Line 2 (Shanghai Metro)
Line 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | R2 (planned name); Changning line (Chinese: 长宁线) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | 上海地铁2号线 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Shanghai Rail Transit Changning Line Development Co., Ltd. (West of Longyang Road) Shanghai Rail Transit Line 2 East Extension Development Co., Ltd. (East of Longyang Road) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Pudong; Huangpu, Jing'an, Changning, Minhang, and Qingpu districts, Shanghai, China | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Shanghai Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Shanghai No.2 Metro Operation Co., Ltd. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Beidi Road Depot; Longyang Road Depot; Chuansha Depot | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 100 Class A 8 car trains | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 1.903 million (2019 Peak)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Commenced | December 28, 1995 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | June 11, 2000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Last extension | April 8, 2010 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 64 km (39.77 mi)[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground (National Exhibition and Convention Center - Yuandong Avenue, except Zhangjiang High Technology Park - Longyang Road) and elevated (Yuandong Avenue - Pudong Airport Terminal 1&2) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead lines (1500 volts) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (50 mph)[3] Average speed: 37.3 km/h (23 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | US&S United Signal AF900 (ATO/GOA2) and CASCO Tranavi (DTO/GOA3) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line 2 is an east–west line in the Shanghai Metro network. With a length of nearly 64 km (40 mi), it is the second longest line in the metro system after line 11. Line 2 runs from National Exhibition and Convention Center in the west to Pudong Airport Terminal 1&2 in the east, passing Hongqiao Airport, the Huangpu river, and the Lujiazui Financial District in Pudong. With a daily ridership of over 1.9 million, it is the busiest line on the Shanghai Metro.[4] The eastern portion of the line, Guanglan Road - Pudong International Airport section, was operated as an independent service route until April 19, 2019, when through service began. The line is colored light green on system maps.
History
[edit]The first section of line 2 was opened on October 28, 1999, from Zhongshan Park to Longyang Road. This section, which included 12 stations, totaled 16.3 kilometres (10.1 mi). A year later coinciding with the tenth anniversary of the development and opening up of Pudong, marking the official opening of the line, Zhangjiang High Technology Park was added to the eastern part of the line, adding 2.8 kilometres (1.7 mi).[5] Four new stations, located west of the Zhongshan Park station, opened in December 2006, extending the line to Songhong Road. This section added 6.15 kilometres (3.82 mi) to the line. Four years later, in preparation for the 2010 Shanghai World Expo, the line was significantly expanded. In February, the Zhangjiang High Technology Park station was rebuilt. In addition, another eastern segment took line 2 to Guanglan Road.[6][7][8] A month later, the line was extended westward to East Xujing, adding 8.0 kilometres (5.0 mi) to the line including a stop at Hongqiao Airport Terminal 2.[9] On April 8, an eastward extension added 8 stations to the line, totaling 26.6 kilometres (16.5 mi) and taking line 2 to Pudong International Airport.[10][11] On July 1, Hongqiao Railway Station opens to the public with the opening of the railway station of the same name.
In October 2006, it was decided to rename three stations on line 2 by the end of the year,[12][13] adopting a new naming scheme: metro stations, unlike bus stops, are no longer supposed to be named after neighbouring vertical streets, but famous streets and sights in the vicinity, making it easier for visitors to find these places. The renamed stations are Century Avenue (formerly Dongfang Road), East Nanjing Road (formerly Middle Henan Road) and West Nanjing Road (formerly Shimen No. 1 Road).
