Pasir Ris Bus Interchange

1°37′35″N 104°35′0″E / 1.62639°N 104.58333°E / 1.62639; 104.58333

Pasir Ris Bus Interchange
巴西立巴士转换站
Pertukaran Bas Pasir Ris

Public Bus Interchange
Buses parked at Pasir Ris Bus Interchange, with Pasir Ris MRT station in the background
General information
Location501 Pasir Ris Drive 3, Singapore 519490
Owned byLand Transport Authority
Operated byGo-Ahead Singapore Pte Ltd (Go-Ahead Group plc)
Bus routes5 (SBS Transit Ltd)
11 (Go-Ahead Singapore Pte Ltd)
Bus stands8 (End-on)
3 (Boarding)
2 (Alighting)
Bus operatorsGo-Ahead Singapore Pte Ltd
SBS Transit Ltd
Connections EW1  CR5  CP1  Pasir Ris
Construction
Structure typeAt-grade
AccessibleAccessible alighting/boarding points
Accessible public toilets
Graduated kerb edges
Tactile guidance system
History
Opened10 December 1989; 35 years ago (1989-12-10)
3 July 2021; 3 years ago (2021-07-03) (Reconfigured)
Key dates
10 December 1989Commenced operations

Pasir Ris Bus Interchange is a bus interchange located at Pasir Ris in the eastern part of Singapore. It is located off Pasir Ris Drive 3,[1] adjacent to Pasir Ris MRT station and near White Sands Shopping Centre. This bus interchange also serves as a pick-up/drop-off point for shuttle buses ferrying NSFs heading to the SAF Ferry Terminal for their shuttle ferry to Pulau Tekong.

History

[edit]

The interchange was built at a cost of S$2.7 million[2] and opened on 10 December 1989, along with the Eunos Bus Interchange. The interchange provides bus connections around the Pasir Ris estate. Bus Service 403 was the first bus route in Pasir Ris from 1979, which previously terminated at Tampines Road terminus before being amended to the current route of looping at Pasir Ris Road.[1]

Bus contracting model

[edit]

Under the new bus contracting model, all the bus routes operating in the interchange were split into 5 route packages - Bus Service 5 under Bukit Merah, Bus Service 58 under Serangoon-Eunos, Bus Service 46 under Bedok, Bus Services 21 and 88 under Bishan-Toa Payoh and the rest under the Loyang Bus Package operated by Go-Ahead Singapore. Services under the Loyang Bus Package started operations on 18 September 2016.[3]

List of routes

[edit]
Operator Package Routes
Go-Ahead Singapore Loyang 3 (on-route), 6, 12, 12e, 15, 17, 68, 354, 358, 358T, 359, 359T, 403, 518, 518A
SBS Transit Bukit Merah 5
Bedok 46
Bishan-Toa Payoh 21, 88
Serangoon-Eunos 58

Redevelopment

[edit]

Redevelopment of Pasir Ris Bus Interchange has started since 2019. The bus interchange underwent a reconfiguration on 3 July 2021, after which the western half of the old bus interchange will be demolished to facilitate the construction of the Pasir Ris Integrated Transport Hub and Pasir Ris Rail Turnback, which will be completed by 2025, five years before the Cross Island MRT line starts operations.[4][5][6] The reconfigured interchange began operations on 3 July 2021 with inclusive facilities built as part of the relocation. The facility will remain in operation until 2025.[7]

References

[edit]
  1. ^ a b "Pasir Ris and Eunos interchanges to open on Sunday". The Straits Times. 7 December 1989. Retrieved 9 September 2017 – via NewspaperSG.
  2. ^ "Multi-ethnic styles". The New Paper. 24 December 1988. Retrieved 9 September 2017 – via NewspaperSG.
  3. ^ "Go-Ahead launches second tranche of bus services". TODAY. Retrieved 2022-03-30.
  4. ^ "HDB | Renewal Plans for Pasir Ris to Feature Refreshed Town Centre, Upgraded Parks, and New Housing by the Park". www.hdb.gov.sg. Retrieved 2022-03-30.
  5. ^ "Draft Master Plan 2013".
  6. ^ Auto, Hermes (2017-04-29). "Sun, sand, sea: Resort living in Pasir Ris under HDB rejuvenation plans | The Straits Times". www.straitstimes.com. Retrieved 2022-03-30.
  7. ^ Andres, Gabrielle (20 June 2021). "Reconfigured Pasir Ris Bus Interchange to start operations on Jul 3". CNA. Retrieved 20 June 2021.
[edit]