Old Colony Lines

Old Colony Lines
An outbound Middleborough/Lakeville train arriving at Holbrook/Randolph in 2017
Overview
OwnerMassachusetts Bay Transportation Authority
LocaleSoutheastern Massachusetts
Termini
Stations4 (mainline)
6 (Middleborough/Lakeville)
7 (Kingston/Plymouth)
Service
TypeCommuter rail
SystemMBTA Commuter Rail
Train number(s)2–65 (weekday)
1002-1057 (Saturday)
2002-2057 (Sunday)
Operator(s)Keolis North America
Daily ridershipOctober 2022:[1]
Kingston: 4,171
Middleborough/Lakeville: 5,261
History
Opened1997 (reopened)
ClosedPrevious NYNH&H service ended on June 30, 1959
Technical
Line lengthMiddleborough/Lakeville: 35.6 miles (57.3 km)
Kingston/Plymouth: 35.1 miles (56.5 km)[2]
Track gauge4 ft 8+12 in (1,435 mm)
Route map

0.0 mi
0 km
South Station
Silver Line (MBTA) Red Line (MBTA) MBTA Commuter Rail Amtrak
MBTA Commuter Rail lines via Back Bay
Broadway
Andrew
2.3 mi
3.7 km
JFK/UMass
Red Line (MBTA)
Savin Hill
North Quincy
Wollaston
7.9 mi
12.7 km
Quincy Center
Red Line (MBTA)
Quincy Adams
10.9 mi
17.5 km
Braintree
Kingston
15.8 mi
25.4 km
South Weymouth
19.4 mi
31.2 km
Abington
21.2 mi
34.1 km
Whitman
24.4 mi
39.3 km
Hanson
28.1 mi
45.2 km
Halifax
35.1 mi
56.5 km
Kingston
35.6 mi
57.3 km
Plymouth
temporarily
closed 2021
Middleborough/Lakeville
15.0 mi
24.1 km
Holbrook/​Randolph
18.6 mi
29.9 km
Montello
20.0 mi
32.2 km
Brockton
21.9 mi
35.2 km
Campello
27.7 mi
44.6 km
Bridgewater
34.5 mi
55.5 km
Pilgrim Junction
35.6 mi
57.3 km
Middleborough/​Lakeville

The Old Colony Lines are a pair of branches of the MBTA Commuter Rail system, connecting downtown Boston, Massachusetts with the South Shore and cranberry-farming country to the south and southeast. The two branches operate concurrently for 10 miles (16 km) via the Old Colony Mainline from South Station to Braintree station. The Middleborough/Lakeville Line then winds south through Holbrook, Brockton, Bridgewater, Middleborough, and Lakeville via the Middleborough Main Line and Cape Main Line. The Kingston Line heads southeast to serve Weymouth, Abington, Whitman, Hanson, Halifax, and Kingston by way of the Plymouth branch. Limited service to Plymouth was provided prior to April 2021 but was cut due to low ridership and budget constraints.[3][4] The Greenbush Line, which was also part of the Old Colony Division, was reactivated in 2007 as a separate project.

History

[edit]
The Old Colony system in 1893

The Old Colony under the New Haven

[edit]

Historically, train service extended beyond the current terminus of the three branches. Greenbush service continued on a now-abandoned right-of-way to Kingston, where it joined the Plymouth line. The Plymouth line extended into downtown Plymouth, and a branch connected to Middleborough through Carver. Trains continued southeast from Middleboro to four different termini on Cape Cod: Woods Hole, Hyannis, Chatham, and Provincetown. Another major branch continued southwest to New Bedford, and another to Newport via Fall River. A number of minor branches also extended off the main lines. These included branches to Hull, East Bridgewater, West Bridgewater, North Hanover, and Fairhaven. None of these branches are currently operational.

Passenger service along the Old Colony Railroad was discontinued in 1959. Despite high ridership, this line had been a source of problems for the New Haven Railroad, which leased the system. In 1935, the bankrupt New Haven attempted to default on its lease and return ownership of the line to the Old Colony stockholders; however, this drove the Old Colony, which had not run trains in over thirty years, to bankruptcy in one day, and the New Haven was forced to run the trains by court order, with a provision that, if losses exceeded a certain amount, they could abandon the line. The Old Colony Division enjoyed a brief renaissance in the early 1950s under the pro-commuter term of President Frederick C. Dumaine, Jr.; however, this was not to last. The New Haven's accountants used somewhat dubious practices to shift a greater amount of debt to the Old Colony Division, and the railroad announced that all passenger service would end in 1958. An emergency subsidy was approved by the Commonwealth of Massachusetts for another year, and service finally ended in 1959 with the opening of the Southeast Expressway, which runs alongside the Old Colony right-of-way in many sections. The approaches to the bridge over the Neponset River burned soon afterwards, making any restoration of service significantly more difficult.

