Çayırhan power station is a 620 MW operational coal fired power station in Turkey in Ankara Province.[1] In 2019 land was expropriated for another lignite mine, to feed the a proposed extension, which was opposed as uneconomic and eventually had its licence revoked.[2][3]
History
[edit]In 2017 the government privatized the Çayırhan-B lignite coalfield on condition a coal-fired power plant is built, in the hope that it would be the first of a wave of similar deals for various lignite coalfields around the country.[4]
Ownership
[edit]The project was a joint venture between Kolin, Kalyon and Çelikler.[5] But in 2020 the licence expired and as of 2024 it belongs to EÜAŞ with a different licence number.[6]
Finance
[edit]An extension was proposed at an estimated cost of $1.1-billion but was not done.[5]
Subsidies
[edit]The government is giving a 15-year purchase guarantee.[5]
Economics
[edit]The winning consortium bid $60.4 per megawatt, but according to opponents of the extension expanding Turkey's solar power would save taxpayers money in the long term.[2]
Employment
[edit]The company said it would employ 500 people in the plant and 1,500 for coal mining.[5]
Coal supply
[edit]As Turkish lignite is heavy compared to its energy content coal must be sourced locally. According to one source Çayırhan is a longwall mine (therefore underground),[7] but Global Energy Monitor says it is opencast. Coalfields in Ankara province include Beypazarı-Çayırhan, Gölbaşı-Karagedik, Gölbaşı-Bahçeköy, Ayaş-Kayıbucak and Şereflikoçhisar.[4]
Environmental Impact
[edit]Despite the environmental impact assessment having been approved opponents of the extension claim the environment will be damaged.
Dust
[edit]As of 2020[update] the plant is operating with inadequate dust filters[8] and Turkey has no legal limit on ambient fine particules (PM2.5). Opponents claim that Nallıhan bird sanctuary, 6 km away, could be damaged.[2]
Sulfur Dioxide
[edit]As of 2020[update] the plant is operating with inadequate sulfur treatment,[9][8] and the area is a sulfur dioxide air pollution hotspot[10]
Nitrogen oxides
[edit]As of 2020[update] the plant is operating without sufficient NOx filtering.[8]
Greenhouse gases
[edit]After extension the power station would contribute an estimated 4 megatonnes (Mt) a year to Turkey's greenhouse gas emissions.[2] As Turkey has no carbon emission trading it would not be economically viable to capture and store the gas.[11]
Opposition
[edit]The Chamber of Mechanical Engineers has questioned why the existing plant was granted a 2020 operating license without meeting air pollution standards.[8] Opponents include Ankara 350.org and singer Tarkan.[2]
In 2022 the NGO Climate Change, Policy, and Research Association alleged that the power station did not comply with flue gas regulations, was burning coal from a mine which did not have a permit, and risked collapsing.[12]: 30 [13][14]
See also
[edit]References
[edit]- ^ "EMBA Electricity Production Co. Inc". EMBA Elektrik Üretim A.Ş. Retrieved 8 May 2019.
- ^ a b c d e "Çevrecilerin karşı çıktığı proje için 'acele kamulaştırma' kararı". Gazete Duvar. 16 April 2019.
- ^ Birliği -, Ekoloji (2021-03-15). "13 termik santral ve HES projesinin enerji üretim lisansı iptal edilip sonlandırıldı". Ekoloji Birliği (in Turkish). Retrieved 2023-04-06.
- ^ a b "Ankara". Coal in Turkey. Retrieved 14 May 2019.
- ^ a b c d "$1.1 billion investment planned in coal plant". Daily Sabah. 7 February 2017.
- ^ "Bakan Bayraktar açıkladı! Yerli kömür üretiminde hedef 6 milyon ton" (in Turkish). 2024-03-20. Retrieved 2024-03-29.
- ^ "Coal production in Turkey and major projects". Mining Technology. 2023-04-06. Retrieved 2023-09-09.
- ^ a b c d "MMO Başkanı, Termik Santraller İle İlgili Bir Basın Açıklaması Yaptı". Enerji Portalı (in Turkish). 24 January 2020.
- ^ "Baskı sonuç verdi: Filtresiz termik santrallere izin çıkmadı | DW | 15.02.2019". DW.COM (in Turkish). Retrieved 2019-09-04.
- ^ "Global SO2 emission hotspot database" (PDF). Greenpeace. August 2019.
- ^ Esmaeili, Danial (June 2018). Carbon Capture, Utilization and Storage in the Context of Turkish Energy Market (PDF). Sabancı University.
- ^ Boom and Bust Coal 2023 (Report). Global Energy Monitor. 2023-04-05.
- ^ "İklim Değişikliği Politika ve Araştırma Derneği". iklimdernegi.org. Retrieved 2023-04-06.
- ^ "İklim Değişikliği Politika ve Araştırma Derneği". iklimdernegi.org. Retrieved 2023-04-06.