Huddersfield Narrow Canal

Huddersfield Narrow Canal
Lock 1E - Start of the Huddersfield Narrow Canal
Map
Specifications
Locks74
StatusOpen
Navigation authorityCanal & River Trust
History
Principal engineerBenjamin Outram
Date of act1793
Date completed1811
Date closed1944
Date restored1981 (locks 22W and 23W, Uppermill)
1987 (Marsden to Slaithwaite)
2001 (Full restoration)
Huddersfield
Narrow Canal
Aspley Basin
 A629  Wakefield Road
Huddersfield Broad Canal
Lock 1E – Start of HNC
University footbridge
Commercial Street
Former Lock 2E
Bates Tunnel East Portal/
Queen Street South Bridge
Bates Tunnel West Portal
Lock 2E
 A616  Chapel Hill
Former Lock 3E (Original)
Lock 3E
Former Lock 3E (2001)
 A62  Manchester Street
Lock 4E
Penistone Line
Lock 5E
Birkhouse Lane
Stoney Battery Road
Lock 6E
Lock 7E
Footbridge
Factory Lane
Lock 8E
Lock 9E
Whiteley Street
Lock 10E
Lock 11E
Morley Lane
Lock 12E
River Colne
(Golcar Aqueduct)
Holme Mills Bridge
Ramsden Mill Lane
Lowestwood Lane
Lock 17E
Lock 18E
Lock 19E
Lees Mill Lane
Lock 20E
Former Lock 21E
Platt Lane
Lock 21E
Lock 22E
Britannia Road
Slaithwaite Market Place
Nr Old Bank
Footbridge
Lock 23E
Nr Howgate Road
Waring Bridge
Lock 28E
West Slaithwaite Road
Lock 29E
Lock 30E
Kettle Lane
Lock 31E
Booth Winding Hole
Lock 32E
Footbridge
Lock 33E (Sparth Reservoir)
Lock 34E
Footbridge
Warehouse Hill Road
Marsden railway station
Lock 42E (Top Lock)
Station Road
Dirker Drive
Huddersfield line
Tunnel End
Standedge Tunnel
East Portal – Marsden
Standedge Tunnel
West Portal – Diggle
Lock 32W (Top Lock)
Lock 31W
Ward Lane
Diggle flight (30W–24W)
 A670  Wool Road
 A6052  Dobcross New Road
Huddersfield Line
Moorgate Street
 A670  High Street
Nr Halls Way
 A669  Chew Valley Road
Nr Shaw Hall Bank Road
Shaw Hall Close
 B6175  Shaw Hall Bank Road
High Grove Lane
Park Cottages
Nr Hollins Crescent
River Tame
Calf Lane
 A635  Manchester Road
Dark Lane
Waggon Road
Egmont Street
Lock 12W
Scout Tunnel
Lock 11W
Spring Bank Lane
Lock 8W
Pylon passage
Lock 7W
 A6018  Stamford Street
Corn Mill Lane
Tesco footbridge
Tesco road bridge
Former Lock 6W
Lock 6W
Armentieres Square
Melbourne Street
Service road
Lock 5W
Lock 4W
 B6175  Caroline Street
Bayley Street
Peel Street
River Tame
 B6431  Clarence Street
Locks 3W–1W
 B6170  Whitelands Road
Whitelands Basin
Ashton Canal

The Huddersfield Narrow Canal is an inland waterway in northern England. It runs just under 20 miles (32 km) from Lock 1E at the rear of the University of Huddersfield campus, near Aspley Basin in Huddersfield, to the junction with the Ashton Canal at Whitelands Basin in Ashton-under-Lyne. It crosses the Pennines by means of 74 locks and the Standedge Tunnel.

Building the canal

[edit]

Planning

[edit]

The canal was first proposed in 1793 at a meeting in the George Hotel, Huddersfield. Its engineer was Benjamin Outram on the recommendation of William Jessop.[1] His plan was to start from the Huddersfield Broad Canal and follow the River Colne with a climb of 438 feet (134 m) to its summit where it would pass through a tunnel at Standedge before descending through Saddleworth and the Tame valley to the Ashton Canal near Ashton-under-Lyne. There were many woollen, worsted and cotton mills along its route which promised ample trade. However, there was the possible problem of the loss of their water supplies and so Outram proposed to build a number of reservoirs.