Restoration of service

[edit]
A train at South Weymouth station on the Plymouth/Kingston Line in 2013

As congestion and pollution became issues on the expressway, projects were undertaken to revive service on these railways. In 1971, the South Shore branch of the Red Line opened to Quincy Center, and, in 1980, it was extended to Braintree. The line, with state-of-the-art park-and-ride stations, proved an instant success, lending strength to proposals to restore commuter rail service to the Old Colony lines via Braintree. The Cape Cod and Hyannis Railroad ran passenger service from Cape Cod to Braintree (and briefly to Attleboro) in the 1980s, but failed when its state subsidy was ended amid budget cuts.

Freight service continued on the Cape Main Line through Brockton and Middleborough and the Old Colony mainline to Plymouth even after passenger service ended, so the lines were not abandoned when restoration planning began around 1990. Both lines received a full restoration for 59 miles per hour (95 km/h) passenger service, including passing sidings and fully handicapped accessible stations with full-length high-level platforms. Tracks were laid parallel to the Red Line along the original right-of-way, including a new two-track bridge over the Neponset River. The first trains ran on September 26, 1997, with full rush hour service on the 29th.[3] The third leg of the project, the Greenbush Line, was planned to reopen at the same time. Due to public opposition, the Greenbush Line did not open until 2007.[3]

Weekend service and tie replacement

[edit]
Plymouth station, was only served by off-peak weekday and weekend trains until its 2021 closure

Weekend and off-peak service on the Old Colony Lines (including the first service to Plymouth, which is not served during rush hours) began as planned on November 29, 1997, two months after rush hour service began. Greenbush service included weekend and off-peak service from the beginning of operations.[3]

In May 2010, the MBTA announced a plan to temporarily stop all weekend service and to replace non-peak weekday service with buses. The shutdowns were for the purposes of replacing defective concrete ties (which had begun failing far earlier than expected) with wooden ones.[5] Tie replacement started in March 2011 and was substantially complete by September, although the full project – which includes grade crossing and bridge work – was expected to take until the summer of 2012.[6] The project was fully completed by May 26, 2012.

On March 28, 2012, the MBTA announced that Plymouth/Kingston Line service would no longer operate on weekends, as with the Needham Line and Greenbush Line. The move came as a part of fare increases and service cuts in order to close the agency's operating budget shortfall for the following year. Weekend service was eliminated beginning July 7, 2012; weekend service was kept for the first week of the new fiscal year to allow for service on the July 4th holiday. Middleborough/Lakeville service continued to operate on weekends.[3] In fiscal year 2013, the Middleborough/Lakeville line averaged 7,182 and the Kingston/Plymouth Line 6,560 one-way riders per weekday, for a combined daily ridership of 13,742 – a substantial decrease from daily averages exceeding 19,000 several years before.[2]

In early 2014, local and state officials began agitating for the return of weekend service on the Plymouth/Kingston Line.[7][8] Weekend service on the Plymouth/Kingston Line, as well as weekend service on the Greenbush Line and Saturday service on the Needham Line, resumed on December 27, 2014.[9] Prior to the return of weekend service on the Kingston/Plymouth Line, the MBTA held special weekend service to Plymouth for two weekends leading up to the 2014 Thanksgiving holiday. The two trains per day were intended only for tourists going to Plymouth; they did not run on schedules allowing day trips to Boston.[10]

COVID-19 pandemic

[edit]

Substantially reduced schedules were in effect from March 16 to June 23, 2020.[3] Schedule changes effective November 2, 2020, added midday service with consistent 60–70 minute midday headways on the Middleborough/Lakeville Line, though a pilot of late-night service was discontinued.[11]

The fork at the end of the Kingston/Plymouth Line (which lacks a wye) creates operational issues – a single train cannot serve both terminal stations efficiently. The MBTA had intended to address this issue with schedule changes since 2015.[12] In November 2020, as part of service cuts during the pandemic, the MBTA proposed to close Plymouth along with five other low-ridership stations on other lines.[13] On December 14, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing Plymouth and four of the other five stations.[14][15] That day, temporary reduced schedules were again put into place.[16]

