Sanyuanqiao station
General information | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Sanyuan Bridge Chaoyang District, Beijing China | |||||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited (Line 10) Beijing Capital Metro Corporation Limited (Capital Airport Express) | |||||||||||||||||
Line(s) | ||||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||||
Tracks | 4 | |||||||||||||||||
Construction | ||||||||||||||||||
Structure type | Underground | |||||||||||||||||
Accessible | Yes | |||||||||||||||||
History | ||||||||||||||||||
Opened | July 19, 2008 | |||||||||||||||||
Services | ||||||||||||||||||
| ||||||||||||||||||
|
Sanyuanqiao station[1] (simplified Chinese: 三元桥站; traditional Chinese: 三元橋站; pinyin: Sānyuánqiáo zhàn) is an interchange station between the Capital Airport Express and Line 10 of the Beijing Subway, located in the Sanyuan Bridge area in Chaoyang District of Beijing. It will be served by Line 12 in 2023.[2]
Station layout
[edit]Both the line 10 and Capital Airport Express stations use underground island platforms.
Fare areas
[edit]Due to a different ticketing system on the Capital Airport Express, the two fare areas are not connected. A transfer between Line 10 and the Capital Airport Express requires passengers to exit from one line and pay a separate fare for the other line.
Exits
[edit]There are 6 exits, lettered A, B, C1, C2, C3, and D. Exits B and D are accessible.
Ridership
[edit]It handled a peak entry and exit traffic of 110,000 people on May 5, 2013.[3]
Gallery
[edit]- Station decor
- Capital Airport Express platform (September 2017)
- Station entrance
- Capital Airport Express concourse
- Line 10 concourse before renovation (March 2021)
- Line 10 concourse after renovation (March 2023)
- Line 10 platform before renovation (September 2019)
References
[edit]- ^ a b "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31. Retrieved 2021-12-31.
- ^ "请问北京地铁12号线何时开通".
预计2023年年底具备开通条件,但若前期问题解决顺利还有可能提前
- ^ 北京地铁10号线"O"了 客流破170万. Sohu. Retrieved 2013-05-09.
39°57′41″N 116°27′25″E / 39.961508°N 116.456997°E