The Lake Shore Limited is an overnight passenger train operated by Amtrak between Chicago and the Northeastern United States, with sections to New York...
30 KB (2,676 words) - 20:22, 22 October 2024
List of Ohio train stations (section Lake Shore Limited (Chicago – Cleveland – Albany – Boston/New York City))
of Maysville, South Shore–South Portsmouth, Ashland, and Huntington are on Ohio's state border; the South Portsmouth–South Shore station primarily serves...
10 KB (801 words) - 12:49, 28 April 2024
services between Albany and points west, including the Maple Leaf and Lake Shore Limited, carried an additional 366,696. Ticket revenue on the New York City–Albany...
33 KB (2,804 words) - 00:42, 11 October 2024
The Lake Shore Limited was a passenger train service operated by the New York Central Railroad between New York City and Chicago, Illinois, from 1897 to...
8 KB (661 words) - 21:12, 3 April 2024
The Lake Shore and Michigan Southern Railway, established in 1833, and sometimes referred to as the Lake Shore, was a major part of the New York Central...
32 KB (2,360 words) - 00:14, 29 July 2024
parallel Nickel Plate railroad freight line. Amtrak now operates the Lake Shore Limited between New York Penn Station and Chicago Union Station. It follows...
24 KB (2,868 words) - 22:31, 17 May 2024
force in 2019. All trains using the Empire Connection, excluding the Lake Shore Limited, operated into Grand Central Terminal from May 26 to September 4,...
31 KB (2,365 words) - 00:04, 30 July 2024
The current station was built in 1977 to provide service to the Lake Shore Limited route (New York/Boston-Chicago), which was reinstated by Amtrak via...
15 KB (1,466 words) - 21:23, 23 September 2024
Erie, where the Erie West Subdivision begins. Amtrak's Lake Shore Limited uses the Lake Shore Subdivision. The CSX Transportation Albany Division Timetable...
3 KB (308 words) - 07:02, 1 July 2024
the Cleveland Limited westbound, with sleeper passengers having a continuous carriage ride (eastbound riders joined the Ohio State Limited for the Buffalo-New...
25 KB (1,722 words) - 06:47, 23 October 2024
Lake Shore Drive (officially Jean Baptiste Pointe du Sable Lake Shore Drive; also known as DuSable Lake Shore Drive, the Outer Drive, the Drive, LSD or...
47 KB (4,296 words) - 20:35, 16 October 2024
October 19, 2019 – via Newspapers.com. Gregg, Ray (July 6, 1970). "South Shore Plans Dedication Tuesday". The South Bend Tribune. p. 11. Retrieved August...
215 KB (2,014 words) - 22:26, 12 October 2024
South Station stop at Back Bay, as does the Boston section of the Lake Shore Limited. Four MBTA Commuter Rail routes – the Providence/Stoughton Line, Franklin/Foxboro...
28 KB (2,492 words) - 20:13, 18 October 2024
Passenger service is provided on the line by Amtrak, as part of their Lake Shore Limited service, and by the MBTA Commuter Rail system, which owns the section...
35 KB (3,212 words) - 22:46, 9 August 2024
from Chicago the Lake Shore Limited divides at Albany–Rensselaer, with sections to New York and Boston. The Texas Eagle and Sunset Limited are combined between...
44 KB (2,769 words) - 01:32, 22 October 2024
October 27, 1975. Amtrak began operating a Boston-Albany section of the Lake Shore Limited four days later. Boston-New Haven (Inland Route) service was restored...
42 KB (3,497 words) - 03:35, 13 October 2024
while service between Rensselaer and Pittsfield is provided by the Lake Shore Limited. Scribner, David (July 18, 2014). "State to buy Berkshire rail line;...
21 KB (1,499 words) - 23:28, 8 June 2024
Huntington, Cincinnati, and Indianapolis. Along with the Capitol Limited and Lake Shore Limited, it is one of three trains linking the Northeast and Chicago...
42 KB (3,194 words) - 21:20, 29 October 2024
Carbondale, Illinois) Illinois Zephyr and Carl Sandburg (Chicago – Quincy) Lake Shore Limited (Chicago – New York/Boston) Lincoln Service (Chicago – St. Louis)...
65 KB (5,612 words) - 15:28, 25 October 2024
Amtrak added it as a stop on the Lake Shore Limited. The station is served by the Capitol Limited and Lake Shore Limited routes, both of which pass through...
5 KB (341 words) - 19:04, 23 September 2024
the four tracks of the Rochester Subdivision. The Lake Shore Subdivision, used by the Lake Shore Limited, diverges to the south between Buffalo–Depew and...
6 KB (561 words) - 16:56, 16 September 2024
small bus stop-type shelter. Elyria is served by the Capitol Limited and Lake Shore Limited routes, both of which pass through Elyria in the middle of the...
5 KB (307 words) - 19:03, 23 September 2024
between Schenectady and New York City is also used by Empire Service, Lake Shore Limited, and Maple Leaf trains; the Ethan Allen Express acts as an additional...
52 KB (4,491 words) - 12:20, 18 August 2024
Line — which operates between Boston and Worcester — and Amtrak's Lake Shore Limited, which operates between Boston South Station and Albany–Rensselaer...
59 KB (6,181 words) - 06:27, 20 October 2024
and Hudson Lake, Indiana, the South Shore Line runs parallel to Norfolk Southern's Chicago Rail Line, also used by Amtrak's Lake Shore Limited and Capitol...
54 KB (4,031 words) - 00:01, 28 October 2024
in downtown Erie, Pennsylvania, United States. It is served by the Lake Shore Limited route, which provides daily passenger service between Chicago and...
42 KB (4,710 words) - 21:55, 17 June 2024
Chicago plant on October 26, 1994. The first entered service on the Lake Shore Limited in November 1995. All Viewliner I cars were alphabetically named in...
23 KB (2,196 words) - 18:09, 26 October 2024
and lake shores) between Chicago and Boston. It was launched in 1938, in tandem with the relaunch of the newly-streamlined 20th Century Limited, and...
7 KB (649 words) - 23:36, 8 August 2022
Adirondack, Berkshire Flyer, Empire Service, Ethan Allen Express, Lake Shore Limited, and Maple Leaf. The two floor station features a large main lobby...
14 KB (1,124 words) - 10:22, 7 August 2024
Town/City Station Connections MA Boston South Station Amtrak: Acela, Lake Shore Limited MBTA Commuter Rail: Fairmount Line, Framingham/Worcester Line, Franklin/Foxboro...
51 KB (2,686 words) - 21:24, 29 October 2024