On January 23, 2021, reduced schedules went into place with no weekend service on seven lines, including the Kingston/Plymouth Line.[3] Plymouth station closed on April 5, 2021, with the line renamed the Kingston Line.[17][18] As part of that schedule change, the regional rail-style service introduced in November 2020 was resumed on the Middleborough/Lakeville Line and added on the Kingston Line.[19] Additionally, the last Kingston-bound train of the night departs from Braintree station, with a timed transfer from a Middleborough/Lakeville Line train.[18] Weekend service on the Kingston line and the six other lines resumed on July 3, 2021.[20] In June 2021, the MBTA indicated that Plymouth station would reopen on July 5, 2022 (the start of a new fiscal year).[21] The station did not reopen at that time, however, with a date for service restoration not announced.[22]

As of February 2022, the Kingston Line has 13 weekday round trips and eight on weekends, while the Middleborough/Lakeville Line has 15 weekday round trips and 10 on weekends.[23] By October 2022, Kingston service was at 69% of pre-COVID ridership, with Middleborough/Lakeville service at 77%.[1]

Cape Cod service

[edit]
The CapeFLYER runs over the Middleborough/Lakeville Line on its way to Hyannis station (pictured) on summer weekends

Original plans for the reopening of the Middleborough/Lakeville Line in the 1990s called for service to Wareham or beyond; however, plans were scaled back, and, when the line reopened in 1997, service was restored only to Middleborough/Lakeville.[citation needed] In 2007, the Boston Region Metropolitan Planning Organization released a report evaluating the possibility of extending regular full-year commuter rail service to Buzzards Bay (on the north side of the Cape Cod Canal opposite Bourne), including several intermediate stops.[24] However, other projects (such as the restoration of service on the Greenbush Line) received priority, and the extension to Buzzards Bay was not constructed.

The CapeFLYER service to Hyannis on Cape Cod via the Middleborough/Lakeville Line began in May 2013. The service is operated by the Cape Cod Regional Transit Authority (CCRTA), in collaboration with the MBTA and the Massachusetts Department of Transportation (MassDOT); it uses standard MBTA commuter equipment. The CapeFLYER is the first regular passenger service to Cape Cod from Boston since the 1960s.[3]

Buzzards Bay station, a possible future terminus of the Middleborough/Lakeville Line

The relative success of the CapeFLYER has brought new attention to the possibility of extending the Middleborough/Lakeville Line to Buzzards Bay. The possibility was seriously discussed before the end of its first summer season.[25] In September 2013, the Wareham Chamber of Commerce announced that, based on the success of the CapeFLYER, the Chamber supported the extension of commuter rail service to Buzzards Bay.[26] The Buzzards Bay town selectmen similarly supported the idea later that year, and a public forum was held in January 2014.[27][28]

Bourne's Transportation Advisory Committee began studying the possibility in mid-2014, with the addition of work by MassDOT's Central Transportation Planning Staff (CTPS) in November 2014.[29] A Local Impact Report released in April 2015 proposed an 800 foot (240 m) high-level platform and two parking alternatives: a 120-space modification of the existing lot, or a 400-to-600-space structure (including a realignment of Academy Drive). The CTPS data estimated ridership at 875 daily riders if all Middleborough trains were extended to Buzzards Bay, or slightly fewer with a limited number of trains.[29]

Bourne voted to join the MBTA district in 2015 and began paying an assessment in mid 2016 (for FY 2017), although there was no guarantee that commuter rail service would be provided in the fiscally constrained environment.[30] For FY 2017, Bourne paid $41,707 to the MBTA (plus an existing $88,429 to the CCRTA for existing bus service).[31] MassDOT began planning a possible commuter rail trial service in October 2015. In February 2016, state representatives and CCRTA administrator Thomas Cahir said that the state wished to begin trial service during FY 2017—possibly by the end of 2016.[31] While such trial service was ultimately not implemented, the MBTA began conducting a study in late 2020 to evaluate the feasibility of implementing Buzzards Bay commuter rail service in conjunction with the currently-underway South Coast Rail project.[32][33]

South Coast Rail

[edit]
Middleborough station will open in conjunction with South Coast Rail project, and will replace Middleborough/Lakeville station on all commuter service.

