Madras Atomic Power Station

Madras Atomic Power station
Map
CountryIndia
Coordinates12°33′27″N 80°10′30″E / 12.55750°N 80.17500°E / 12.55750; 80.17500
StatusOperational
Construction beganUnits 1 & 2: 1970 (1970)
PFBR: January 2004 (2004-01)
Commission dateUnits 1: 27 January 1984 (1984-01-27)
Units 2: 21 March 1986 (1986-03-21)
OwnersUnits 1 & 2: NPCIL
PFBR, FBR-1&2: BHAVINI
OperatorsUnits 1 & 2: NPCIL
PFBR, FBR-1&2: BHAVINI
Nuclear power station
Reactors2
Reactor typeUnits 1 & 2: IPHWR-220
PFBR: Prototype
FBR-1&2: FBR-600
Reactor supplierUnits 1 & 2: BARC/NPCIL
PFBR, FBR-1&2: IGCAR/BHAVINI
Cooling sourceBay of Bengal
Power generation
Units operational2 × 220 MW
Units planned2 × 600 MW
Units under const.1 × 500 MW
Nameplate capacity410 MW
Capacity factor44.21% (2020-21)[1]
Annual net output1703.92 GW.h (2020-21)[1]
External links
WebsiteNuclear power Corporation of India Ltd
CommonsRelated media on Commons

Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station, with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985, respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.

The facility is also home to India's first large scale fast breeder reactor of 500 MWe called the Prototype Fast Breeder Reactor operated by BHAVINI and will also be the site of first two FBR-600 commercial fast breeder reactors.[2]

History

[edit]

During its construction, a total of 3.8 lakh (380,000) railway sleeper (logs) were brought from all over India to lift the 180 ton critical equipment in the first unit, due to lack of proper infrastructure and handling equipment.[3]

As of July 2016 the Prototype Fast Breeder Reactor (PFBR) was in its final construction stage, and was expected to reach criticality in March 2017 with 500 MW of electricity production.[2][4] The following month the loading of the 1750 ton liquid sodium coolant were expected to happen in four to five months, with sources in the Department of Atomic Energy reporting that criticality would likely be reached only around May 2017.[5]

Reactors

[edit]

The facility houses two indigenously built Pressurised Heavy-Water Reactors (PHWRs), MAPS-1 and MAPS-2 designed to produce 235 MW of electricity each.[6] MAPS-1 was completed in 1981, but start-up was delayed due to a shortage of heavy water. After procuring the necessary heavy water, MAPS-1 went critical in 1983 and began operating at full power on 27 January 1984. MAPS-2 obtained criticality in 1985 and began full power operations on 21 March 1986.[6][7]

With India not being a signatory to the Treaty on the Non-Proliferation of Nuclear Weapons the reactors have since 1985 been delivering their spent fuel to the nuclear reprocessing plant at Tarapur, providing the country with unsafeguarded plutonium.[6]

A beachhead at Kalpakkam also hosts India's first indigenous Pressurised (light) water reactor (PWR). The 80 MW reactor was developed by Bhabha Atomic Research Centre (BARC) as the land-based prototype of the nuclear power unit for India's nuclear submarines.[8] This unit does not come under MAPS.

Units

[edit]
Phase Unit
No.
Reactor Status Capacity in MWe Construction start First criticality Grid Connection Commercial operation Closure Notes
Type Model Net Gross
I 1 PHWR IPHWR-220 Operation suspended (under maintenance) 202 220 1 January 1971 2 July 1983 23 July 1983 27 January 1984 [9][10]
2 PHWR IPHWR-220 Operational 202 220 1 October 1972 12 August 1985 20 September 1985 21 March 1986 [9]
II 3 FBR PFBR Completed 470 500 23 October 2004 [9]
III 4 FBR FBR-600 Planned 570 600 [9]
5 FBR FBR-600 Planned 570 600 [9]

Incidents

[edit]

The reactors' coolant pipes had been plagued by vibrations and cracking with substantial cracking in the reactor coolant system. This cracking has led to the discovery of Zircaloy pieces in a moderator pump, requiring the power generation to be lowered to 170 MW.[6]

On 26 March 1999 large amounts of heavy water spilled at MAPS-2, exposing seven technicians to heavy[quantify] doses of radiation.[6]

See also

[edit]

References

[edit]
  1. ^ a b "Monthly Genration Reports Actual for Apr – 2021 : Central Sector Nuclear" (PDF). National Power Portal. Central Electricity Authority. Retrieved 10 October 2021.
  2. ^ a b Chetal, SC (January 2013). "Beyond PFBR to FBR 1 and 2" (PDF). IGC Newsletter. 95. Indira Gandhi Centre for Atomic Research: 2. Retrieved 16 April 2021.
  3. ^ "MAPS Silver Jubilee Celebration". indiaenvironmentportal.org.in. India Environment Portal. Archived from the original on 18 December 2012.
  4. ^ Singh, Jitendra (28 July 2016). "Answer on 28.07.2016 to Rajya Sabha unstarred question no.1184 to Government of India Department of Atomic Energy" (PDF). dae.nic.in. Department of Atomic Energy, Government of India. Archived from the original (PDF) on 8 August 2016. Retrieved 8 August 2016. PFBR is poised for first criticality by March, 2017.
  5. ^ Rohit, T.K. (30 July 2016). "Prototype Fast Breeder Reactor likely to be delayed". The Hindu. Archived from the original on 30 July 2016. Retrieved 8 August 2016.
  6. ^ a b c d e "NTI: Country Overviews: India: Nuclear Facilities Madras Atomic Power Station (MAPS)". Nuclear Threat Initiative. September 2003. Archived from the original on 17 March 2004. Retrieved 18 February 2017.
  7. ^ Plants Under Operation - Nuclear Power Corporation of India Limited Archived 8 November 2014 at the Wayback Machine. Npcil.nic.in. Retrieved 2013-12-06.
  8. ^ "PWR building shows indigenous capability, says Kakodkar". The Hindu. Chennai, India. 3 August 2009.
  9. ^ a b c d e Hundred and sixty second report Public Accounts Committee (Eighth Lok Sabha) 1988–89 Madras Atomic Power Project, Department of Atomic Energy (PDF). Lok Sabha. 27 April 1989. p. 40. Retrieved 16 April 2021.
  10. ^ Subramanian, T.S (14 January 2024). "India will 'commission a nuclear power reactor every year': NPCIL chief". The Hindu.
[edit]