List of Dhaka Metro Rail stations
The Dhaka Metro Rail is a mass rapid transit system serving Dhaka, the capital city of Bangladesh. It is owned and operated by the Dhaka Mass Transit Company Limited.[1] Together with a proposed subway system it is expected to reduce traffic congestion in the city. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority.[2]
The network is planned to contain six lines, with the first section of MRT Line 6 commencing commercial operations on 29 December 2022, and the other lines being either in planning or under construction.[3][4] The construction of MRT Line 6's second section is scheduled to be completed during 2023.[5] The third phase, which will have an interchange with Line 1, Line 2 and Line 4, is set to be completed by 2026.[6][7][8] Further expansion of MRT Line 6 is planned, with the hope of extending it towards Tongi in Gazipur metropolitan and Savar Upazila. The fares range from minimum ৳20 to maximum ৳100 (for MRT line 6). Passengers can get 10% discount for paying fares on either MRT pass or Rapid Pass. Each of the cards has same facilities.[9]
Lines
[edit]Line(s) | Number of Stations | Planned Stations | Structure | Opening date |
---|---|---|---|---|
1 | 0 | 21 | 12 underground 9 elevated | Planned |
2 | 0 | 25 | Unknown | Planned |
4 | 0 | 8 | Unknown | Planned |
5 | 0 | 29 | Under Ground and Elevated | Unknown |
6 | 16 | 17 | Elevated | 2022 |
Total: | N/A | N/A |
Operational stations
[edit]† | Terminal station |
* | Transfer station |
†† | Transfer station to Airport / Bangladesh Railway / Dhaka BRT |
The list gives only operational stations, alphabetically-
Code | Station Name | Line | Opened | Layout | Platform Layout | Notes | Refs | |
---|---|---|---|---|---|---|---|---|
English | Bengali | |||||||
G9 | Agargaon | আগারগাঁও | MRT Line 6 | 29 December 2022 | Elevated | Island | – | [10] |
G15 | Bangladesh Secretariat | বাংলাদেশ সচিবালয় | MRT Line 6 | 5 December 2023 | Elevated | Island | – | [11] |
G10 | Bijoy Sarani | বিজয় সরণি | MRT Line 6 | 13 December 2023 | Elevated | Side | – | [12] |
G14 | Dhaka University | ঢাকা বিশ্ববিদ্যালয় | MRT Line 6 | 13 December 2023 | Elevated | Side | – | [13] |
G11 | Farmgate | ফার্মগেট | MRT Line 6 | 5 December 2023 | Elevated | Island | – | [14] |
G12 | Karwan Bazar * | কারওয়ান বাজার | MRT Line 6 | 31 December 2023 | Elevated | Island | – | [15] |
G7 | Kazipara | কাজীপাড়া | MRT Line 6 | 15 March 2023 | Elevated | Side | – | [16] |
G6 | Mirpur 10 * | মিরপুর ১০ | MRT Line 6 | 1 March 2023 | Elevated | Side | – | [17] |
G5 | Mirpur 11 | মিরপুর ১১ | MRT Line 6 | 15 March 2023 | Elevated | Side | – | [18] |
G16 | Motijheel | মতিঝিল | MRT Line 6 | 5 December 2023 | Elevated | Side | – | [19] |
G4 | Pallabi | পল্লবী | MRT Line 6 | 25 January 2023 | Elevated | Side | – | [20] |
G13 | Shahbagh | শাহবাগ | MRT Line 6 | 31 December 2023 | Elevated | Island | – | [21] |
G8 | Shewrapara | শেওড়াপাড়া | MRT Line 6 | 31 March 2023 | Elevated | Side | – | [22] |
G2 | Uttara Center | উত্তরা সেন্টার | MRT Line 6 | 18 February 2023 | Elevated | Side | – | [23] |
G1 | Uttara North † | উত্তরা উত্তর | MRT Line 6 | 29 December 2022 | Elevated | Side | – | |
G3 | Uttara South | উত্তরা দক্ষিণ | MRT Line 6 | 31 March 2023 | Elevated | Side | – |
Proposed and under-construction stations
[edit]MRT Line 1
[edit]Station Name | Status | Layout | Notes | Refs | |
---|---|---|---|---|---|
English | Bengali | ||||
Aftabnagar * | আফতাবনগর | Under construction | Underground | Part of the Airport route | |
Airport | বিমানবন্দর | Under construction | Underground | Part of the Airport route | |
Airport Terminal 3 | বিমানবন্দর টার্মিনাল ৩ | Under construction | Underground | Part of the Airport route | |
Badda | বাড্ডা | Under construction | Underground | Part of the Airport route | |
Boalia | বোয়ালিয়া | Under construction | Elevated | Part of the Purbachal route | |
Joar Sahara | জোয়ার সাহারা | Under construction | Elevated | Part of the Purbachal route | |
Kamalapur * | কমলাপুর | Under construction | Elevated | Part of the Airport route | |