Shanghai Metro Line 2 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
Zhongshan Park — Longyang Road | 28 Dec 1995 | 20 Sep 1999 | 16.4 km (10.19 mi) | 12 | Initial phase | ¥12.4 billion[14] |
Longyang Road — Zhangjiang High Technology Park | 15 Jan 1999 | 26 Dec 2000 | 2.8 km (1.74 mi) | 1 | Initial phase (eastern section) | |
Songhong Road — Zhongshan Park | 15 Dec 2001 | 30 Dec 2006 | 6.8 km (4.23 mi) | 4 | First western extension | ¥3.46842 billion |
Zhangjiang High Technology Park — Guanglan Road | 30 Jun 2006 | 24 Feb 2010 | 3.4 km (2.11 mi) | 2 | Eastern extension (1st section) | See Eastern extension (2nd section) |
East Xujing — Songhong Road | 17 Jul 2008 | 16 Mar 2010 | 8.6 km (5.34 mi) | 2 | Second western extension | ¥2.5 billion |
Guanglan Road — Pudong International Airport | 18 Nov 2005 | 8 Apr 2010 | 26.8 km (16.65 mi) | 8 | Eastern extension (2nd section) | ¥11.032 billion[15] |
Hongqiao Railway Station | 4 Dec 2007 | 1 Jul 2010 | Infill station | 1 | Hongqiao Comprehensive Transportation Hub | See second western extension |
National Exhibition and Convention Center — Panxiang Road | 28 Jun 2021 | u/c | 1.64 km (1.02 mi) | 1 | Third western extension | ¥2.23 billion |
Up to April 19, 2019, when an eight-car train started serving the whole line 2 in a regular schedule,[16] the east section of line 2 was served by a four-car fleet. Line 2 had a piecewise service pattern during morning peak hours whereby the suburban segment between Guanglan Road station and Pudong International Airport station (Now Pudong Airport Terminal 1&2 station) is partially served by a four-car fleet in addition to the regular eight-car fleet serving the whole line. Already since 28 December 2018, during off-peak times, an eight-car fleet from National Exhibition and Convention Center station or Songhong Road station may terminate at Pudong Airport Terminal 1&2 station, but most trains still terminate at Guanglan Road station or Tangzhen (only during peak hours).
Stations
[edit]Service routes
[edit]Shanghai Metro Line 2 service routes | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
As of 2024:
| ||||||||||||
Routes | Station name | Connections | Distance | Location | Opening | Platform[17] | ||||||
M | P1 | P2 | E | English | Chinese | km | min | |||||
Panxiang Road | 蟠祥路 | 1.4 | Qingpu | u/c | ||||||||
● | ● | National Exhibition and Convention Center[iii] | 国家会展中心 | 17 [iv] | 0.00 | 0 | Qingpu | 16 March 2010[18] | Underground Island | |||
● | ● | ● | Hongqiao Railway Station | 虹桥火车站 | 10 17 AOH | 2.13 | 3 | Minhang | 1 July 2010[19] | Underground Two islands (shared 17 ) | ||
● | ● | ● | Hongqiao Airport Terminal 2 | 虹桥2号航站楼 | 10 [v] SHA | 0.51 | 2.64 | 5 | 16 March 2010[20] | Underground Two islands[vi] | ||
● | ● | ● | ◒ | Songhong Road | 淞虹路 | 5.69 | 8.33 | 12 | Changning | 30 Dec 2006[21] | Underground island | |
● | ● | ● | ↓ | Beixinjing | 北新泾 | 1.40 | 9.73 | 15 | ||||
● | ● | ● | ↓ | Weining Road | 威宁路 | 1.26 | 10.99 | 17 | ||||
● | ● | ● | ↓ | Loushanguan Road | 娄山关路 | 15 [vii] | 1.60 | 12.59 | 20 | |||
● | ● | ● | ◒ | Zhongshan Park | 中山公园 | 3 4 | 1.68 | 14.27 | 23 | 20 Sep 1999[22] | ||
● | ● | ● | ↓ | Jiangsu Road | 江苏路 | 11 | 1.43 | 15.70 | 26 | |||
● | ● | ● | ◒ | Jing'an Temple | 静安寺 | 7 14 Yan'an BRT | 1.13 | 16.83 | 29 | Jing'an | ||
● | ● | ● | ↓ | West Nanjing Road | 南京西路 | 12 13 [viii] | 1.82 | 18.65 | 31 | |||
● | ● | ● | ◒ | People's Square | 人民广场 | 1 8 | 1.21 | 19.86 | 34 | Huangpu | ||
● | ● | ● | ↓ | East Nanjing Road | 南京东路 | 10 | 1.14 | 21.00 | 36 | |||
● | ● | ● | ↓ | Lujiazui | 陆家嘴 | 14 | 1.86 | 22.86 | 39 | Pudong | ||
● | ● | ● | ↓ | South Pudong Road[ix] | 浦东南路 | 14 [x] | 1.30 | 24.16 | 42 | |||
● | ● | ● | ◒ | Century Avenue | 世纪大道 | 4 6 9 | 1.27 | 25.43 | 44 | |||
