passes underneath the connecting curve between Leipzig-Schönefeld and Leipzig-Engelsdorf stations. After Leipzig-Paunsdorf the main line to Geithain branches...
56 KB (6,322 words) - 22:22, 12 October 2023
Gröbers or Wahren with Bombardier Talent 2 multiple units. The S5X service to Gröbers runs on the mainline tracks and then uses the Erfurt–Leipzig/Halle high-speed...
11 KB (839 words) - 19:24, 12 August 2024
service to the south, a sub-station was put into operation on 1 May 1914 in Wahren along with a 60 kV feeder line. By 1 June 1914, electric rail operations...
30 KB (3,213 words) - 10:24, 28 October 2024
between Leipzig Hbf and Leipzig-Paunsdorf was reduced to a crossing loop in the Leipzig-Dresdener freight yard and all connections to the Engelsdorf freight...
27 KB (3,333 words) - 06:32, 15 March 2024