• Thumbnail for REGIDESO Burundi
    3°23′13″S 29°21′41″E / 3.386919°S 29.3615087°E / -3.386919; 29.3615087 REGIDESO Burundi (French: Régie de Production et de Distribution d’eau et d’électricité...
    12 KB (1,348 words) - 14:05, 3 November 2024
  • Thumbnail for Regideso
    The Régie de Distribution d'Eau, abbreviated as REGIDESO, is a state-owned utility company located on Boulevard Du 30 Juin, in the Gombe commune of Kinshasa...
    37 KB (3,671 words) - 06:24, 10 September 2024
  • in the Bururi Province of Burundi. The project is being undertaken for REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines. It includes...
    9 KB (816 words) - 14:00, 18 August 2024
  • 2017, and Regideso would no longer have to practice "load shedding" power cuts. The contract with Interpetrol was for ten years. Regideso would pay Interpetrol...
    14 KB (1,454 words) - 21:39, 1 October 2024
  • Buyenzi in Bujumbura Mairie Province, Burundi. It is owned by Regideso Burundi. In 1995 REGIDESO acquired a 5.5 MW thermal power station in Bujumbura, but...
    8 KB (711 words) - 16:40, 3 November 2024
  • Thumbnail for Kinshasa
    are normal, and exposed lines sometimes electrify pools of rainwater. Regideso, the national public company with primary responsibility for water supply...
    132 KB (11,726 words) - 18:27, 25 October 2024
  • company Regideso Burundi signed a contract with Interpetrol to supply 10 MW for six months. Regideso lost money on the contract. In 2017 Regideso signed...
    5 KB (449 words) - 17:24, 3 November 2024
  • Jiji and Murembwe Hydroelectric Project. It will be owned and operated by REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines. The Jiji...
    5 KB (354 words) - 14:06, 18 August 2024
  • response was to entrust Regideso, the water and electricity company, with importation and distribution of fuel. However, Regideso was not prepared to take...
    8 KB (853 words) - 23:17, 6 October 2024
  • Thumbnail for List of companies of the Democratic Republic of the Congo
    noted as defunct. Office National des Transports head office in Kinshasa Regideso building in Kinshasa Congo Railway's first train arrives in Kindu in 2004...
    10 KB (430 words) - 20:00, 15 October 2023
  • Rushanga, in the Commune of Bugendana. The Ruvyironza plant, owned by REGIDESO Burundi, was commissioned in 1980/1984. Power is supplied by three 425...
    5 KB (349 words) - 20:58, 15 August 2024
  • the hydroelectric capacity of the state-owned water and power utility Regideso, Burundi. The output of the Mugere hydroelectric generating station drops...
    6 KB (417 words) - 21:37, 14 August 2024
  • de la Regideso et au Proseceau (PDF) (in French), REGIDESO, November 2013, retrieved 2024-08-19 Rapport Annuel 2016 (PDF) (in French), Regideso, retrieved...
    5 KB (404 words) - 17:17, 19 August 2024
  • station is Régie de production et distribution d’eau et d’électricité (REGIDESO), the Burundian electricity parastatal utility company. A 25-year power...
    7 KB (589 words) - 14:45, 11 August 2024
  • small ruminants and pigs. The water and electricity supply is provided by REGIDESO, the public water and electricity company. The wastewater and blood are...
    8 KB (775 words) - 21:07, 23 October 2024
  • by the Regie de Production et de Distribution d'Eau et d’Electricite (REGIDESO). At 18 MW, with three 6 MW turbine generators, it was the largest in the...
    6 KB (512 words) - 21:06, 19 August 2024
  • treatment facility is wholly owned by the Régie de distribution d'eau (REGIDESO), the government parastatal company, responsible for provision of potable...
    6 KB (543 words) - 15:28, 29 June 2024
  • Thumbnail for Gombe, Kinshasa
    education institution located in Gombe The Régie de Distribution d'Eau (REGIDESO), the national water utility enterprise, is located on Boulevard Du 30...
    41 KB (3,808 words) - 17:36, 25 October 2024
  • rural Gikungu area of the Commune of Ntahangwa had been without water from REGIDESO Burundi for three months. They were forced to take water from the Ntahangwa...
    8 KB (692 words) - 12:04, 2 November 2024
  • Jiji and Murembwe Hydroelectric Project. It will be owned and operated by REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines. The Mulembwe...
    4 KB (373 words) - 14:06, 18 August 2024
  • potential to expand to 2.8 MW as demand grew in the southern grid. In 2009 REGIDESO Burundi, the water and electricity authority, announced bids to rehabilitate...
    4 KB (228 words) - 20:01, 8 September 2024
  • 3 MWh of power annually. It was implemented in 1984 and is operated by REGIDESO Burundi. It was designed to supply electricity to the Muyinga and Cankuzo...
    6 KB (427 words) - 18:01, 6 September 2024
  • (0.039 in) of precipitation. There is an old hydroelectric dam owned by Regideso on the Sanzu River on the Ruyigi-Kayongozi road, about 3 kilometres (1...
    7 KB (573 words) - 15:45, 6 September 2024
  • spent much of his career at Regideso, the country's public sector water delivery utility. In 1962, Tshiongo joined Regideso as the head of electromechanical...
    4 KB (248 words) - 10:26, 13 October 2023
  • in the rainy season and release through seepage it in the dry season. Regideso Burundi was employing at least 400 workers to dig a 8 kilometres (5.0 mi)...
    4 KB (308 words) - 22:17, 19 August 2024
  • 3°15′35″S 29°39′34″E / 3.259598°S 29.659369°E / -3.259598; 29.659369 Purpose Power Owner(s) REGIDESO Burundi Installed capacity 0.85 megawatts (1,140 hp)...
    4 KB (275 words) - 16:21, 15 August 2024
  • Thumbnail for Kisangani
    produces fabrics and manufactures clothing, while Bralima produces beverages, REGIDESO treats and supplies water to the population, SORGERIE (Société de Gestion...
    114 KB (12,451 words) - 09:31, 2 November 2024
  • program. The others were OPHAVET, BRB, Abattoir Public de Bujumbura (APB), REGIDESO, ONATEL, SOSUMO, COTEBU, UCAR, OTB, SOCABU and SIP. Until 2009 OCIBU had...
    6 KB (484 words) - 15:03, 23 October 2024
  • 29°21′42″E / 3.72346°S 29.36172°E / -3.72346; 29.36172 Purpose Power Owner(s) REGIDESO Burundi Dam and spillways Impounds Ruzibazi River Installed capacity 15...
    5 KB (357 words) - 13:17, 8 September 2024
  • Thumbnail for Water crisis in the Democratic Republic of the Congo
    development partners in the water sector. The state-owned cooperation REGIDESO is responsible for providing water supply services in urban areas. It operates...
    27 KB (3,284 words) - 07:39, 22 June 2024