● | ● | ● | ↓ | Shanghai Science and Technology Museum | 上海科技馆 | 1.81 | 27.24 | 47 | ||||
● | ● | ● | ↓ | Century Park | 世纪公园 | 1.43 | 28.67 | 50 | ||||
● | ● | ● | ◒ | Longyang Road | 龙阳路 | 7 16 18 Maglev [xi] | 1.09 | 29.76 | 52 | |||
● | ● | ● | Zhangjiang High Technology Park | 张江高科 | 2.67 | 32.43 | 56 | 26 Dec 2000[xii] | ||||
● | ● | ● | Jinke Road | 金科路 | 1.64 | 34.07 | 58 | 24 Feb 2010[26] | ||||
● | ● | ● | Guanglan Road | 广兰路 | 1.95 | 36.02 | 62 | Underground Side & Island | ||||
● | Tangzhen | 唐镇 | 3.38 | 39.40 | 67 | 8 April 2010[27] | Underground island | |||||
● | Middle Chuangxin Road | 创新中路 | 1.76 | 41.16 | 70 | Underground Side platform | ||||||
● | East Huaxia Road | 华夏东路 | 2.13 | 43.29 | 73 | |||||||
● | Chuansha | 川沙 | 3.17 | 46.46 | 78 | |||||||
● | Lingkong Road | 凌空路 | 1.90 | 48.36 | 81 | |||||||
● | Yuandong Avenue | 远东大道 | 3.11 | 51.47 | 86 | Elevated island | ||||||
● | Haitiansan Road | 海天三路 | 5.91 | 57.38 | 93 | |||||||
● | Pudong Airport Terminal 1&2[xiii] | 浦东1号2号航站楼 | Maglev [xi] PVG | 2.33 | 59.71 | 96 | At-grade Side platform | |||||
| ||||||||||||
Important stations
[edit]East Xujing to West Nanjing Road
[edit]The line begins at East Xujing at the intersection of Xumin East Road and Zhuguang Road.[28][29] The line heads northeastward under Xumin East Road for about 0.8 kilometres (0.50 mi) before veering off the road and heading east, passing under Huaxiang Road. The line then enters the interchange station serving the Hongqiao Railway Station.[30] This station is an interchange with line 10. Shortly thereafter, the line enters the Hongqiao Airport Terminal 2.[31] line 2 then turns northward until it meets Tianshan Road and turns east again, roughly running parallel under Tianshan Road. Along this road, the line enters the Songhong Road,[32] Beixinjing,[33] and Weining Road stations.[34] At the Loushanguan Road, line 2 veers away from Tianshan Road, heading northeastward.[35] The line then enters the Zhongshan Park along Changning Road, an interchange with lines 3 and 4.[36][37] The subway line then runs parallel under Changning Road for a short distance before heading east under Yuyuan Road. Along Yuyuan Road, there is a station at Jiangsu Road, an interchange to line 11.[38][39] East of this station, the line swerves away from Yuyuan Road and runs under Yongyuan Road, which merges into West Nanjing Road, where line 2 enters the Jing'an Temple, an interchange to line 7.[40] Just before entering the West Nanjing Road, the metro line veers away from West Nanjing Road to Wujiang Road.[41] Line 2 comes back under the road shortly thereafter.
West Nanjing Road to Longyang Road
[edit]East of the West Nanjing Road, line 2 heads eastward along West Nanjing Road, passing under the South-North Elevated Road. It then turns northeast into the People's Square,[42] and interchange with lines 1 and 8. East of the People's Square station, the subway line moves under East Nanjing Road to the East Nanjing Road.[43] Leaving the Huangpu District of Shanghai, the line heads under the Huangpu River and enters the Pudong New Area of Shanghai. The metro line passes the Oriental Pearl TV Tower and the World Finance Center near its station at Lujiazui. The line then runs under Century Avenue and heads southeastward to the Dongchang Road. Line 2 then heads to the Century Avenue, the largest interchange station that serves lines 4, 6 and 9 as well. Line 2 continues southeastward along Century Avenue to the Shanghai Science and Technology Museum. From here, the line turns southward through Century Park to the Century Park. From here, the line turns southeast and then east as it enters the Longyang Road, an interchange with lines 7 and 16 as well as the Shanghai Maglev Train.
