Bellandur metro station

Bellandur
Namma Metro station
Under Construction of this metro station as of April 2024 under Phase 2A of Blue Line of Namma Metro
General information
LocationBellandur Gate Rd, near Ecospace, Adarsh Palm Retreat, Bellandur, Bengaluru, Karnataka 560103
Coordinates12°55′41″N 77°40′51″E / 12.92799°N 77.68077°E / 12.92799; 77.68077
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeBLDR (TBC)
History
OpeningJune 2026; 18 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Ibbaluru Blue Line
(Future Service)
Kadubeesanahalli
Location
Map

Bellandur is an important upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station serves mainly the Bellandur suburban area, which comprises Bellandur Lake in addition to many technology firms such as Intel, RMZ Ecoworld and Embassy TechVillage. This metro station is slated to become operational around June 2026.[2][3][4][5]

History

[edit]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Bellandur metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

[edit]

Station Layout - To Be Confirmed

Bellandur track layout (TBC)
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Central Silk Board
Next Station: Ibbalur
Platform #
Northbound
Towards ← Krishnarajapura / KIAL Terminals
Next Station: Kadubeesanahalli
Side platform | Doors will open on the left Disabled access
L2

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. ^ "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.
[edit]