• Thumbnail for Siemens Mireo
    The Siemens Mireo is a family of electric multiple units (EMU) designed by Siemens Mobility. It is designed to be a successor to the "Mainline" variant...
    10 KB (753 words) - 11:18, 3 December 2024
  • Thumbnail for Battery electric multiple unit
    from April 2024 on electrified and unelectrified track, the 120 seat Siemens Mireo Plus B battery-powered/overhead power line trains. On only battery operation...
    42 KB (4,493 words) - 06:51, 27 December 2024
  • Siemens Mobility GmbH is a division of Siemens. With its global headquarters in Munich, Siemens Mobility has four core business units: Mobility Management...
    22 KB (1,230 words) - 20:23, 23 December 2024
  • operated by new Siemens Mireo rolling stock. A corresponding contract for 57 three-part sets was signed between DB Regio AG and Siemens in August 2017...
    52 KB (4,570 words) - 07:43, 14 December 2024
  • and in 6 minutes (i.e. at 8C) for the 23 Ah cell. In April 2024, four Siemens Mireo Plus B battery-electric trains were placed into service, powered by...
    21 KB (2,056 words) - 12:52, 10 November 2024
  • Thumbnail for List of Deutsche Bahn AG locomotives and railbuses
    450 GT8-100C/2S Stadtbahn Karlsruhe Retired 462 Siemens Desiro HC Regional services 463 Siemens Mireo S-Bahn Services: Rhine-Neckar, S-Bahn Mitteldeutschland...
    28 KB (149 words) - 15:49, 30 November 2024
  • Thumbnail for Niederbarnimer Eisenbahn
    Ostbrandenburg 2 services will use battery-electric multiple units (Siemens Mireo+B; apart from the line Berlin-Kostrzyn which will continue to use some...
    16 KB (1,577 words) - 07:03, 18 December 2024
  • Thumbnail for Rail transport in Germany
    Class 620 DMU of DB Stadler FLIRT EMU of Vias DB Class 462 EMU of BWegt Siemens Mireo of Arverio Long-distance services of Deutsche Bahn (DB) are operated...
    42 KB (2,792 words) - 11:28, 25 December 2024
  • Thumbnail for S-Bahn
    Heidelberg, Kaiserslautern VRN, KVV, HNV, saarVV 2003 7 603 km 425, Siemens Mireo DB Regio Südwest 2017, 2033 Rhein-Ruhr S-Bahn (Ruhrschnellverkehr) S-Bahn...
    42 KB (4,406 words) - 10:53, 29 December 2024
  • Finsterwalde (Niederlausitz) – Calau (Nl) – Cottbus 215 Every 2 hours Siemens Mireo DB Regio Nordost RE 11 Leipzig Hbf – Taucha – Eilenburg – Torgau – Beilrode –...
    59 KB (104 words) - 10:40, 16 December 2024
  • East–Munich Airport 930 DB Regio Bayern + agilis Verkehrsgesellschaft Siemens Mireo RB 22 60 Ebermannstadt – Forchheim (– Bamberg – Lichtenfels) Forchheim–Beringersmühle...
    79 KB (413 words) - 20:21, 11 December 2024
  • of 2009 to 2022. Since the timetable change in December 2022, Siemens Mireo and Siemens Desiro HC multiple units have been used for the services operated...
    17 KB (1,746 words) - 14:03, 2 April 2024
  • Thumbnail for Stuttgart-Bad Cannstatt–Nördlingen railway
    operations on 9 June 2019, Stadler FLIRT multiple units have been used. Siemens Mireo electric multiple units are operated by Go-Ahead Bayern between Aalen...
    24 KB (2,916 words) - 06:18, 19 August 2024
  • Andernach – Koblenz – Bingen – Mainz Hbf 470 trans regio 1–2 × 460 Siemens Mireo RB 29 Lower Westerwald Railway Dieselnetz Eifel-Westerwald-Sieg Limburg...
    35 KB (260 words) - 13:24, 24 August 2024
  • Falkenberg – Doberlug-Kirchhain – Cottbus – Guben – Frankfurt (Oder) 120 Siemens Mireo (class BR 463) DB Regio Nordost RE 11 Leipzig – Eilenburg – Torgau –...
    18 KB (56 words) - 12:48, 21 August 2024
  • Thumbnail for Treuchtlingen–Würzburg railway
    transport for twelve years. The line is now operated with three-carriage Siemens Mireo electric multiple units. The line is of great importance for freight...
    12 KB (865 words) - 17:47, 13 August 2024
  • operate". Two other hydrogen trains have been reported as of 2023: Mireo Plus H by Siemens in Germany (under development) and an urban train by the Railway...
    67 KB (6,666 words) - 18:56, 2 January 2025