Longyang Road to Pudong International Airport
[edit]From the Longyang Road, the metro line heads eastward. Line 2 heads eastward, running under Zuchongzhi Road to the Zhangjiang High Technology Park station. The line heads northeastward under Zuchongzhi Road to the Jinke Road and Guanglan Road stations. Line 2 then veers away from Zuchongzhi Road and heads under the Waihuan Expressway to the Tangzhen and Middle Chuangxin Road stations, turning south. Heading southward, it heads through the East Huaxia Road and turns back east, running under Chuanhuan Road. Line 2 then passes through the Chuansha. Heading away from Chuanhuan Road, the metro line then enters the Lingkong Road and Yuandong Avenue stations along Huazhou Road before turning southeast. Line 2 then begins running parallel to the Shanghai Maglev Train as it runs under the Yingbin Expressway and enters the Haitiansan Road. From here, line 2 continues south to its terminus at the Pudong International Airport, which serves Shanghai Pudong International Airport.
Future expansion
[edit]East expansion
[edit]As part of the phase IV extension of Shanghai Pudong International Airport terminal T3 will be built south of the current terminals T1, T2 and satellite terminal. The terminal T3 will be served by extending line 2 south by one station.
West expansion
[edit]Construction started on a one station west extension from East Xujing to Panxiang Road[44] in June 2021.[45] The Panxiang Road station is south of the Panlong Road on line 17, these are separate stations and will not have an interchange. The extension of Metro line 2 to the west will improve the connection of the Hongqiao business hub to the city center and Pudong.
Station name change
[edit]- On 28 October 2006, Dongfang Road was renamed as the Century Avenue after station renovation for line 2 and the opening of line 4.
- October 2006, Middle Henan Road was renamed as the East Nanjing Road.
- On 21 September 2024,East Xujin was renamed as the National Exhibition and Convention Center,
South Pudong Road was renamed as the South Pudong Road, Pudong International Airport was renamed as the Pudong Airport Terminal 1&2
Headways
[edit]Shanghai Metro Line 2 headway[46] | ||||||
---|---|---|---|---|---|---|
Time | East Xujing - Songhong Road | Songhong Road - Guanglan Road | Guanglan Road - Pudong International Airport | |||
Monday - Thursday | ||||||
AM peak | 7:30–9:30 | About 4 min | About 2 min and 30 sec | About 4 min | ||
Off-peak | 9:30–17:00 | About 8 min | About 4 min | About 8 min | ||
PM peak | 17:00–20:30 | About 6 min | About 3 min | About 6 min | ||
Other hours |
| About 4 – 11 min | ||||
Friday | ||||||
AM peak | 7:30–9:30 | About 4 min | About 2 min and 30 sec | About 4 min | ||
Off-peak | 9:00–14:30 | About 8 min | About 4 min | About 8 min | ||
PM peak | 14:30–20:30 | About 6 min | About 3 min | About 6 min | ||
Other hours |
| About 5 – 11 min | ||||
Saturday and Sunday (Weekends) | ||||||
Peak | 8:30–20:30 | About 7 min and 20 sec | About 3 min and 40 sec | About 7 min and 20 sec | ||
Other hours |
| About 5 – 11 min | ||||
Extended operation (Friday and Saturday) | ||||||
After 23:00 | About 10 – 20 min | |||||
Technology
[edit]Power supply
[edit]Siemens Transportation Systems equipped this line with an overhead contact line (cantilever material: galvanized steel) and 7 DC traction power supply substations.[47]
Signaling
[edit]As the first part of Line 2 was opened 20 years ago and the line has been experiencing congestion after rapid ridership growth. In 2014, Shanghai Metro investigated upgrading the existing signal system of line 2 (US&S United Signal AF900, fixed block TBTC) to increase the frequency of trains and reduce congestion. In October 2020, a new CASCO Tranavi (moving block CBTC, DTO) signaling system was overlaid on the existing signaling system on Line 2. Therefore, line 2 will be the first in the world to have two signal systems, the new primary one for day-to-day operations and the existing older one serving as a backup system during signal faults.[48] Intervals of trains on Line 2 could be reduced to 90 seconds thanks to the new signal system with the backup system capable of maintaining two minute headways. For the new system, a total of 100 trains on Line 2 will have their onboard signal systems upgraded. As of 2020 upgrading work was finished on 31 trains (the new 02A05 trains).[49][50] The new signalling system was put into operation on January 27, 2024, which made it the longest signalling system renovation project in China. [51]
Rolling stock
[edit]When line 2 was opened to traffic, the AC02 trains were not delivered. Therefore, some of the DC01 and AC01 trains were borrowed from line 1.
