Sasang–Hadan Line

Sasang–Hadan Line
Overview
StatusUnder construction
LocaleBusan, South Korea
Termini
Stations6 (Phase 1), 13 (Phase 2)
Service
SystemBusan Metro
History
Planned opening2026
Technical
Line length6.9 km (4.3 mi)
CharacterUnderground automated light metro

Sasang–Hadan Line is a prospective light metro line in Busan, South Korea. The first phase will connect Sasang Station to Hadan Station. It is highly likely to open under the name "Line 5".

Infrastructure

[edit]

All stations will have elevators, escalators, and platform screen doors. The line will be equipped for unmanned automatic operation and will have a central control system for management of the entire line, eliminating the need for staff to be present at stations. Construction began in 2016 and is expected to be completed in 2026 with total operating expenses of 73.2 billion won.[1]

Stations

[edit]
Station
Number
Station name Transfer Distance
in km
Total
distance
Location
English Hangul Hanja
501 Sasang 사상 Busan–Gimhae Light Rail Transit - 0.0 Busan Sasang District
502 Saebyeok Market 새벽시장 晨昏市場
503 Sasang Smart City 사상스마트시티 思想스마트城市
504 Hakjang 학장 學長
505 Eomgung 엄궁 嚴宮 Saha District
506 Dong-a University 동아대학교 東亞大學 Saha District
507 Hadan 하단 6.90 Saha District

See also

[edit]

References

[edit]
  1. ^ "˝사상~하단선 3공구 재입찰˝ 부산교통공사의 형식적인 쇼". 국제신문.