The first phase of the South Coast Rail project, expected to open in 2025, will be an extension of the Middleborough/Lakeville Line.[34] The existing Middleborough/Lakeville station will be replaced by Middleborough station for commuter service, though it will continue to be served by the CapeFlyer. The proposed Phase 2 of South Coast Rail, planned to open in 2030, would be routed via Stoughton rather than Middleborough.

Station list

[edit]

Main Line

[edit]
Fare zone Location Mile (km) Station Connections and notes
1A Boston 0.0 (0.0) Disabled access South Station Amtrak Amtrak: Acela, Lake Shore Limited, Northeast Regional

MBTA Commuter Rail: Fairmount, Framingham/Worcester, Franklin/Foxboro, Greenbush, Needham, and Providence/Stoughton lines; CapeFlyer (seasonal) MBTA subway: Red Line; Silver Line (SL1, SL2, SL3, SL4)

Bus transport MBTA bus: 4, 7, 11 Bus transport Intercity buses at South Station Bus Terminal

2.3 (3.7) Disabled access JFK/UMass MBTA Commuter Rail: Greenbush Line

MBTA subway: Red Line Bus transport MBTA bus: 8, 16, 41

Bus transport UMass Shuttle Route 1

Bus transport LMA Shuttle

1 Quincy 7.9 (12.7) Disabled access Quincy Center MBTA Commuter Rail: Greenbush Line

MBTA subway: Red Line Bus transport MBTA bus: 210, 211, 215, 216, 217, 220, 222, 225, 230, 236, 238, 245

2 Braintree 10.9 (17.5) Disabled access Braintree MBTA Commuter Rail: CapeFlyer (seasonal)

MBTA subway: Red Line Bus transport MBTA bus: 226, 230, 236

Kingston Line

[edit]
Fare zone Location Mile (km)[2] Station Connections and notes
3 Weymouth 15.8 (25.4) Disabled access South Weymouth
4 Abington 19.4 (31.2) Disabled access Abington BAT: Rockland Flex
5 Whitman 21.2 (34.1) Disabled access Whitman
6 Hanson 24.4 (39.3) Disabled access Hanson
7 Halifax 28.1 (45.2) Disabled access Halifax
8 Kingston 35.1 (56.5) Disabled access Kingston Bus transport GATRA: Freedom Link, Liberty Link, SAIL
Plymouth 35.6 (57.3) Disabled access Plymouth Closed indefinitely[21]

Middleborough/Lakeville Line

[edit]
Fare zone Location Mile (km)[2] Station Connections and notes
3 Randolph 15.0 (24.1) Disabled access Holbrook/​Randolph Bus transport MBTA bus: 238, 240
4 Brockton 18.6 (29.9) Disabled access Montello Bus transport MBTA bus: 230
Bus transport BAT: 10/11
20.0 (32.2) Disabled access Brockton MBTA Commuter Rail: CapeFlyer (seasonal)
Bus transport BAT: 1, 2, 3, 4, 5, 6, 8, 9, 10/11, 12, 13, 14, BSU 28
5 21.9 (35.2) Disabled access Campello Bus transport BAT: 8, 12
6 Bridgewater 27.7 (44.6) Disabled access Bridgewater
8 Lakeville 35.6 (57.3) Disabled access Middleborough/​Lakeville MBTA Commuter Rail: CapeFlyer (seasonal)
Bus transport GATRA: Downtown Middleborough Shuttle, Link 4