All are 8-car Class A[i] rolling stock.
Shanghai Metro Line 2 rolling stock | |||||||||
---|---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly[ii] | Rolling stock | Number | Notes | |
128 | ADtranz[iii] and Siemens | 2000-2001 | A[i] | 8 | Tc+Mp+M+Mp+M+Mp+M+Tc | 02A01 | 201-216 (00071-00781, 01011-01241, 01262-01293, 01322-01353, 01382-01413, 01442-01473, 01502-01533, 01562-01593, 01622-01653 and 01682-01713) | Original name: AC02. In 2007, the six carriage 201-216 trainsets were expanded to eight carriage by using the middle carriages from 217-224. | |
168 | Even numbers: SATCO[iv] (and 0253) Odd numbers: CRRC Nanjing Puzhen Co., Ltd. | 2007-2009 | A[i] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 02A02 | 0233-0253 (021291-022961) | [52] Original name: AC08. | |
128 | SATCO[iv] (0262-0269) CRRC Nanjing Puzhen Co., Ltd. (0254-0261) | 2009-2010 | A[i] | 8 | Tc+Mp+M+Mp+M+Mp+Mp+Tc | 02A03 | 0254-0269 (022971-024241) | Original name: AC17a. Although the car has 4 pantographs, the sixth pantograph with carriage (Mp car) is generally not used. | |
128 | SATCO[iv] CRRC Nanjing Puzhen Co., Ltd. | 2009-2010 2018-2020 (expansion cars) | A[i] | 8 | Tc+Mp+M+Mp+M+Mp+Mp+Tc | 02A04 | 0270-0285 (024251-025522) | Formerly four car trainsets; 4 new carriages plugged in to form an eight car train. | |
248 | CRRC Zhuzhou Locomotive Co., Ltd. | 2017-2020 | A[i] | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 02A05 | 02086-02116 (025531-027931) | ||
| |||||||||
- 02A01 train
- 02A01 train with Love Live! livery
- 02A02 train
- 02A04 train before being expanded to 8 cars
- 02A05 train
References
[edit]- ^ "Metro breaks records" (in Chinese). Shanghai Metro 163 Official. 2019-03-09. Retrieved 2019-03-09.
- ^ "Operations Overview". Shanghai Metro Operation Co, Ltd. Archived from the original on 2011-11-09. Retrieved 2011-11-07.
- ^ "Shanghai Metro Lines 1 & 2". Movia. Bombardier. Retrieved 2007-10-14.
- ^ "Ridership". Sina. Retrieved 2012-05-03.
- ^ Yi, Li (28 May 2023). "From 6.6km to 831km: fun facts of Shanghai Metro". Shine.com.
- ^ Note that a new underground platform has been built at Zhangjiang station.
- ^ Extension of Line 2 to Guanglan Road Archived 2010-07-10 at the Wayback Machine Xinmin.cn, retrieved 24 February 2010
- ^ Extension of Line 2 Eastday.com, retrieved 24 February 2010
- ^ 上海地铁首次通入机场 虹桥机场2号航站楼将启用 Archived 2011-07-08 at the Wayback Machine, retrieved 15 March 2010
- ^ 轨道交通2号线东延伸二期 4月8日连通浦东国际机场, retrieved 7 April 2010
- ^ 2号线明起通至浦东国际机场 Archived 2012-07-15 at archive.today, retrieved 7 April 2010
- ^ Three Metro station names will be changed, Shanghai Daily, 21 October 2006
- ^ 'Shiji Avenue' new Metro station name, Shanghai Daily, 21 October 2006
- ^ "市政基础设施建设". shtong.gov.cn. Retrieved January 14, 2014.
