Bicutan Automated Guideway Transit System
This article needs to be updated.(February 2019) |
This article relies largely or entirely on a single source. (September 2015) |
Bicutan Automated Guideway Transit System | |
---|---|
Overview | |
Status | Under construction |
Locale | Taguig, Metro Manila, Philippines |
Service | |
Type | Automated Guideway Transit (AGT) |
Services | Taguig C-6 (planned) |
Technical | |
Track length | 372 m (1,220 ft)[1] (test track) 6.9 km (4.3 mi) (planned) |
Number of tracks | 1 |
Operating speed | 50–60 km/h (31–37 mph) (planned) |
Highest elevation | 10 m (33 ft) |
The Bicutan AGT is an automated guideway transit (AGT) system under development as of 2024[update] within the City of Taguig in the Philippines. It will serve as test track for the second mass transit system to be built and developed in the country by local engineers.[2]
Despite some media reports calling it a monorail, the system uses two parallel concrete beams to form a track.
See also
[edit]References
[edit]- ^ Tamayo, Rodnel. "Automated Guideway Transit (AGT) System" (PDF). Electronic Freedom of Information. Metals Industry Research and Development Center. Retrieved June 8, 2019.
- ^ Regidor, Anna Kristine. "UPD monorail project begins". 2011-07-27. University of the Philippines Diliman. Archived from the original on September 24, 2014. Retrieved November 8, 2012.