Shuanghudadao station
Zhengzhou Metro rapid transit station | |||||||||||
General information | |||||||||||
Location | Longhu Town, Xinzheng, Zhengzhou China | ||||||||||
Coordinates | 34°36′46″N 113°40′37″E / 34.6127°N 113.6769°E | ||||||||||
Operated by | Zhengzhou Metro | ||||||||||
Line(s) | |||||||||||
Platforms | 2 | ||||||||||
Connections | |||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Other information | |||||||||||
Station code | 239 | ||||||||||
History | |||||||||||
Opened | 12 January 2017[1] | ||||||||||
Previous names | Houhu | ||||||||||
Services | |||||||||||
| |||||||||||
|
Shuanghudadao (Chinese: 双湖大道) is a metro station of Zhengzhou Metro Chengjiao line.
Station layout
[edit]The station is an elevated station with 3 levels. The ground level is for the entrances/exits and the 2nd level is for the station concourse and footbridges connecting Exit B. The 2 side platforms for Chengjiao line is on the 3rd level.
3F Platforms | Side platform, doors will open on the right | |
Platform 2 | ← Chengjiao line towards Liuzhuang (Shawoli) | |
Platform 1 | Chengjiao line towards Zhengzhou Hangkonggang Railway Station (Hua'nancheng West) → | |
Side platform, doors will open on the right | ||
2F | Concourse | Customer service, Vending machines |
G | Exits |
Exit | Destination | |
---|---|---|
Exit A | Longhu Avenue (east side), Shuanghu Avenue (north side) | |
Exit B1 | Longhu Avenue (west side) | |
Exit B2 | Longhu Avenue (west side), Shuanghu Avenue (north side) |
References
[edit]- ^ "郑州地铁1号线二期和城郊铁路一期将开通试运营". www.zhengzhou.gov.cn (in Chinese). Retrieved 2018-04-13.
- ^ "站点信息 双湖大道站". www.zzmetro.com (in Chinese). Retrieved 2018-04-24.