561 Züm Queen West
561 | ||
---|---|---|
Overview | ||
System | Züm | |
Vehicle | New Flyer Xcelsior | |
Route | ||
Locale | 1 Queen | |
Communities served | Brampton | |
Start | Mount Pleasant GO Station | |
Via | Mississauga Road and Queen Street | |
End | Downtown Brampton Terminal | |
Length | 6 miles (9.7 km) | |
Service | ||
Frequency | 15–20 minutes | |
Operates | Monday-Friday | |
|
561 Züm Queen West is an express bus route in Brampton, Ontario that was introduced on September 6, 2016 as part of Züm phase 2. It runs from Mount Pleasant GO Station where it connects with 505 Züm Bovaird and continues west along Bovaird Drive, south along Mississauga Road, and east along Queen Street to Downtown Brampton Terminal. The route currently operates only on weekdays during rush hours.The 1 Queen shares the entire length with this route and operates 30 minutes or better all day, every day.
The 561 was suspended due to the COVID-19 pandemic in the Regional Municipality of Peel. As of September 6, 2022, Route 561 has been restored to service.
Stops
[edit]Name | Local Parallel Routes | Major Connections |
---|---|---|
Mount Pleasant GO Station | 1 Queen | 505 Züm Bovaird, GO Transit |
Bovaird | ||
Williams | ||
Mississauga | 1 Queen, 60 Mississauga Road | |
Creditview | 1 Queen | |
James Potter | ||
Chinguacousy | 1 Queen, 55 Elbern Markell | |
McLaughlin | 1/1A Queen, 57 Charolais | |
McMurchy | 1/1A Queen | |
Downtown Brampton Terminal | 501 Züm Queen, 502 Züm Main, GO Transit |
Controversy
[edit]At that time when this route was implemented, several widening projects including Queen Street west of Chinguacousy, Mississauga Road north of Williams Parkway, and Bovaird Drive west of Mount Pleasant GO station were still ongoing and was not finished until November 2017. As a result, some of the Züm stations including Bovaird, Creditview, and James Potter were still unopened and was not expected to open until the widening project is complete because the road's width did not reach the Züm stations. Instead, temporary bus stops were placed nearby disabled Züm stations along the route. Also, heavy traffic and construction activities could result in bus delays along the route.
References
[edit]This article needs additional citations for verification. (September 2016) |