Construction

[edit]
Huddersfield to Ashton-under-Lyne Canal Act 1794
Act of Parliament
Long titleAn Act for making and maintaining a navigable canal, from and out of the canal of Sir John Ramsden, baronet, at or near the town of Huddersfield, in the west riding of the county of York, to join and communicate with the canal navigation from Manchester to or near Ashton under Line and Oldham, at or near the town of Ashton under Line aforesaid, in the county palatine of Lancaster.
Citation34 Geo. 3. c. 53
Dates
Royal assent4 April 1794

The canal was authorised by the Huddersfield to Ashton-under-Lyne Canal Act 1794 (34 Geo. 3. c. 53). Construction began that same year with the marking out of the route. The practice was to set up a line of pegs or stakes about 50 yards (46 m) apart so that their tops would indicate the intended water level. It would then be possible to construct the appropriate embankments and cuttings.

As engineer, Outram provided an oversight of the work but he was also occupied by other projects. Day-to-day management was carried out by contractors employed and organised by the canal company committee. Progress was slow and erratic. It was also unfortunate that Outram was seriously ill for long periods between 1795 and 1797. The company was also short of money, partly because the costs had been seriously underestimated but also because shareholders were not honouring their pledges.

In 1799, severe floods damaged earthworks along the canal and various reservoirs. In particular, overflow of the Tunnelend Reservoir devastated the village of Marsden. Two aqueducts were also destroyed, diverting the company's already-stretched funds. The Stakes Aqueduct was already in use and had to be replaced immediately. Outram had built it of stone and, due to its low height, it had needed to be constructed in four short spans. The narrow openings had impeded the unprecedented overflow and Outram replaced it with a single span cast iron structure, similar to the Holmes Aqueduct on the Derby Canal.

Outram's Stakes aqueduct at Stalybridge

Outram set out to overcome the problems with the Holmes Aqueduct by making the walls thicker where they joined the baseplates which were also thicker. However a major stress was the compressive force along the top of the wall plates where they bow outwards or inwards. In 1875 cross bracings were added to reinforce it. The Stakes Aqueduct is the oldest surviving aqueduct of its type that is still in use for its original purpose.

The Standedge Tunnel

[edit]
Eastern portal

Although the canal uses 74 locks to climb and descend the Pennines, there would have had to be many more without the digging of a very long tunnel through the Tame/Colne watershed (the River Colne flowing down to Huddersfield and the River Calder, and the Tame flowing down to Stockport and the River Mersey). The canal tunnel is 5,700 yards (5,200 m) long, making it the longest canal tunnel in the United Kingdom. It is largely brick lined but in some places the tunnel has been left with a natural rock surface.

The "Black Flood"

[edit]

In 1810, the Diggle Moss Reservoir gave way and Marsden was again flooded along with much of the Colne Valley. Houses and factories were wrecked and five people lost their lives. The force of the water was such that a fifteen-ton rock was carried two miles (3.2 km) down the valley.

Completion

[edit]

Despite multiple problems, the building of the Huddersfield Narrow Canal showed that the technique of quantity surveying had advanced greatly. Thomas Telford's report during the construction of the Standedge Tunnel covered every expenditure to the last bucket; it was followed to the letter and the canal finally opened in 1811.

Operation

[edit]
Share of the operator Huddersfield Canal Company, issued 1. March 1805

The canal operated for approximately 140 years. Although it was moderately successful for a while, its width (limited to boats less than 7 ft (2.1 m) wide), the large number of locks and the long Standedge Tunnel made it much less profitable than its main rival the Rochdale Canal which had a similar number of locks but was twice as wide with no long tunnel.

Standedge Tunnel proved to be a bottleneck having been constructed without a towpath. Narrowboats had to be 'legged' through, eventually by professionally employed leggers. A company employee would chain the tunnel entrance behind a convoy of boats and walk over Boat Lane, accompanied by boat boys and girls leading the boat horses, to unchain the opposite end of the tunnel before the boat convoy arrived. This journey was made at least twice per day for over twenty years.

The construction of a double railway tunnel parallel to Standedge canal tunnel adversely affected canal revenues and the canal was mostly abandoned in 1944 (a short stretch in Huddersfield survived until closure in 1963).

Restoration

[edit]

After 27 years of campaigning and restoration by the Huddersfield Canal Society, the canal was fully re-opened to navigation in 2001 when it again became one of three Pennine crossings, the others being the Rochdale and the Leeds and Liverpool (both broad canals). The canal is now entirely used by leisure boaters.