Khilkhet | খিলক্ষেত | Under construction | Underground | Part of the Airport route | |
Malibagh | মালিবাগ | Under construction | Underground | Part of the Airport route | |
Mostul | মস্তুল | Under construction | Elevated | Part of the Purbachal route | |
Nadda | নদ্দা | Under construction | Underground | Part of the Airport and Purbachal routes | |
North Badda | উত্তর বাড্ডা | Under construction | Underground | Part of the Airport and Purbachal routes | |
Notun Bazar * | নতুন বাজার | Under construction | Underground | Part of the Airport route | |
Purbachal Central | পূর্বাচল মধ্য | Under construction | Elevated | Part of the Purbachal route | |
Purbachal East | পূর্বাচল পূর্ব | Under construction | Elevated | Part of the Purbachal route | |
Purbachal Terminal | পূর্বাচল টার্মিনাল | Under construction | Elevated | Part of the Purbachal route | |
Purbachal West | পূর্বাচল পশ্চিম | Under construction | Elevated | Part of the Purbachal route | |
Rajarbagh | রাজারবাগ | Under construction | Underground | Part of the Airport route | |
Rampura | রামপুরা | Under construction | Underground | Part of the Airport route |
MRT Line 2
[edit]Station Name | Status | Layout | Notes | Refs | |
---|---|---|---|---|---|
English | Bengali | ||||
Azimpur | আজিমপুর | Planned | – | Part of the main line | |
Bhuighar | ভুইঘর | Planned | – | Part of the main line | |
Dakshingaon | দক্ষিণগাঁও | Planned | – | Part of the main line | |
Dhaka Medical College | ঢাকা মেডিকেল কলেজ | Planned | – | Part of the main line | |
Dhaka Uddyan | ঢাকা উদ্যান | Planned | – | Part of the main line | |
Dhamripara | ধামড়িপাড়া | Planned | – | Part of the main line | |
Gabtoli * | গাবতলী | Planned | – | Part of the main line | |
Golap Shah Mazar | গোলাপ শাহ মাজার | Planned | – | Part of the branch line | |
Gulistan | গুলিস্তান | Planned | – | Part of the main and branch lines | |
Jalkury | জালকুড়ি | Planned | – | Part of the main line | |
Jhigatola | ঝিগাতলা | Planned | – | Part of the main line | |
Kamalapur * | কমলাপুর | Planned | – | Part of the main line | |
Manda | মান্ডা | Planned | – | Part of the main line | |
Mohammadpur | মোহাম্মদপুর | Planned | – | Part of the main line | |
Motijheel * | মতিঝিল | Planned | – | Part of the main line | |
Narayanganj | নারায়ণগঞ্জ | Planned | – | Part of the main line | |
Nayabazar | নয়াবাজার | Planned | – | Part of the branch line | |
New Market | নিউ মার্কেট | Planned | – | Part of the main line | |
Palashi | পলাশী | Planned | – | Part of the main line | |
Sadarghat | সদরঘাট | Planned | – | Part of the branch line | |
Science Lab | সায়েন্স ল্যাব | Planned | – | Part of the main line | |
Signboard * | সাইনবোর্ড | Planned | – | Part of the main line |
MRT Line 4
[edit]Station Name | Status | Layout | Notes | Refs | |
---|---|---|---|---|---|
English | Bengali | ||||
Chittagong Road | চট্টগ্রাম রোড | Planned | – | – | |
Jatrabari | যাত্রাবাড়ী | Planned | – | – | |
Kamalapur * | কমলাপুর | Planned | – | – | |
Kanchpur | কাঁচপুর | Planned | – | – | |
Madanpur | মদনপুর | Planned | – | – | |
Sayedabad | সায়েদাবাদ | Planned | – | – | |
Signboard * | সাইনবোর্ড | Planned | – | – | |
Shonir Akhra | শনির আখড়া | Planned | – | – |
MRT Line 5
[edit]Station Name | Status | Layout | Notes | Refs | |
---|---|---|---|---|---|
English | Bengali | ||||
Aftabnagar | আফতাবনগর | Planned | Underground | Southern Route | |
Aftabnagar Centre | আফতাবনগর সেন্টার | Planned | Elevated | Southern Route | |
Aftabnagar East | আফতাবনগর পশ্চিম | Planned | Elevated | Southern Route | |
Amin Bazar | আমিনবাজার | Planned | Elevated | Northern Route | |
Asad Gate | আসাদ গেট | Planned | Underground | Southern Route | |
Baliarpur | বালিয়ারপুর | Planned | Elevated | Northern Route | |
Banani | বনানী | Planned | Underground | Northern Route | |
Bilamalia | বিলামালিয়া | Planned | Elevated | Northern Route | |
College Gate | কলেজ গেট | Planned | Underground | Southern Route | |
Darus Salam | দারুস সালাম | Planned | Underground | Northern Route | |
Dasherkandi | দাশেরকান্দি | Planned | Elevated | Southern Route | |
