situated 45 meters underground and will feature entrances on both sides of Solnavägen. The Södra Hagalund station will include two main entrances: one located...
4 KB (305 words) - 11:26, 3 October 2024
tunnelling work, which began in 2020, includes blasting tunnels under Solnavägen and Vasastaden to connect with Odenplan. The expected completion of the...
5 KB (349 words) - 20:18, 3 October 2024
replaced with a permanent overbuild. The stretch is now simply designated as Solnavägen ("Solna Road") instead of Solnabron. When inaugurated in 1942, the bridge...
3 KB (323 words) - 02:39, 21 August 2023