During the period of time when the canal was closed, several lengths were culverted and infilled and in some cases built over. Over the course of the restoration project, the vast majority of the obliterated line became available to be opened out again and the canal remains on a substantially identical alignment with some minor alterations.

Huddersfield

[edit]

The Huddersfield Narrow Canal connects with the Huddersfield Broad Canal at the eastern end of Lock 1E. Lock 1E is to the west of the A629 Wakefield Road and the canal had been filled in beneath the road. A new bridge was built in 1985 but the width was only sufficient for narrowboats and so the 300 yards (270 m) section of broad canal from the bridge to Lock 1E is not accessible to vessels wider than seven feet (2.1 m). The bridge thus forms the effective, but unofficial, boundary between the Huddersfield Narrow Canal and the Huddersfield Broad Canal.

Due to a legal quirk, the stretch of the canal from Lock 1E to Queen Street South Bridge was not included in the original abandonment of the canal. Whilst locks on the remainder of the canal were capped, cascaded or demolished, locks 1E and 2E remained gated but eventually fell into dereliction. The old gates were only removed when canal restoration work started.

Two factories, Bates and Sellers Engineering, had been built immediately upstream of locks 2E and 3E respectively on the line of the canal and blocking it. In each case, the solution was the same: the lock was relocated upstream of the factory and a tunnel constructed below the factory. This avoided disruption to the firms using the sites. The remodelling of the canal can be clearly seen between the former site of Lock 2E and Queen Street South Bridge where a framework of girders sits above the channel to ensure that the deep piling remains secure.

Eleven years later, Sellers Engineering relocated to a new site. This enabled Lock 3E to be relocated again, this time to a site near the original Lock 3E. The stretch of canal previously in a tunnel under the factory was brought back to the surface and become a feature of the Huddersfield Waterfront development.[2]

Slaithwaite

[edit]

The section of canal through Slaithwaite town centre, between locks 21E and 23E, had been culverted and a car park covered part of the route.

Restoration caused some local controversy as it involved the felling of a row of mature cherry trees which had been planted along the infilled line although the local authority claimed that the trees were in poor condition and were unlikely to last for many more years in any case.[citation needed]

Lock 21E was relocated a short distance upstream, to the other side of Platt Lane, in order to ensure that the Platt Lane crossing could be achieved by a conventional bridge instead of the swing bridge that had existed prior to closure.

The stretch from 22E to 23E threads its way through an extremely tight space. Britannia Road Bridge was formerly hump backed but changes in traffic levels since closure rendered such a bridge impractical and instead the pound from 22E to 23E was lowered by 12 inches (300 mm).

Hartshead Power Station

[edit]
Electricity Pylon straddling the canal at Stalybridge

On the western side of the Pennines, the canal runs through the legs of an electricity pylon at Heyrod, near Stalybridge.

The pylon had been erected during the period when the canal was closed and the only viable route for restoration was through the legs.

No other such cases are known on navigable waterways worldwide although other pylons have been constructed across former waterways that have been filled in with rubble and soil such as the Manchester, Bolton and Bury Canal and Wey and Arun Canal at Rowner Lock.

The canal today

[edit]

The canal is part of the South Pennine Ring crossing the Pennines twice – the other crossing is the Rochdale Canal. The canals are linked at the western (Lancashire) end by the Ashton Canal and at the eastern (Yorkshire) end by the Huddersfield Broad Canal and a length of the Calder and Hebble Navigation.

This takes in Huddersfield, Golcar, Slaithwaite, Marsden, Saddleworth, Diggle, Uppermill, Greenfield, Mossley, Stalybridge, Ashton-under-Lyne, Manchester at its central Cheshire Ring (New Islington) and Etihad stadium (Bradford/Eastlands) districts, Failsworth, Rochdale, Littleborough, Todmorden, Hebden Bridge, Sowerby Bridge, Elland and Brighouse.

The Huddersfield Canal area is also a Site of Special Scientific Interest.

See also

[edit]

References

[edit]
  1. ^ Skempton, A W (2002). A biographical dictionary of civil engineers in Great Britain and Ireland (1 ed.). London: Thomas Telford, on behalf of the Institution of Civil Engineers. p. 495. ISBN 072772939X.
  2. ^ "Huddersfield Waterfront - Huddersfield Narrow Canal". Retrieved 9 February 2017.
[edit]

53°32′15″N 2°00′26″W / 53.53750°N 2.00722°W / 53.53750; -2.00722