• Thumbnail for Surveyor 1
    Surveyor 1 was the first lunar soft-lander in the uncrewed Surveyor program of the National Aeronautics and Space Administration (NASA, United States)...
    14 KB (1,560 words) - 17:03, 21 August 2024
  • Thumbnail for Surveyor program
    The Surveyor program was a NASA program that, from June 1966 through January 1968, sent seven robotic spacecraft to the surface of the Moon. Its primary...
    10 KB (1,037 words) - 17:02, 21 August 2024
  • Thumbnail for Surveyor 3
    Surveyor 3 is the third lander of the American uncrewed Surveyor program sent to explore the surface of the Moon in 1967 and the second to successfully...
    18 KB (2,057 words) - 01:49, 23 July 2024
  • Thumbnail for Moon landing
    than with the Surveyor 1 soft landing on three footpads using its radar-controlled, adjustable-thrust retrorocket. While Luna 9 and Surveyor 1 were both major...
    116 KB (10,931 words) - 14:23, 27 August 2024
  • Thumbnail for Surveyor 6
    Surveyor 6 is the sixth lunar lander of the American uncrewed Surveyor program that reached the surface of the Moon. Surveyor 6 landed on the Sinus Medii...
    11 KB (1,194 words) - 12:31, 28 May 2024
  • Thumbnail for Surveyor 7
    uncrewed Surveyor program. With two previous unsuccessful missions in the Surveyor series, and with Surveyor 7's landing success, Surveyor 7 became the...
    15 KB (1,649 words) - 20:23, 26 June 2024
  • Thumbnail for Surveyor 5
    Surveyor 5 is the fifth lunar lander of the American uncrewed Surveyor program sent to explore the surface of the Moon. Surveyor 5 landed on Mare Tranquillitatis...
    11 KB (1,252 words) - 13:14, 8 August 2024
  • Thumbnail for Surveyor 2
    Surveyor 2 was to be the second lunar lander in the uncrewed American Surveyor program to explore the Moon. After launch on September 20, 1966 a mid-course...
    8 KB (756 words) - 12:29, 28 May 2024
  • Thumbnail for Surveyor 4
    Surveyor 4 is the fourth lunar lander in the American uncrewed Surveyor program sent to explore the surface of the Moon. This spacecraft crashed after...
    4 KB (285 words) - 12:30, 28 May 2024
  • Thumbnail for IM-1
    IM-1 was a lunar mission that was carried out in February 2024 jointly by a partnership between the NASA CLPS program and Intuitive Machines (IM), using...
    72 KB (5,575 words) - 08:48, 29 August 2024
  • Thumbnail for Hughes Aircraft Company
    Paksat-1 satellite Pioneer program Pioneer Venus Multiprobe Pioneer Venus Orbiter Surveyor program Surveyor 1 Surveyor 2 Surveyor 3 Surveyor 4 Surveyor 5 Surveyor...
    35 KB (3,523 words) - 05:23, 24 August 2024
  • Thumbnail for Lunar lander
    soft-landings out of 27 landing attempts. The United States' Surveyor program first soft-landed Surveyor 1 on June 2, 1966, this initial success was followed by...
    34 KB (3,746 words) - 05:34, 28 June 2024
  • Thumbnail for Surveying
    property sales. A professional in land surveying is called a land surveyor. Surveyors work with elements of geodesy, geometry, trigonometry, regression...
    57 KB (7,269 words) - 12:29, 16 August 2024
  • Thumbnail for List of missions to the Moon
    Archived from the original on 27 July 2019. Retrieved 5 December 2013. "Surveyor 1". US National Space Science Data Center. Archived from the original on...
    199 KB (5,513 words) - 19:34, 29 August 2024
  • Thumbnail for Apollo 11
    Orbiter program and information about surface conditions provided by the Surveyor program. The best Earth-bound telescopes could not resolve features with...
    187 KB (19,719 words) - 20:29, 21 August 2024
  • Thumbnail for Hughes H-1 Racer
    The Hughes H-1 Racer is a racing aircraft built by Hughes Aircraft in 1935. Utilizing different wings, it set both a world airspeed record and a transcontinental...
