MW 50 (Methanol-Wasser 50) was a 50-50 mixture of methanol and water (German: Wasser) that was often sprayed into the supercharger of World War II aircraft...
4 KB (618 words) - 10:05, 20 September 2023
recommendation was implemented. Prices for .mw domains are US$100 for the first two years, followed by $50 per year thereafter. In addition to registrations...
3 KB (181 words) - 20:48, 31 October 2024
either B4 fuel with MW-50, or C-3 fuel without MW-50, in which case the engine was designated DB 605DB, or the use of C-3 fuel with MW-50, in which case the...
19 KB (2,448 words) - 14:00, 30 August 2024
either B4 + MW 50 Methanol Water injection equipment or C3 fuel (DB 605 DB) or C3 fuel with MW 50 (DB 605 DC). The DB when using B4 fuel with MW 50 had an...
98 KB (14,959 words) - 21:24, 8 December 2024
in operation namely Tehri Dam (1000 MW), Koteshwar Dam (400 MW), 50 MW Wind project in Patan (Gujarat) and 63 MW Wind project in Dwarka (Gujarat). In...
3 KB (274 words) - 05:25, 12 October 2024
boost and 560 km/h (350 mph) at sea level using the MW 50 methanol-water boost. It used the MW 50 system mainly for altitudes up to about 10,000 m (33...
30 KB (4,211 words) - 09:15, 22 December 2024
for low-altitude boost known as MW 50 was also used, although GM-1 and MW 50 were rarely used on the same engine. MW-50 injected a methanol-water mixture...
3 KB (499 words) - 00:50, 3 November 2024
title. By early 1944, tactical requirements resulted in the addition of MW-50 water injection boost and high-performance superchargers, boosting engine...
84 KB (10,358 words) - 17:21, 24 December 2024
advised not to use it for more than 5 minutes continuously. The German MW 50 methanol-water injection system required additional piping, as well as a...
10 KB (1,303 words) - 06:07, 8 October 2024
water (MW 50) system (Oldenburg) was fitted, which boosted output to 2,100 PS. By the end of 1944, 60 were delivered with the simplified MW 50 system...
89 KB (13,724 words) - 17:06, 2 July 2024
saw occasional emergency use and were decommissioned in June 1975. A 50 MW, 50 cycle turbo-alternator from Parsons was commissioned in 1951 (no. 1),...
22 KB (3,006 words) - 07:49, 18 October 2024
The Three Gorges (22,500 MW - 32 × 700 MW and 2 × 50 MW) is operated jointly with the much smaller Gezhouba Dam (2,715 MW). The total generating capacity...
28 KB (1,543 words) - 08:41, 5 January 2025
no more than 2.2 MW, and participation is limited to 50 MW in 2012, a limit that increased by 5 to 10 MW/year to a total of 127.5 MW in 2022. Payments...
108 KB (12,538 words) - 03:36, 3 November 2024
(3,000 MW) Schwarze Pumpe power station (1,600 MW) Boxberg power station [de] (1,900 MW) 50% stake in Lippendorf power station [de] (1,840 MW) coal mines...
27 KB (2,388 words) - 20:00, 12 September 2024
expanded again and added 7,600 MW of domestic capacity to its portfolio. The company acquired Dynegy's 50% of 1,800 MW of generation in California. They...
50 KB (5,358 words) - 01:25, 23 October 2024
MW DX, short for mediumwave DXing, is the hobby of receiving distant mediumwave (also known as AM) radio stations. MW DX is similar to TV and FM DX in...
13 KB (1,733 words) - 20:24, 15 September 2024
MW - 2 * 1086) Dukovany (2000 MW - 4 * 510) coal-fired power plants Dětmarovice Power Station (800 MW - 4 * 200) Hodonín Power Station (105 MW - 50 +...
19 KB (1,849 words) - 13:47, 12 November 2024
used with the Luftwaffe's form of methanol-water injection, designated MW 50 (both meant as Notleistung short-term power boosting measures), to produce...
15 KB (2,246 words) - 14:46, 1 October 2024
Sabah Electricity Sdn. Bhd. The total generation capacity of SESB is 866.4 MW, 50.3% of the total units generated are purchased from the independent power...
7 KB (535 words) - 16:33, 22 December 2024
GE Wind (redirect from GE 1.5 MW turbine)
the North American market. Enron had continued production of the 1 MW and 1.5 MW wind turbines of Tacke Windtechnik and GE has expanded production in...
20 KB (1,696 words) - 10:56, 18 September 2024
Power Station (In 50:50 equity JV with NTPC Limited) - 2X660 (1320 MW) Jawaharpur Super Thermal Power Station, Etah district—2x660 MW by Doosan Power Systems...
6 KB (542 words) - 05:17, 12 July 2024
second module production factory (annual capacity : 300 MW + 50 MW) completed 'Total capacity : 600 MW, 5th largest production capacity in Asia (excluding...
4 KB (442 words) - 19:28, 29 March 2024
as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW. Total installed thermal capacity 5400 MW. Two proposed Hydel unit at...
4 KB (80 words) - 17:58, 6 December 2024
intercooled supercharger and delivering 1,750 PS take-off power (2,050 PS with MW 50 boost). 213F Similar to the 213E, but without the intercooler. 213J Project...
13 KB (1,643 words) - 06:08, 9 June 2024
turbines each having a capacity of 700 MW and two 50 MW turbines, totalling the installed capacity to 22,500 MW, more than twice the installed capacity...
154 KB (5,335 words) - 10:05, 27 December 2024
It had a maximum speed of 763 km/h (474 mph) at 6,500 m (21,300 ft) with MW 50 boost, or 686 km/h (426 mph) without boost, and climbed to 8,000 m (26,000 ft)...
28 KB (3,767 words) - 00:57, 26 November 2024
Adding to the power output was a pioneering form of the Luftwaffe's later MW 50 methanol/water injection boost, and was tuned to 3,000 PS (2,959 hp, 2,207 kW)—...
13 KB (1,640 words) - 21:53, 5 October 2024
considerably, delivering 940 PS at 4,000 m (13,000 ft). The R-2 subtype added MW 50 water-methanol injection for added low-altitude performance, boosting power...
8 KB (1,000 words) - 10:49, 26 June 2024
305 ft) Boost speed: 655 km/h (407 mph; 354 kn) at 9,080 m (29,790 ft) with MW 50 water-methanol boost (Junkers Jumo 213E only) Cruise speed: 540 km/h (340 mph...
20 KB (2,607 words) - 18:09, 30 November 2024
capacity of 4240 MW. Further, NLC India has so far installed 51 wind turbine generators of capacity 1.50 MW each and also commissioned a 140 MW solar photo...
30 KB (3,228 words) - 12:37, 29 December 2024