Solarpark Alt Daber
Solarpark Alt Daber | |
---|---|
Country | Germany |
Location | Wittstock, Brandenburg |
Coordinates | 53°12′N 12°31′E / 53.200°N 12.517°E |
Status | Operational |
Commission date | 3 December 2011 |
Construction cost | €100 million |
Solar farm | |
Type | Flat-panel PV |
Site area | 133 hectares (329 acres) |
Power generation | |
Units operational | 850,000 |
Nameplate capacity | 67.805 MW |
Annual net output | 71.4 GWh |
The Solarpark Alt Daber is a photovoltaic facility in Germany generating 67.8 megawatts (MW, 90,900 hp).[1] It was completed 3 December 2011, for a cost of €100 million,[2] and is expected to produce 71 GWh/year.[3] It is on a former military airport.
In 2014 a prototype of a battery storage system was added, mainly to provide frequency-response.[4]
See also
[edit]- Energy policy of the European Union
- Photovoltaics
- Renewable energy commercialization
- Renewable energy in the European Union
References
[edit]- ^ "Solar industry milestone: BELECTRIC becomes the world's first company to install 1 GW of PV generation capacity". SolarServer. 21 May 2012. Archived from the original on 12 August 2012.
- ^ "BELECTRIC once again leading the global EPC market for solar PV systems". SolarServer. 8 December 2011. Archived from the original on 11 August 2012.
- ^ "BELECTRIC weiht größtes Dünnschicht-Solarkraftwerk Deutschlands in Alt Daber ein; 71.000 Megawattstunden Solarstrom pro Jahr" Archived 2012-08-12 at the Wayback Machine (in German), Solarserver.de, 2012.
- ^ "Solarpark mit Speicher liefert regelbare Leistung". Erneuerbare Energien. Das Magazin (in German). 27 November 2014. Archived from the original on 15 January 2016. Retrieved 16 January 2016.
External links
[edit]- Project datasheet at the Wayback Machine (archived 2018-04-12) (in German)