References

[edit]
  1. ^ a b Poftak, Steve (October 27, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. p. 6.
  2. ^ a b c d "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  3. ^ a b c d e f g h Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  4. ^ Smith, David R. (July 13, 2022). "MBTA commuter rail is not coming back to Plymouth. Here's what we know". Retrieved July 20, 2022.
  5. ^ "MBTA Old Colony tie project will require weekend shutdowns". Trains Magazine. 4 May 2010. Retrieved 4 May 2010.[permanent dead link]
  6. ^ "Old Colony Commuter Rail Tie Replacement Project". Massachusetts Bay Transportation Authority. Archived from the original on 2011-09-19. Retrieved 27 September 2011.
  7. ^ Barnes, Jennette (9 April 2014). "Revival of train service sought". Boston Globe. Retrieved 5 October 2014.
  8. ^ Trufant, Jessica (24 June 2014). "Push for restored weekend rail service continues". Patriot Ledger. Retrieved 5 October 2014.
  9. ^ "Commuter Rail: Weekend Service Returning on 3 Lines" (Press release). Massachusetts Department of Transportation. October 7, 2014. Archived from the original on October 13, 2014. Retrieved October 7, 2014.
  10. ^ "Take the Special Seasonal Weekend Train to Plymouth!" (PDF). Massachusetts Bay Transportation Authority. November 2014.
  11. ^ DiAdamo, Rob (September 14, 2020). "Fall 2020 Commuter Rail Schedule Changes" (PDF). Massachusetts Bay Transportation Authority.
  12. ^ Dungca, Nicole (October 4, 2015). "Rail trip from Kingston shows MBTA's 'scheduling anomalies'". Boston Globe. Retrieved October 5, 2015.
  13. ^ Paget-Seekins, Laurel; Benesh, Kat (November 9, 2020). "Forging Ahead: Scenario and Service Planning" (PDF). Massachusetts Bay Transportation Authority. p. 21.
  14. ^ Enwemeka, Zeninjor (December 14, 2020). "MBTA Control Board Votes To Scale Back Bus, Train And Ferry Service". WBUR. Retrieved February 5, 2021.
  15. ^ Paget-Seekins, Laurel; Benesh, Kat (December 14, 2020). "Forging Ahead: Service Proposal" (PDF). Massachusetts Bay Transportation Authority. p. 17.
  16. ^ "Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021.
  17. ^ "Spring 2021 Service Changes". Massachusetts Bay Transportation Authority. February 2021. Archived from the original on February 23, 2021.
  18. ^ a b "Kingston Line Spring 2021 Schedule, Effective April 5th, 2021" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021.
  19. ^ "Reminder: Spring 2021 Commuter Rail Schedules Take Effect April 5" (Press release). Keolis Commuter Services. April 1, 2021. Archived from the original on June 3, 2021. Retrieved June 3, 2021.
  20. ^ Coholan, Ryan (May 24, 2021). "Commuter Rail Performance Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  21. ^ a b Kindy, Dave (June 18, 2021). "North Plymouth train station scheduled to reopen in 2022". Wicked Local.
  22. ^ Smith, David R. (July 13, 2022). "MBTA commuter rail is not coming back to Plymouth. Here's what we know". Retrieved July 20, 2022.
  23. ^ Belcher, Jonathan (January–February 2022). "MBTA Vehicle Inventory as of February 28, 2022". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 17.
  24. ^ Humphrey, Thomas J. (January 2007). "Buzzards Bay Commuter Rail Extension Feasibility Study" (PDF). Boston Region Metropolitan Planning Organization. Archived from the original (PDF) on 2016-03-03. Retrieved 2016-02-26 – via United States Department of Transportation National Transportation Library.
  25. ^ Kinsella, James (16 August 2013). "Cape Commuter Rail Is A Real Possibility". Cape News. Archived from the original on 19 August 2013. Retrieved 18 August 2013.
  26. ^ "Chamber: Bring on commuter rail to Wareham, Buzzards Bay". Wicked Local Wareham. 25 September 2013. Retrieved 17 March 2014.
  27. ^ "Commuter rail return to Buzzards Bay: viable, or romantic notion?". Wicked Local Buzzards Bay. 16 December 2013. Retrieved 17 March 2014.[permanent dead link]
  28. ^ Rausch, Michael J. (27 January 2014). "Pros And Cons of Bourne Commuter Rail Discussed At Forum". Cape News. Archived from the original on 17 March 2014. Retrieved 17 March 2014.
  29. ^ a b "Buzzards Bay Commuter Rail Extension Local Impact Report" (PDF). Cape Cod Commission. April 2015. Archived from the original (PDF) on 5 March 2016. Retrieved 26 February 2016.
  30. ^ Vaccaro, Adam (15 February 2016). "This Cape Cod town is paying for rail service that doesn't exist". Boston Globe. Retrieved 21 February 2016.
  31. ^ a b Rausch, Michael J. (26 February 2016). "Details Expected Soon About Buzzards Bay Commuter Trains". Cape News. Retrieved 26 February 2016.
  32. ^ Grady Culhane (3 December 2020). "Study Investigates Possible Cape Cod Commuter Rail Service". CapeCod.com. Retrieved 15 December 2020.
  33. ^ Ethan Genter (1 December 2020). "New study renews hope for Cape commuter rail service". Cape Cod Times. Retrieved 15 December 2020.
  34. ^ Medeiros, Dan (June 13, 2024). "'MBTA owes this region an apology': South Coast Rail start is delayed another year". The Herald News. Archived from the original on June 14, 2024.
[edit]
KML is from Wikidata