The Siemens Mireo is a family of electric multiple units (EMU) designed by Siemens Mobility. It is designed to be a successor to the "Mainline" variant...
8 KB (700 words) - 16:45, 19 September 2024
from April 2024 on electrified and unelectrified track, the 120 seat Siemens Mireo Plus B battery-powered/overhead power line trains. On only battery operation...
41 KB (4,483 words) - 12:57, 8 November 2024
Siemens Mobility is a division of Siemens. With its global headquarters in Munich, Siemens Mobility has four core business units: Mobility Management,...
22 KB (1,200 words) - 17:56, 20 October 2024
Rhine-Neckar S-Bahn (section Class 463 – Siemens Mireo)
operated by new Siemens Mireo rolling stock. A corresponding contract for 57 three-part sets was signed between DB Regio AG and Siemens in August 2017...
52 KB (4,568 words) - 14:00, 24 August 2024
and in 6 minutes (i.e. at 8C) for the 23 Ah cell. In April 2024, four Siemens Mireo Plus B battery-electric trains were placed into service, powered by...
21 KB (2,074 words) - 12:52, 10 November 2024
Ostbrandenburg 2 services will use battery-electric multiple units (Siemens Mireo+B; apart from the line Berlin-Kostrzyn which will continue to use some...
16 KB (1,542 words) - 06:49, 25 October 2024
450 GT8-100C/2S Stadtbahn Karlsruhe Retired 462 Siemens Desiro HC Regional services 463 Siemens Mireo S-Bahn Services: Rhine-Neckar, S-Bahn Mitteldeutschland...
27 KB (149 words) - 17:55, 5 October 2024
Heidelberg, Kaiserslautern VRN, KVV, HNV, saarVV 2003 7 370 km 425, Siemens Mireo DB Regio Südwest 2017, 2033 Rhein-Ruhr S-Bahn (Ruhrschnellverkehr) S-Bahn...
43 KB (4,524 words) - 23:11, 20 October 2024
Finsterwalde (Niederlausitz) – Calau (Nl) – Cottbus 215 Every 2 hours Siemens Mireo DB Regio Nordost RE 11 Leipzig Hbf – Taucha – Eilenburg – Torgau – Beilrode –...
59 KB (104 words) - 02:43, 25 October 2024
Donauwörth–Treuchtlingen Munich–Augsburg 920, 910, 980 Arverio Bayern Siemens Mireo (463) Siemens Desiro HC (462) RB 80 Some trains in the peak Mainfrankenbahn...
78 KB (413 words) - 13:51, 31 July 2024
of 2009 to 2022. Since the timetable change in December 2022, Siemens Mireo and Siemens Desiro HC multiple units have been used for the services operated...
17 KB (1,746 words) - 14:03, 2 April 2024
operations on 9 June 2019, Stadler FLIRT multiple units have been used. Siemens Mireo electric multiple units are operated by Go-Ahead Bayern between Aalen...
24 KB (2,916 words) - 06:18, 19 August 2024
Andernach – Koblenz – Bingen – Mainz Hbf 470 trans regio 1–2 × 460 Siemens Mireo RB 29 Lower Westerwald Railway Dieselnetz Eifel-Westerwald-Sieg Limburg...
35 KB (260 words) - 13:24, 24 August 2024
Falkenberg – Doberlug-Kirchhain – Cottbus – Guben – Frankfurt (Oder) 120 Siemens Mireo (class BR 463) DB Regio Nordost RE 11 Leipzig – Eilenburg – Torgau –...
18 KB (56 words) - 12:48, 21 August 2024
transport for twelve years. The line is now operated with three-carriage Siemens Mireo electric multiple units. The line is of great importance for freight...
12 KB (865 words) - 17:47, 13 August 2024
operate". Two other hydrogen trains have been reported as of 2023: Mireo Plus H by Siemens in Germany (under development) and an urban train by the Railway...
67 KB (6,652 words) - 00:51, 6 November 2024