• Thumbnail for Berliner Verkehrsbetriebe
    BVG Class E Triebwagen 102 - BVG Class E Triebwagen 103 - BVG Class E Triebwagen 104 - BVG Class E Triebwagen 105 - BVG Class E Triebwagen 110 - BVG Class...
    21 KB (2,092 words) - 19:31, 15 August 2024
  • (served by the U4) and Preungesheim (served by the U5). Originally planned as an independent main line, part of the D Line forms an extension of U4 to Bockenheimer...
    41 KB (5,234 words) - 20:17, 4 October 2024
  • no through services, but parts of it are used by underground services U1, U4, U8, U9 and tram lines 12, 15 and 21. The planned Ginnheim Curve (Ginnheimer...
    21 KB (2,783 words) - 18:45, 1 October 2024
  • Thumbnail for U-Bahn Line C (Frankfurt U-Bahn)
    (MD) Every 20 min. (N) Operator(s) Stadtwerke Frankfurt Rolling stock U5-Triebwagen History Opened 1986 Technical Line length 8.7 km (5.4 mi) 20 minutes (avg...
    24 KB (3,458 words) - 15:53, 7 February 2024
  • Thumbnail for U-Bahn Line A (Frankfurt U-Bahn)
    between the already existing distance main station – Bockenheimer Warte (U4) and the final stop Ginnheim the line U1, for which already a baureife planning...
    59 KB (7,946 words) - 09:44, 21 September 2024