European Train Control System (redirect from ETCS Level 3)
(ETCS) is a train protection system designed to replace the many incompatible systems used by European railways, and railways outside of Europe. ETCS is...
153 KB (16,811 words) - 12:12, 7 January 2025
Automatic train control (redirect from ATC-3)
incompatible with ERTMS/ETCS (as in the case of the Bothnia Line which is the first railway line in Sweden to exclusively use ERTMS/ETCS), and with the aim...
31 KB (4,187 words) - 02:28, 28 November 2024
with trains equipped with ETCS L3 train control systems. There is also an optional variant to allow trains with ETCS level 2 train control systems to...
7 KB (779 words) - 16:54, 19 February 2024
where ETCS is mixed with NTC of ASFA and LZB. Operational principle of ETCS in mixed operation: NTC and ETCS Level 2 The principle of mixed level signalling...
19 KB (2,146 words) - 05:13, 25 July 2024
components are the European Train Control System (ETCS) and the GSM-R communications system. ETCS is a standard for track-train radio communications...
15 KB (1,370 words) - 10:08, 4 October 2024
Thameslink were the first to use ATO on the UK mainline railway network with ETCS Level 2. In April 2022, JR West announced that they would test ATO on a 12-car...
39 KB (2,582 words) - 17:18, 29 December 2024
permitted by the brake curve, and the route set. ATACS has been compared to ETCS Level 3 ATACS is deployed on the following lines: Senseki Line (with ATS-Ps as...
8 KB (775 words) - 01:23, 18 November 2024
signalling using DMI. Currently, Level 4 is not in use on any tracks and exists only as a conceptual system equivalent to ETCS-3. It is being developed and...
9 KB (876 words) - 10:33, 30 December 2024
travelling, etc.; Specifying non-static parts of a level, such as doors, keys and buttons with associated mechanisms, teleporters, hidden passageways, etc.; Specifying...
31 KB (3,500 words) - 18:52, 3 January 2025
Zeitung. 26 April 2007. "ETCS starts well". Today's Railways Europe (129): 57. September 2006. Trümpi, Arnold (6 June 2007). "ETCS Level 2: success for the...
5 KB (482 words) - 17:08, 12 November 2024
Atmospheric pressure (redirect from Sea level pressure)
transmitted as 987; etc. The highest sea-level pressure on Earth occurs in Siberia, where the Siberian High often attains a sea-level pressure above 1,050 hPa...
23 KB (2,430 words) - 08:13, 31 December 2024
(1,500 V DC) Railway signalling: Aoba-dōri — Higashi-shiogama:ATACS(≈ETCS Level 3) Higasi-Shiogama —Ishinomaki: ATS-Ps CTC center: Miyagino Operation Control...
21 KB (1,693 words) - 18:36, 5 January 2025
as amended – Authorisation of Class 197 ETCS variant including the onboard use of ETCS Level NTC, ETCS Level 2 and below" (PDF). Letter to Paul Simmons...
27 KB (2,364 words) - 23:02, 5 January 2025
Guitars, Cadillacs, Etc., Etc. is the debut studio album by American country music artist Dwight Yoakam. This was Yoakam's first time working with long-time...
18 KB (2,207 words) - 20:47, 28 June 2024
arithmetic computation (+, −, ×, etc.) may be performed on nominal measures. The nominal level is the lowest measurement level used from a statistical point...
38 KB (4,671 words) - 03:57, 30 December 2024
(Katoomba, Springwood, etc.). As of 3 April 2023, there are 408 county-level cities in total: A sub-prefectural city is a county-level city with powers approaching...
50 KB (357 words) - 00:04, 30 August 2024
for operating on ETCS, TBL or ZBS lines. This is foremost a software update but the cab signals are not showing the full range of ETCS signals in a Berlin...
9 KB (1,206 words) - 21:58, 6 January 2024
of sea tide etc., are not included. Places where seawater and rainwater is pumped away are included. Fully natural places below sea level require a dry...
16 KB (471 words) - 06:06, 19 December 2024
homologation in Poland at 250 km/h (155 mph) using ETCS Level 2 was impossible, since ETCS Level 2 was not operational anywhere in Poland, and the Central...
24 KB (2,330 words) - 14:22, 6 September 2024
flight levels are assigned, independent of the direction of flight: Eastbound – Magnetic track 000 to 179° – odd flight levels (FL 290, 330, 370, etc.) Westbound...
26 KB (2,391 words) - 20:38, 21 December 2024
use was due to difficulties in the implementation of the safety system ETCS level 2, specifically, finding trains with ERTMS fitted. Together with the HSL...
7 KB (641 words) - 16:44, 22 October 2024
institutional investors had access, but online exchanges opened some ETC markets to almost anyone. ETCs were introduced partly in response to the tight supply of...
59 KB (6,186 words) - 19:57, 9 September 2024
A level crossing is an intersection where a railway line crosses a road, path, or (in rare situations) airport runway, at the same level, as opposed to...
33 KB (3,096 words) - 13:51, 30 December 2024
national train protection system to ETCS. The following automatic train protection systems are based on Eurobalises: ETCS – the European-wide train protection...
25 KB (3,288 words) - 06:46, 20 November 2024
Multi-level marketing (MLM), also called network marketing or pyramid selling, is a controversial and sometimes illegal marketing strategy for the sale...
49 KB (5,208 words) - 03:13, 27 December 2024
Mean sea level (MSL, often shortened to sea level) is an average surface level of one or more among Earth's coastal bodies of water from which heights...
21 KB (3,887 words) - 21:10, 1 January 2025
International, 23 Dec 2013, 'First ETCS Certified in Poland,' http://www.railwaygazette.com/news/infrastructure/single-view/view/first-etcs-certified-in-poland.html...
31 KB (3,292 words) - 00:58, 3 January 2025
Control System (ETCS) as well as the Indian Anti-Collision Device (ACD); however, it is considerably more cost-effective in comparison to ETCS. Furthermore...
47 KB (4,335 words) - 16:30, 22 December 2024
In computer storage, the standard RAID levels comprise a basic set of RAID ("redundant array of independent disks" or "redundant array of inexpensive disks")...
39 KB (4,548 words) - 06:56, 30 December 2024