Orbiter Processing Facility (OPF) is a class of hangars where U.S. Space Shuttle orbiters underwent maintenance between flights. They are located west...
7 KB (712 words) - 12:20, 26 April 2024
institution. Each orbiter incorporated over 21,000 tiles. About 42 reusable RS-25 engines have been part of the STS program, with three used per orbiter per mission...
70 KB (7,506 words) - 22:07, 7 November 2024
was also the design lifetime of each orbiter). They were carefully inspected in the Orbiter Processing Facility after each mission, and damaged or worn...
33 KB (4,074 words) - 01:45, 19 September 2024
Kennedy Space Center Launch Complex 39 (redirect from Orbiter Servicing Arm)
VAB and the pads, Orbiter Processing Facility buildings, a Launch Control Center which contains the firing rooms, a news facility famous for the iconic...
70 KB (7,711 words) - 17:52, 11 November 2024
In January 2014 it was announced that Boeing would lease the Orbiter Processing Facility at Kennedy Space Center to enable the U.S. Air Force to efficiently...
16 KB (1,561 words) - 07:24, 29 August 2024
Kennedy Space Center (redirect from Rotation, Processing and Surge Facility)
Space Florida) Shuttle Landing Facility to Space Florida (who contracts use to private companies) Orbiter Processing Facility (OPF)-3 to Boeing (for CST-100...
65 KB (6,157 words) - 00:21, 14 November 2024
Columbia during the STS-35 countdown. During a rollback to the Orbiter Processing Facility Atlantis was damaged during a hail storm. The eventual launch...
14 KB (1,242 words) - 01:41, 18 October 2024
post-flight orbiter since Return to Flight". On August 31, 2007, NASA reported that the damaged tiles had been removed in the Orbiter Processing Facility, and...
85 KB (8,341 words) - 04:03, 10 November 2024
Building, Orbiter Processing Facility, and Shuttle Landing Facility. Pathfinder is approximately the same size, shape and weight of an actual orbiter. Using...
10 KB (975 words) - 15:04, 21 September 2024
towed a short distance to one of three Orbiter Processing Facility hangars where it was refurbished. When the orbiter was ready, it was towed across the road...
35 KB (3,408 words) - 15:23, 8 November 2024
authority over the Space Shuttle elements from the time the Orbiters left the Orbiter Processing Facility (OPF), were mated to the external tank and solid rocket...
15 KB (1,615 words) - 02:32, 20 March 2024
Space Shuttle Columbia (category Space Shuttle orbiters)
Duration Orbiter pallet. The pallet was used by the orbiter in thirteen of the pallet's fourteen flights, which aided lengthy stays in orbit for scientific...
54 KB (4,691 words) - 23:31, 14 November 2024
test flight. The STS-1 orbiter, Columbia, also holds the record for the amount of time spent in the Orbiter Processing Facility (OPF) before launch – 610...
49 KB (5,923 words) - 04:11, 5 November 2024
Space Shuttle (redirect from Orbiter External Airlock)
attached to the external tank on the MLP. The orbiter vehicle was prepared at the Orbiter Processing Facility (OPF) and transferred to the VAB, where a crane...
109 KB (12,087 words) - 17:59, 11 November 2024
and 31, LDEF was removed from Columbia's payload bay in KSC's Orbiter Processing Facility, placed in a special payload canister, and transported to the...
17 KB (1,646 words) - 16:13, 28 September 2024
Locka Executive Airport (IATA and FAA LID: OPF), Florida, US Orbiter Processing Facility, a class of hangars at Kennedy Space Center, Florida, US This...
722 bytes (115 words) - 00:10, 19 May 2024
Servicing Facility Space Station Processing Facility Orbiter Processing Facility Wikimedia Commons has media related to Multi-Payload Processing Facility. Calculated...
9 KB (819 words) - 02:54, 14 July 2023
(VAB) June 12, 1990, demated, and transferred to the Orbiter Processing Facility (OPF). The orbiter-side 43 cm (17 in) umbilical assembly was replaced with...
20 KB (2,124 words) - 11:04, 6 October 2024
approvals and funding. In October 2011, NASA announced that the Orbiter Processing Facility-3 at Kennedy Space Center would be leased to Boeing for manufacture...
107 KB (9,333 words) - 22:22, 26 October 2024
STS-135 (section Shuttle processing)
liftoff weight: 4,521,143 pounds (2,050,756 kg) Orbiter liftoff weight: 266,090 pounds (120,700 kg) Orbiter landing weight: 226,375 pounds (102,682 kg) Payload...
121 KB (13,252 words) - 04:03, 10 November 2024
Endeavour was towed to Orbiter Processing Facility Bay 1. On 15 October 1998, Endeavour was moved from Orbiter Processing Facility Bay 1 to the Vehicle...
34 KB (2,655 words) - 18:51, 7 September 2024
STS-3xx (redirect from Remote Controlled Orbiter)
made, and the risks of launching another orbiter without resolving the failure which caused the previous orbiter to become disabled would have to be faced...
33 KB (3,240 words) - 23:24, 27 September 2024
Boeing X-37 (redirect from Boeing X-37 Orbital Test Vehicle)
permitting secret activities. Processing for the X-37 is carried out inside Bays 1 and 2 of the Orbiter Processing Facility (OPF) at Kennedy Space Center...
82 KB (7,177 words) - 05:25, 9 November 2024
Space Shuttle Endeavour (redirect from Space shuttle orbiter Endeavour)
Space Shuttle Endeavour (Orbiter Vehicle Designation: OV-105) is a retired orbiter from NASA's Space Shuttle program and the fifth and final operational...
61 KB (4,636 words) - 20:43, 21 October 2024
Space Shuttle Atlantis (category Space Shuttle orbiters)
Space Shuttle Atlantis (Orbiter Vehicle designation: OV‑104) is a retired Space Shuttle orbiter vehicle which belongs to NASA, the spaceflight and space...
58 KB (4,019 words) - 23:38, 4 October 2024
STS-8 (section Orbital operations)
Kennedy Space Center on June 29, 1983, and was transferred to the Orbiter Processing Facility on June 30, 1983. After post-flight maintenance and preparation...
34 KB (4,308 words) - 16:49, 5 August 2024
an orbital crewed space vehicle had been re-flown with a second crew. Prior to launch, Columbia spent 103 days in the Orbiter Processing Facility. It...
21 KB (1,970 words) - 01:36, 4 November 2024
Prior to the launch, Columbia had spent only 70 days in the Orbiter Processing Facility – a record checkout time. The primary objectives of the flight...
20 KB (2,050 words) - 14:15, 17 October 2024
in the aft structure of the Space Shuttle orbiter in the Orbiter Processing Facility prior to the orbiter being transferred to the Vehicle Assembly Building...
106 KB (10,564 words) - 03:24, 26 September 2024
STS-9 (section Shuttle processing)
Assembly Building (VAB), where it was destacked and the orbiter returned to the Orbiter Processing Facility (OPF), while the suspect booster underwent repairs...
16 KB (1,520 words) - 03:44, 9 November 2024