Eryaman YHT railway station

Eryaman YHT
TCDD Taşımacılık high-speed rail station
The Başkentray platform, with the YHT platform on the right.
General information
Locationİstasyon Cd. Etiler Mah. 06796
Etimesgut, Ankara
Turkey
Coordinates39°57′20″N 32°37′49″E / 39.9556°N 32.6304°E / 39.9556; 32.6304
Owned byTurkish State Railways
Operated byTCDD Taşımacılık
Line(s)
Platforms3 (2 island platforms, 1 side platform)
Tracks6
ConnectionsLocal Transit EGO Bus: 507, 507.2, 510-3, 511, 511-3, 512-3, 513-2, 523, 524
Construction
ParkingYes
AccessibleYes
Architectural styleModernism
History
Opened15 March 2018
Services
Preceding station TCDD Taşımacılık Following station
Polatlı YHT Yüksek Hızlı Tren Ankara
Terminus
Polatlı YHT
towards Karaman
Elvankent
towards Sincan
Başkentray Özgüneş
towards Kayaş
Future service
Polatlı YHT
towards Alsancak
Yüksek Hızlı Tren Ankara
Terminus

Eryaman YHT railway station (Turkish: Eryaman YHT garı), previously known as Ankara West YHT railway station (Turkish: Ankara Batı YHT garı), is a railway station in Ankara, Turkey. Once Başkentray commuter rail service begins in April, the station will become a transfer point between YHT high-speed trains and local commuter trains, replacing Sincan station.[1] Eryaman station also replaced Emirler station, located about 175 m (574 ft) east of the station, which was demolished in July 2016.[2]

Eryaman YHT station consists of two island platforms serving four tracks, with two more tracks for bypassing trains. A large station building houses a waiting lounge, cafes and ticket offices. Next to the station is the Etimesgut Yard, opened in February 2016, which is a large maintenance facility and train yard for YHT train-sets.[1]

Station Layout

[edit]
Street Station house Entrances/Exits
Tracks
Track 1 Başkentray toward Sincan
Island platform (Platform 1), doors will open on the left Disabled access
Track 2 Başkentray toward Kayaş
Track 3 Yüksek Hızlı Tren toward Halkalı or Karaman, does not stop here
Track 4 Yüksek Hızlı Tren toward Halkalı or Karaman
Island platform (Platform 2), doors will open on the left Disabled access
Track 5 Yüksek Hızlı Tren toward Ankara
Track 6 Yüksek Hızlı Tren toward Ankara, does not stop here

References

[edit]
  1. ^ a b "Ankara YHT Gar Kompleksi 2016'da tamamlanacak". rayhaber.com (in Turkish). 7 February 2015. Retrieved 31 October 2017.
  2. ^ "Başkentray Yıl Sonu Hizmete Girecek". rayhaber.com (in Turkish). 23 June 2016. Retrieved 31 October 2017.