the chosen...
9 KB (1,122 words) - 17:10, 5 December 2023
States, Europe and Asia. In June 2000, BNFL took a 22.5% stake in Pebble Bed Modular Reactor (Pty) Ltd in South Africa. In January 2003, the research and development...
32 KB (2,544 words) - 08:35, 4 February 2025
National Antarctic Programme is formed. Eskom announces that a Pebble bed modular reactor will be built at Koeberg (this is later abandoned). The Vredefort...
52 KB (15 words) - 11:04, 4 February 2025
authorisation granted to Eskom to build a demonstration module Pebble Bed Modular Reactor (PBMR) at Koeberg, Cape Town. 2004 The clean-up operation for...
11 KB (1,339 words) - 20:50, 5 November 2024