- ^ "上海轨道交通2号线东延伸(广兰路站-浦东国际机场站)改造工程环境影响评价报批前公示". Archived from the original on 2017-12-23. Retrieved May 23, 2016.
- ^ "昨天!地铁2号线部分8节编组直达川沙了,但是..." Sohu. 29 December 2018. Archived from the original on 31 January 2019. Retrieved 31 January 2019.
- ^ 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
- ^ 2号线16日开到徐泾东站(图)_网易新闻中心. news.163.com. Archived from the original on 2016-08-14. Retrieved 2016-07-24.
- ^ 上海地铁2号线虹桥火车站站市区方向末班车22:48——中新网. www.chinanews.com. Retrieved 2016-07-24.
- ^ 上海地铁首次通入机场 虹桥机场2号航站楼将启用——中新网. www.chinanews.com. Retrieved 2016-07-24.
- ^ 上海地铁2号线西延伸段建成 浦东虹桥一线牵_世博_腾讯网. 2010.qq.com. Retrieved 2016-07-24.
- ^ 上海地铁2号线试通车--《城市公用事业》1999年06期. www.cnki.com.cn. Retrieved 2016-07-24.
- ^ 上海地铁二号线东延伸线建成. www.chinanews.com. Retrieved 2016-07-24.
- ^ 地铁二号线东延张江. news.eastday.com. Retrieved 2016-07-24.
- ^ 小编体验轨交2号线东延伸 带您实地探查"地形"-轨交 地铁 2号线—上海频道-东方网. sh.eastday.com. Retrieved 2016-07-24.
- ^ a b 小编体验轨交2号线东延伸 带您实地探查"地形"-轨交 地铁 2号线—上海频道-东方网. sh.eastday.com. Retrieved 2016-07-24.
- ^ 2号线今起通浦东机场 本网现场探营开通首日(组图)_网易新闻中心. news.163.com. Archived from the original on 2016-08-14. Retrieved 2016-07-24.
- ^ "Xujing East station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ Mayer, Matt. "East Xujing". Retrieved February 15, 2011.
- ^ "Shanghai Hongqiao Railway Station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "Honqiao Airport Terminal 2 station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "Songhong Road station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "Beixinjing station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "Weining Road station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "Loushanguan Road station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "Zhongshan Park station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ Mayer, Matt. "Zhongshan Park". Retrieved February 15, 2011.
- ^ "Jiangsu Road station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ Mayer, Matt. "Jiangsu Road". Retrieved February 15, 2011.
- ^ "Jing'an Temple station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "West Nanjing Road station" (Map). Google Maps. Retrieved February 15, 2011.
- ^ "People's Square station" (Map). Google Maps. Retrieved February 19, 2011.
- ^ "East Nanjing Road station" (Map). Google Maps. Retrieved February 19, 2011.
- ^ "上海市轨道交通2号线西延伸(徐泾东站—蟠祥路站)选线专项规划局部调整(实施深化)公示". Archived from the original on 2021-06-02. Retrieved 2021-02-27.
- ^ "本市17个交通建设工程集中开工 全面构建"五个新城"综合交通体系". 2021-07-01.
- ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
- ^ Metro-System Line 2, Shanghai, China Archived 2009-06-28 at the Wayback Machine, retrieved July 6, 2008.
- ^ Liu, Yu; Ou, Dongxiu; Wang, Xiaoyong; Dong, Decun (2021-12-14). Reliability and Operational Impact of "CBTC + TBTC" Dual-Signal Redundant Train Control System. American Society of Civil Engineers. pp. 418–429. doi:10.1061/9780784483565.041. ISBN 978-0-7844-8356-5.
- ^ Metro Line 2 signals faster service
- ^ "全球首例轨道交通"双套信号系统"模式成功应用". sh.people.com.cn. Retrieved 2021-07-11.
- ^ ["Non-inductive" upgrade The CBTC signal of Line 2 (Phase 1) was successfully cutover]
- ^ 上海地铁二号线西延线列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.