The RABe 501, nicknamed Giruno, is a high-speed electric multiple unit train built by Stadler Rail of Switzerland for the Swiss Federal Railways (SBB)....
15 KB (1,364 words) - 13:25, 23 June 2024
New Pendolino (redirect from SBB-CFF-FFS RABe 503)
generation was launched in 2006 with ETR 600 for Trenitalia and ETR 610 / RABe 503 for Cisalpino, a railway company that operated trains between Switzerland...
24 KB (2,330 words) - 14:22, 6 September 2024
cooling. This was a temporary measure until newer non-tilting trains SBB RABe 501 Giruno trains became available. All forty-four RABDe 500 trains are named...
14 KB (1,221 words) - 18:40, 19 September 2024
speeds on capacity.[citation needed] The fastest Swiss train is the SBB RABe 501, nicknamed Giruno (Romansh for Buzzard). It is operated by the Swiss...
8 KB (685 words) - 19:10, 30 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
7 KB (581 words) - 22:49, 26 August 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
14 KB (1,208 words) - 21:46, 28 August 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
137 KB (14,264 words) - 18:10, 1 October 2024
Rollmaterial [rolling stock]. BTS Bahn Technik – Seminar 2003 (in German). Bern: SBB. pp. 51–52. "L'aluminium monte dans le TGV". Les Echos (in French). 1 April...
17 KB (1,778 words) - 21:07, 25 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
77 KB (6,911 words) - 17:09, 30 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
22 KB (1,666 words) - 20:59, 2 October 2024
and seven ETR 610) and SBB (four ETR 470 and seven ETR 610). The low reliability of the timetable and of the ETR 470 has led SBB and Trenitalia to always...
48 KB (5,299 words) - 23:29, 26 August 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
22 KB (1,774 words) - 10:41, 13 August 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
18 KB (1,845 words) - 19:19, 21 August 2024
in 1993. Fifty dual-voltage trainsets were built in 1992–1994, numbered 501-550. A further 40 triple-voltage trainsets, numbered 4501-4540, were built...
8 KB (731 words) - 12:16, 20 June 2024
using the Mannheim–Stuttgart and Karlsruhe–Basel high-speed lines. Swiss SBB high-speed services using the New Pendolino from Frankfurt to Milan on the...
11 KB (1,037 words) - 11:27, 21 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
91 KB (10,061 words) - 19:31, 9 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
21 KB (2,074 words) - 09:50, 10 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
16 KB (1,436 words) - 13:06, 28 July 2024
with parts falling onto the track. Four bogies out of 24 derailed. Out of 501 passengers, seven were bruised and others treated for shock. 14 November...
59 KB (6,442 words) - 02:31, 4 October 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
25 KB (2,079 words) - 19:43, 3 October 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
80 KB (2,047 words) - 09:40, 2 October 2024
the dissolution of Cisalpino they were split between SBB (4 sets) and Trenitalia (5 sets). SBB planned to retire its 4 sets in 2014 at the latest. Because...
13 KB (1,263 words) - 14:29, 19 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
13 KB (1,033 words) - 00:37, 13 August 2024
double-deck push-pull train in Switzerland and is run by Swiss Federal Railways (SBB-CFF-FFS) as part of its InterCity service. Top speed is 200 km/h. The train...
9 KB (861 words) - 00:32, 23 February 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
30 KB (2,728 words) - 07:56, 15 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
23 KB (1,860 words) - 09:34, 31 August 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
9 KB (621 words) - 08:27, 27 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
10 KB (872 words) - 14:05, 11 January 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
18 KB (1,529 words) - 07:01, 15 September 2024
2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
8 KB (548 words) - 16:17, 2 September 2024