• Thumbnail for Aéroport d'Orly station
    plateau was awarded to Vinci Construction Spie Batignolles and Dodin Campenon-Bernard at a cost of €799 million. The Aéroport d'Orly station was designed...
    15 KB (1,391 words) - 13:22, 3 October 2024
  • Construction Grands Projets, Spie Batignolles Civil Engineering, Dodin Campenon-Bernard, Vinci Construction France, Spie Batignolles Foundations and Boots...
    32 KB (3,615 words) - 02:36, 26 September 2024
  • Thumbnail for Saverne Tunnel
    of 13 companies, led by Dodin Campenon-Bernard [fr]. The Saverne Tunnel was built by Spie Batignolles and Dodin Campenon-Bernard, at a cost of approximately...
    18 KB (1,539 words) - 01:55, 1 November 2024
  • Thumbnail for Rauze Viaduct
    the other outer spans being 91 m and 74 m long. It was built by Dodin Campenon-Bernard, with the balanced cantilever method. Pre-stressing was by Spie...
    4 KB (231 words) - 01:34, 1 July 2024
  • Thumbnail for Hôpital Bicêtre station
    and its two ventilation structures began on 23 April 2018 by the Dodin Campenon Bernard / VINCI consortium. On 24 September 2020, Allison, a tunnel boring...
    9 KB (789 words) - 14:06, 4 September 2024