Gabtoli * | গাবতলী | Planned | Underground | Northern and Southern Route | |
Gulshan 2 | গুলশান ২ | Planned | Underground | Northern Route | |
Hatirjheel | হাতিরঝিল | Planned | Underground | Southern Route | |
Hemayetpur | হেমায়েতপুর | Planned | Elevated | Northern Route | |
Kallyanpur | কল্যাণপুর | Planned | Underground | Southern Route | |
Karwan Bazar * | কারওয়ান বাজার | Opened for MRT Line 6 | Underground | Southern Route | |
Kochukhet | কচুক্ষেত | Planned | Underground | Northern Route | |
Mirpur 1 | মিরপুর ১ | Planned | Underground | Northern Route | |
Mirpur 10 * | মিরপুর ১০ | Opened for MRT Line 6 | Underground | Northern Route | |
Mirpur 14 | মিরপুর ১৪ | Planned | Underground | Northern Route | |
Nasirabad | নাসিরাবাদ | Planned | Elevated | Southern Route | |
Notun Bazar * | নতুন বাজার | Planned | Underground | Northern Route | |
Russel Square | রাসেল স্কয়ার | Planned | Underground | Southern Route | |
Shyamoli | শ্যামলী | Planned | Underground | Southern Route | |
Technical | টেকনিক্যাল | Planned | Underground | Southern Route | |
Tejgaon | তেজগাঁও | Planned | Underground | Southern Route | |
Vatara | ভাটারা | Planned | Elevated | Northern Route |
MRT Line 6
[edit]Name | Status |
---|---|
Kamalapur | Under construction |
References
[edit]- ^ ঢাকা ম্যাস ট্রানজিট কোম্পানি লিমিটেড (ডিএমটিসিএল) (in Bengali). Archived from the original on 29 May 2023. Retrieved 12 July 2023.
- ^ "About MRT Line-6". Dhaka Mass Transit Company Ltd. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
- ^ "PM Hasina becomes first passenger to travel on Metro Rail with ticket". 28 December 2022.
- ^ "Passengers gather at Dhaka metro stations at first light". bdnews24.com. Retrieved 29 December 2022.
- ^ Datta Gupta, Titu (27 December 2022). "Metro magic is here, now". The Business Standard. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
- ^ "Metro Rail: Roll-out on Victory Day next year". The Daily Star. 13 December 2021. Retrieved 2 February 2023.
- ^ Hossein, Anwar. প্রযুক্তির চমক মেট্রোরেলে. Prothomalo (in Bengali). Retrieved 2 February 2023.
- ^ "Underground Metro: Tunnels to run as deep as 22 storeys". The Daily Star. 1 February 2023. Retrieved 2 February 2023.
- ^ "Metro rail commuters to get 10% discount by paying fares on smart cards". 8 September 2022. Archived from the original on 9 September 2022. Retrieved 12 July 2023.
- ^ মেট্রোরেলে চড়তে ভিড়, যাত্রীদের আনন্দ-উচ্ছ্বাস. Prothom Alo (in Bengali). 29 December 2022. Retrieved 29 December 2022.
- ^ "Metro rail is expected to trigger a paradigm shift in commute". The Financial Express. Retrieved 15 December 2023.
- ^ "Bijoy Sarani, Dhaka University metro rail stations open to commuters". bdnews24.com. Retrieved 15 December 2023.
- ^ "Bijoy Sarani, Dhaka University metro rail stations open to commuters". bdnews24.com. Retrieved 15 December 2023.
- ^ "Metro rail is expected to trigger a paradigm shift in commute". The Financial Express. Retrieved 15 December 2023.
- ^ "Metro Rail: Karwan Bazar, Shahbagh stations to open 31 Dec". Prothom Alo. 28 December 2023. Retrieved 28 December 2023.
- ^ "Metro rail: Kazipara and Mirpur 11 stations to open March 15". The Daily Star. 9 March 2023. Retrieved 11 March 2023.
- ^ মেট্রোরেলের পঞ্চম স্টেশনের দরজা খুলছে আজ. Prothom Alo (in Bengali). 1 March 2023. Retrieved 1 March 2023.
- ^ "Metro rail: Kazipara and Mirpur 11 stations to open March 15". The Daily Star. 9 March 2023. Retrieved 11 March 2023.
- ^ "Metro rail is expected to trigger a paradigm shift in commute". The Financial Express. Retrieved 15 December 2023.
- ^ চালু হলো পল্লবী স্টেশন, থামছে মেট্রোরেল. Bhorer Kagoj (in Bengali). 25 January 2023. Retrieved 25 January 2023.
- ^ "Metro Rail: Karwan Bazar, Shahbagh stations to open 31 Dec". Prothom Alo. 28 December 2023. Retrieved 28 December 2023.
- ^ খুলে গেলো মেট্রোর সব দ্বার. Jamuna Television (in Bengali). 31 March 2023. Retrieved 31 March 2023.
- ^ মেট্রোরেলের 'উত্তরা সেন্টার' স্টেশন খুললো. Bdnews24.com (in Bengali). 18 February 2023. Retrieved 18 February 2023.