    18 KB (2,008 words) - 17:29, 6 August 2024
  • Thumbnail for Artemis 1
    Artemis 1, officially Artemis I and formerly Exploration Mission-1 (EM-1), was an uncrewed Moon-orbiting mission. As the first major spaceflight of NASA's...
    106 KB (8,961 words) - 11:11, 17 August 2024
  • Thumbnail for Third-party evidence for Apollo Moon landings
    the United States followed with Surveyor 1 in June 1966, but no uncrewed landers carried retroreflectors before Lunokhod 1 in November 1970. The retroreflectors...
    46 KB (4,965 words) - 20:29, 26 August 2024
  • Thumbnail for Luna 1
    Luna 1, also known as Mechta (Russian: Мечта [mʲɪt͡ɕˈta], lit.: Dream), E-1 No.4 and First Lunar Rover, was the first spacecraft to reach the vicinity...
    15 KB (1,487 words) - 03:12, 27 August 2024
  • Thumbnail for Apollo 12
    110:20:38.1. Conrad had trained to expect a pattern of craters known as "the Snowman" to be visible when the craft underwent "pitchover", with the Surveyor crater...
    63 KB (7,677 words) - 03:07, 31 July 2024
  • Thumbnail for Chandrayaan-1
    Chandrayaan-1 (pronunciation; from Sanskrit: Chandra, "Moon" and yāna, "craft, vehicle") was the first Indian lunar probe under the Chandrayaan programme...
    98 KB (9,093 words) - 08:33, 15 July 2024
  • Thumbnail for Soft landing
    suborbital trajectory by Bell Rocket Belt and on an orbital trajectory by the Surveyor 1. Horizontal landing, most aircraft and some spacecraft, such as the Space...
    2 KB (199 words) - 15:07, 12 February 2024
  • Thumbnail for Lunokhod 1
    Lunokhod 1 (Russian: Луноход-1 "Moonwalker 1"), also known as Аппарат 8ЕЛ № 203 ("Device 8EL No. 203") was the first robotic rover on the Moon and the...
    15 KB (1,422 words) - 02:17, 2 August 2024
  • variations such as "Chartered Building Surveyor" or "Chartered Quantity Surveyor" or "Chartered Civil Engineering Surveyor" depending on their field of expertise)...
    15 KB (1,444 words) - 20:37, 27 March 2024
  • Thumbnail for Atlas-Centaur
    several crucial spaceflight missions for the United States, including Surveyor 1, Mariner 4, and Pioneer 10/11. The vehicle would be continuously developed...
    30 KB (4,041 words) - 02:44, 28 August 2024
  • Thumbnail for List of artificial objects on the Moon
    Catalog – Surveyor 1". Retrieved 2010-12-24. "NASA NSSDC Master Catalog – Luna 13". Retrieved 2010-12-24. "NASA NSSDC Master Catalog – Lunar Orbiter 1". Retrieved...
    62 KB (2,296 words) - 09:24, 20 August 2024
  • Thumbnail for Oceanus Procellarum
    provide prolonged heating. The robotic lunar probes Luna 9, Luna 13, Surveyor 1 and Surveyor 3 landed in Oceanus Procellarum. Luna 9 landed southwest of Galilaei...
    13 KB (1,347 words) - 15:18, 13 August 2024
  • Thumbnail for Luna programme
    missions to the Moon Soviet crewed lunar programs Soviet space program Surveyor program Pioneer program Ranger program Amy Shira Teitel (13 April 2017)...
    26 KB (1,380 words) - 13:55, 5 July 2024
  • Stonehenge (c.2500 BC) suggests that the monument was set out by prehistoric surveyors using peg and rope geometry. In the sixth century BC geometric based techniques...
    17 KB (2,019 words) - 07:37, 30 January 2024
  • Thumbnail for List of NASA missions
    March 1965, completed Surveyor program Surveyor 1, launched May 1966, completed Surveyor 2, launched September 1966, failed Surveyor 3, launched April 1967...
    48 KB (3,943 words) - 19:58, 21 July 2024