The HTR-PM (Chinese: 球床模块式高温气冷堆核电站) is a Chinese small modular nuclear reactor. It is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor...
11 KB (1,066 words) - 22:29, 14 October 2024
Shidao Bay Nuclear Power Plant (section HTR-PM)
plant has the first fourth-generation nuclear reactors in the world: the HTR-PM, a high-temperature gas-cooled reactor (HTGR) concept (36°58′45″N 122°31′50″E...
19 KB (1,595 words) - 03:34, 17 October 2024
operated in full power condition in January 2003. Two HTR-PM reactors, scaled up versions of the HTR-10 with 250-MWt capacity, were installed at the Shidao...
5 KB (443 words) - 01:38, 20 March 2024
Rudolf Schulten (redirect from HTR-MODUL)
operate a 10 MW test reactor (HTR-10) of this type. The Chinese are, as of 2015, building a commercial pebble-bed reactor: HTR-PM, with two 100MWe reactors...
4 KB (302 words) - 23:31, 29 December 2023
the first country to operate a demonstration generation-IV reactor, the HTR-PM in Shidaowan, Shandong, which is a pebble-bed type high-temperature gas-cooled...
43 KB (4,314 words) - 21:45, 30 September 2024
reactor core) or a "pebble-bed" core. China Huaneng Group currently operates HTR-PM, a 250 MW HTGR power plant in Shandong province, China. The high operating...
15 KB (1,542 words) - 10:34, 19 August 2024
D-T reactors. The HTR-PM is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor partly based on the earlier HTR-10 prototype reactor...
65 KB (5,185 words) - 11:26, 19 October 2024
to South Africa as the PBMR and China as the HTR-10. The HTR-10 prototype was developed into China's HTR-PM demonstration plant, which connects two reactors...
34 KB (4,220 words) - 17:23, 16 August 2024
incidents and technical difficulties. The HTR-10 is operating in China, where the HTR-PM is being developed. The HTR-PM is expected to be the first generation...
99 KB (11,510 words) - 21:33, 16 October 2024
the world. China's pebble-bed modular high-temperature gas-cooled reactor HTR-PM was connected to the grid in 2021. Economic factors of scale mean that nuclear...
101 KB (11,357 words) - 18:33, 19 October 2024
Pebble bed reactor AVR reactor (1966-1988) THTR-300 (1983-1989) HTR-10 (2003-today) HTR-PM (under construction) Pebble bed modular reactor (design) Gas-cooled...
6 KB (773 words) - 20:24, 31 August 2024
neutron reactor Generation IV reactor PBMR Very high temperature reactor HTR-10 HTR-PM Fouquet, Doug. "Peter Fortescue Dies at 102". Retrieved 20 November...
8 KB (1,002 words) - 15:16, 10 May 2024
basis of the technology licensed to China[citation needed] to build HTR-10 and the HTR-PM, which became operational in 2021. The reactor is located next to...
14 KB (1,534 words) - 18:33, 23 September 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
1 KB (140 words) - 05:28, 10 August 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
16 KB (1,921 words) - 21:33, 29 August 2024
Peach Bottom, AVR, HTTR, and HTR-10 as well as for small-scale commercial reactors, Fort St. Vrain and THTR-300. The HTR-PM in China is under construction...
11 KB (1,336 words) - 20:54, 17 June 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
25 KB (3,329 words) - 17:29, 7 April 2024
designs. The HTR-PM, a HTGR, is under construction. The HTR-PM is a descendant of the AVR reactor, and it is partly based on the earlier Chinese HTR-10 reactor...
67 KB (5,992 words) - 00:51, 16 October 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
55 KB (7,509 words) - 05:03, 19 September 2024
including the Japanese High-temperature engineering test reactor, the Chinese HTR-10, the South African PBMR, and the Russian GT-MHR. While none of these designs...
25 KB (3,333 words) - 12:55, 1 April 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
16 KB (1,592 words) - 04:49, 30 July 2024
a Chinese joint venture was set up to build an initial CAP1400 near the HTR-PM at Shidao Bay Nuclear Power Plant. In 2015, site preparation started, and...
59 KB (6,009 words) - 19:31, 5 October 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
21 KB (2,679 words) - 06:03, 10 October 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
17 KB (1,943 words) - 16:30, 3 September 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
24 KB (2,723 words) - 14:11, 2 October 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
12 KB (1,510 words) - 14:20, 8 July 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
116 KB (14,400 words) - 15:27, 2 September 2024
world-nuclear-news.org. Retrieved 23 March 2023. "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News". "China...
194 KB (2,790 words) - 11:16, 19 October 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
13 KB (1,129 words) - 21:07, 29 August 2024
CO2 Uranium Naturel Graphite Gaz (UNGG) Magnox Advanced gas-cooled (AGR) He GTMHR MHR-T UHTREX VHTR (HTGR) PBR (PBMR) AVR HTR-10 HTR-PM THTR-300 PMR...
35 KB (3,087 words) - 14:36, 17 October 2024