1600 ton maximum lift capacity sheerleg Taklift 7 of Smit International...
19 KB (785 words) - 04:57, 20 September 2024
Archived from the original (PDF) on 17 July 2011. Retrieved 7 May 2010. "Equipment Sheet: Taklift 7" (PDF). Boskalis. Archived from the original (PDF) on 24...
18 KB (1,364 words) - 20:05, 30 September 2024
May 2007. To pull the vessel from the seabed, the 1,200 tonne sheerleg Taklift 7 was used in combination with pumping pressurized air into the closed compartments...
7 KB (504 words) - 09:55, 15 December 2023
1600 ton maximum lift capacity sheerleg Taklift 7 of Smit International...
4 KB (525 words) - 11:28, 20 September 2024
in Poland and assembled on the hull by floating cranes Matador III and Taklift 4 after the launch. In August, The Irish Times reported that her delivery...
9 KB (743 words) - 18:09, 24 July 2024
Eemshaven. The transportation of the Tripods to the location was done by Taklift 4 from Boskalis one by one. The year 2010 marked the next milestone in...
15 KB (2,107 words) - 02:57, 23 August 2024
Integration and Floatover Technology. Beijing: Science Press. p. 18. ISBN 978-7-03-051206-2. Retrieved 21 March 2018. Beckman, Jeremy (1 February 2005). "Libya...
53 KB (3,802 words) - 03:39, 20 June 2024